OBLYTECH Logo
OBLYTECH Logo

ServiceNow Listening Posts: Pulse Surveys, Themes and Questions

Listening Posts was the ServiceNow application for short employee pulse surveys. Starting with the Zurich release it is being deprecated and will be hidden and no longer available for activation, so the steps below describe how it worked. You build a theme first, attach one or more surveys to it, add questions directly or from a question bank, and then publish. A scheduled job turns each published survey into individual instances, and employees respond from an email link, an Employee Center widget or a chat channel.

How the parts of a pulse survey fit together

Listening Posts is layered, and building the layers in order keeps setup readable. A pulse theme groups surveys that share one purpose. Onboarding a new hire is a typical case: the theme holds a Day 1 survey and a Week 1 survey. Each survey holds questions, and when it is delivered the platform creates an instance for each person who should receive it. The instance is what the employee completes.

Pulse themes and their two types

A theme takes a name, a description, an active flag and a type. The type decides how audience and dates behave:

Theme type How audience and dates behave
Group pulse The audience, start date and end date are fixed for the theme
Employee lifecycle The audience, start date and end date vary with criteria, and a configured lifecycle event assigns the audience

The theme also has a filters field. Its defaults are department, country and title, and they refine the responses shown on the Pulse Dashboard.

Pulse surveys and their states

A survey is created under a theme. Its form asks for a name, the theme, a description, an active check box, a start date, an end date, and the audience and notification settings. A survey then moves through four states. It begins as Draft. It becomes Ready while it waits for the scheduled job, Published once its instances are available to the audience, and Closed automatically after the end date.

Audience can be added in the audience field, in the Survey Recipients List, or in both. When both are used, the combined list receives the survey. After publishing, the Pulse Users list shows the final recipients.

Two behaviors catch people out. Questions cannot be added or changed once a survey is published, so finish the question set first. Cancelling a published survey closes it, cancels the instances not yet taken, and leaves completed responses untouched. The Copy action makes another copy when you need a second version. For the general survey tooling, see Survey Designer in ServiceNow.

Writing questions and reusing them

Each question has a name, question text, a rating option such as stars or a number, a hover description, an order, and a few switches. Allow additional information adds a free-text box. Mandatory requires an answer before submission. Active marks the question as one used for assessments and metric calculations.

Questions can be built in the Pulse Question Bank or directly in a survey’s Questions list. A question bank has its own name, description and question list. A survey pulls bank questions in through the From Question Bank action.

Publishing and the scheduled jobs

Schedule Publish lets the scheduled job create instances when it next runs, which suits a survey with a future start date. Publish Immediately creates instances straight away. Publish Immediately appears only for surveys under a Group pulse theme, and it needs a start date of today or earlier with at least a day between start and end.

Two scheduled jobs do the work. The Listening Posts job creates instances for published surveys, and for ready surveys whose start date has passed. It moves surveys past their end date to closed. The Content Automation job creates surveys for published campaigns that carry pulse content. When the Re-evaluate campaign check box is set, it adds or cancels instances as people join or leave the campaign.

Anonymity levels

The survey’s anonymity level offers three settings. Non-Anonymous keeps the respondent’s name and demographic details with their answers. Anonymous keeps the answers alone. Employee Choice lets the respondent decide while taking the survey. Anonymity levels apply to surveys started automatically from a task. For a survey you build by hand, run a test survey and check what its responses record before promising a group anonymous answers.

Reaching employees and the Employee Center widgets

Respondents can answer from the email’s Take Survey link, the Take Survey widget in Employee Center, Virtual Agent, Slack, Microsoft Teams, the chat web client in Employee Center, or SMS. The Employee Center guides cover the portal these widgets sit in. For the chat channel itself, see ServiceNow Virtual Agent.

