OBLYTECH Logo
OBLYTECH Logo

Instance Observer metric catalogue: what each category measures

Instance Observer groups its performance data into categories, each answering a different operational question. Transaction metrics describe page loads, database metrics describe queries and storage, and semaphore metrics describe queueing. Scheduler and job metrics cover background work, and the rest cover nodes, hosts, email, the ECC queue, chat, clusters, load balancers, sessions and replication.

Where the metrics come from and which package you need

Instance Observer tracks instance health and performance in near real time and keeps history for comparison. You reach it from Impact, under Platform Health, then Monitor. For the wider performance picture, see the platform performance KPIs guide.

Your Impact package changes what you can see:

Instance Observer feature Guided Total
Data look-back 45 days 6 months
Analytics Not included Included
Seats 5 10
Alert types 6 40 alert types

The Performance Analyzer guide covers a separate tool. The instance performance dashboard guide covers the dashboard view of instance performance and its metrics.

Transaction and response metrics

Transaction metrics cover classic UI transactions, classified as UI_TYPE. That excludes AJAX, Angular, REST, scheduler work, Agent Workspace and SOAP, leaving whole-page work such as forms and lists.

User transaction count is the instance-wide sum of those transactions. It shows when core business hours start and stop. A sudden change that holds for at least 10 minutes can hint at an extreme performance issue, but it is a secondary indicator and cannot be used alone for troubleshooting.

Average server response time is the weighted mean execution time for the same transactions. It excludes time waiting for a semaphore or for a prior transaction in the same session, network time to and from the instance, and client-side time in the browser or mobile device.

This figure follows the working day and looks more volatile at night and on weekends, when long reports run while ordinary traffic is low. No fixed threshold applies, because transaction types differ. Look for extreme deviations or a rise that coincides with another indicator.

Stacked time splits each transaction into three parts:

Component What it measures Review when high
Server time Milliseconds the server spends fulfilling a transaction Business rules, ACLs, SQL, semaphore wait and session wait
Network time Time to write the request bytes to the output stream The data each transaction streams; keep transactions lightweight
Browser time Client-side time, including rendering Client scripts and components

Server time is usually the largest part, and some transactions spend 90 percent or more of their time waiting on another transaction in the same session. The slow instance troubleshooting guide covers the next checks.

Database and replication metrics

Query response and throughput

SQL Response Time is the mean database response time, measured at the application layer from query send to response received. It includes network time between application and database servers. Queries usually finish in a few milliseconds, so one slow query rarely moves this mean. A jump that stays elevated for more than 15 minutes may correlate with a service-impacting issue, but it needs confirming with a primary indicator.

Database Response Time by Type splits the average by statement type. Slow Queries shows the longest slow query, usually from missing indexes or query design. Threads Running counts active process threads.

Size and undo history

Database Size combines total database size with primary shard size, recalculated each four hours, so read it as a growth trend. History List Length counts the InnoDB undo log entries that keep consistent snapshots. A value above 5 to 10 million is a concern on larger databases, and above 1 million on smaller ones.

Replication lag

Standby replication lag is the number of seconds a standby (far) database or read replica trails the primary. The usual cause is DELETE or UPDATE statements; INSERT is a rare cause. Pool replication lag measures the same delay in seconds. The ideal value is 0, and a non-zero value usually means heavy inserts, updates and deletes are slowing the processing of transaction bin logs.

Semaphore and queue metrics

Semaphores are the slots that process incoming work. The default pool serves end users, API_INT serves integrations, and AMB Send and AMB Receive serve channel messaging.

Metric Stated limit How to read it
Semaphore Default Mean 16 threads on the base system, per node (can be customized) Sustained usage of 10 or more can indicate a severe issue
Semaphore Default Qdepth Queue holds up to 150 A filling queue points to traffic spikes or long-running transactions
Semaphore Waiters Mean Users up to 16 per node, APIs up to 4 A high figure shows semaphore contention
API_INT in use and Qdepth Queue holds up to 50 Few free integration semaphores at peak load is common; a filling queue is the concern
AMB Send and AMB Receive Each queue holds up to 50 Read the same way as the other queues

If one node spikes, suspect the application layer; if all nodes spike together, suspect the database.

Rejected metrics count rejected executions per minute for each pool. A full queue returns HTTP 429, so the transaction is not processed, with potential loss of service. API_INT is the one to watch, because MID Servers use it to reach the instance. When every API_INT semaphore is busy and its queue of 50 is full, the instance returns HTTP 429 to MID Server requests, so it cannot receive their input. Ending long-running transactions frees semaphores.

Scheduler and job metrics

Completed Scheduled Jobs counts jobs finished per node, including scheduled reports, one-time SLA and workflow timers, repeating jobs such as Email Sender, and asynchronous business rules.

Scheduler mean queue age is the average age of unprocessed jobs in a node’s in-memory queue. It excludes time spent pending in the sys_trigger table before the node claimed them. A high value often means worker threads are busy with long-running jobs, which can be made less frequent, improved or staggered. In New York and later releases, a node that cannot process claimed jobs can return them to sys_trigger for other nodes to claim.

Scheduler queue length counts claimed jobs waiting in memory. The warning sign is one node staying above zero for more than 60 minutes while queue age rises. If several nodes show it, the instance may be overloaded with scheduled work.

Job details adds a 28-day Job Execution chart and 6-month top-job tables for executing, pending and recurring jobs.

Node, host and session metrics

Node CPU Time is CPU use in milliseconds per node. Node Memory Mean normally ranges from 1,000 to 2,000 MB in use, and Node Memory Max from 1,000 to 2,048 MB. If a node reaches 95 percent of available memory at least five times within 15 minutes, that node is almost full. Node Garbage Collection Time is the percentage of time in Java garbage collection, averaged from three samples taken 20 seconds apart.

Host health reports memory fields. meminfo_memavailable estimates memory available for new applications without swapping, mem_total is usable RAM, mem_free is unused physical RAM in kilobytes, and mem_swap is used once physical memory is full. mem_buffer and mem_cache hold disk blocks and files read from disk.

Session summary (end user) counts sessions on a node that ran at least one transaction, including login-page visitors. Session summary (logged in) counts active signed-in sessions. Nodes generally handle a few hundred, and counts approaching 1,000 may degrade performance. If all nodes are high, check timeouts against the reasonable reference of about 30 minutes with a 90-minute absolute maximum. If one node is unusually high, check for a recent restart elsewhere that moved users onto it.

ECC queue, email, chat and cluster metrics

The ECC queue connects an instance and a MID Server. Input and output message counts group messages by queue agent name, which is the external system. Average waiting time measures how old messages are while still in ready state, so a rising figure reflects MID Server load. Processed message delta shows the change in processed messages over five minutes.

MID Server status reflects communication with the instance, not whether the service is running. A down status can come from wrong credentials, a bad instance URL, blocked traffic or a stopped service.

Inbound email counts emails received as processed, ignored or failed; a processed count well below its usual level suggests the inbound reader needs investigating. Outbound email counts what the SMTP server handled. Zero sent means nothing was waiting or the SMTP server has failed.

Chat details shows AWA channel load: Chat Queued, Agent Available, wait time and arrival and acceptance ratios. A long live-agent queue with little virtual agent traffic suggests heavy live-agent load.

Cluster details shows node count, types, status and hosting across primary and standby data centers, and whether Advanced High Availability is enabled.

Load balancer metrics report container-level memory and CPU use, plus 2xx and 5xx response rates over five minutes.

Frequently asked questions

Which group should I open first when users report slow pages?

Start with transaction metrics. Stacked time shows whether server, network or browser time is high, and that points to the next group.

Why does SQL response time look normal when one query is slow?

The mean covers many fast queries, so a single slow query rarely moves it. Check Slow Queries and Database Response Time by Type instead.

Is a higher average server response time a problem on its own?

Not by itself. No fixed threshold applies, so look for an extreme deviation or a rise that matches another indicator such as semaphore waiters.

What does a 429 mean in these metrics?

The queue for that pool was full and the transaction was rejected, with potential loss of service. For API_INT, a full queue means MID Servers cannot send input.

For the wider set of guides, see the platform performance hub.