Listening Posts shipped pre-configured widgets:

Widget What it displays
My Survey A pulse survey as a widget
Take Survey The survey page with its questions
Survey List Surveys assigned to the user, in a list view
Feedback Bucket Fly-out notifications received after a task completes
Feedback Collection The pulse fly-out, which stays on screen for 10 seconds
Popup Survey A modal survey opened from the fly-out’s Give feedback button
Voluntary Feedback Popup The Give feedback button that starts a voluntary survey
Voluntary Feedback The questionnaire behind that button

The Employee Center plugin should be at the version your release requires, and the caller access settings for the widgets should be checked on your own instance. The Feedback Bucket, Feedback Collection and Popup Survey widgets are added to pages through their configuration, so confirm where they appear on your instance.

Running a voluntary survey

An administrator enables a voluntary survey by ticking its Active check box under Listening Posts. Employees then see a Give feedback button in Employee Center, which opens three prompts: I like something, I don’t like something, and I have a suggestion. Responses land in the Pulse users list on the voluntary survey page.

Reading results and sharing them

The Pulse Dashboard shows the reports you add to a theme, in the order you set, and the theme filters (by default department, country and title) refine the responses it shows.

A response sharing rule, created from a theme’s Response Sharing Rules list, decides who sees what. Its demographic condition limits the responses a viewer sees, and its user criteria name the users and groups who receive them. If the user criteria are empty, no notifications are sent. Reports added to a theme with an order number appear on the dashboard, with lower numbers first. For the wider process of acting on comments, see the employee feedback loop article.

For employee interaction, the User Experience Analytics dashboard needs the Listening Posts, User Experience Analytics and Service Portal Analytics plugins, the Listening Posts admin role, and a 30-minute refresh delay. It reports successful submissions, including time spent and comments, and unsuccessful attempts, including attempts to rate or comment that were not submitted. These events inform how future surveys are designed, or whether more encouragement is needed to raise participation. For what respondents said, use the Pulse Dashboard.

Roles, tables and the plugin

The Listening Posts admin role can create, read and delete all the records. The creator and manager roles create pulse surveys and open the dashboard, and the dashboard viewer role opens the dashboard. Demo data is available for the feature.

Table What it stores
Pulse Survey Details of each pulse survey
Pulse Theme Themes, each a group of surveys
Pulse Content Pulse surveys created as content
Response Sharing Rule Groups that receive shared responses

The plugin was activated from the ServiceNow Store and was available with the HR Enterprise package.

Connecting surveys to journeys

With Journey designer, create one pulse theme per journey type and build the survey under it. In Lifecycle Events, add an activity record of the Pulse Survey type to an existing event, select the survey, and assign the Pulse user field. The journey owner needs the Can view satisfaction score permission, and a response sharing rule handles manager access.

With Journey Accelerator, add a task template that uses the Pulse Survey task type and points at the survey, then place that template in a plan configuration through a stage configuration. Surveys can also start automatically. On a survey under an Employee lifecycle theme, feedback initiators name the assessment, the table, the user field and a condition such as state is closed. An initiator can trigger randomly, so the survey goes out a set percentage of the time when its condition is met. Initiators work with HR tasks in Listening Posts V3 or later, and the employee onboarding and lifecycle event guides describe the events that usually drive them.

Frequently asked questions

Can a question be edited after a survey is published?

No. Once a pulse survey is published, its questions cannot be added or updated. Finish the question set and check the wording first. For a changed version, use the Copy action and edit the copy.

What is the difference between Schedule Publish and Publish Immediately?

Schedule Publish lets the scheduled job create instances on its next run, which suits a future start date. Publish Immediately creates them straight away, and it appears only for surveys under a Group pulse theme.

Who can see the results?

The creator, manager and dashboard viewer roles can open the Pulse Dashboard. A response sharing rule controls which responses particular viewers see, using a demographic condition and user criteria.

How do voluntary surveys differ from pulse surveys?

Pulse surveys are scheduled, belong to a theme and can include your own questions. A voluntary survey is open to employees through the Give feedback button in Employee Center, and it offers a short questionnaire with three fixed prompts. Its responses appear in the Pulse users list on the voluntary survey page and in the voluntary feedback report.

Teams planning a rollout can start with the HR Service Delivery implementation page, which sets out how that work is scoped.