OBLYTECH Logo
OBLYTECH Logo

HR Predictive Intelligence Workbench Setup and Recommendations

HR Predictive Intelligence Workbench is set up in a few stages. An admin activates the HR content plugin, users who build use cases need the sn_piwb_hr_content.admin role, and then each use case moves from a template through training, testing and integration. Guided templates walk you through the steps inside the workbench, while classic templates hand off to the classic Predictive Intelligence screens.

Check the prerequisites before you activate the plugin

Activation is an admin task. The plugin is identified by its ID, com.sn_piwb_hrsd_content. Go to All, then System Applications, then All Available Applications, and search by name or ID. Select Install and wait for the completion message. If you cannot find the plugin, it may need to be requested through ServiceNow personnel.

Domain separation and delegated admin add one condition. The administrative user doing the install must sit in the global domain. If not, the install shows a message that it is unavailable because another operation is running.

Know what activation installs and which role does what

Activation installs several kinds of components, and the role is the one to plan around. The role sn_piwb_hr_content.admin covers the setup and day-two work, as the table shows.

Area What the admin role can do
Property settings Set the minimum number of predictions before an underperforming use case is judged, and the minimum net automation percentage before an auto-trained model is shown
User groups Create a workbench user group and assign the roles people need through model implementation
Notifications Configure the email that tells users a new model is trained and ready for evaluation
Templates Create use case templates and make them available to workbench users

The user group is the route for email. Add users or roles to it, and they receive notifications when a use case trains successfully, when a batch test completes, or when a training run fails. Process architects who create and train models receive the training-success and batch-test emails. The emails link to the trained use case or the test results, and test results can be downloaded from there.

Choose a template before you build anything

A use case starts from a template, and the template sets how much guidance you get. Guided templates include a full setup path inside the workbench. Classic templates include setup information too, but the solution definition is configured in the classic screens. Some templates show a label saying an auto-trained model is available. In that case you go straight to the evaluation phase, check whether the pre-generated model is acceptable, and then integrate it, tune it or build another one.

Use case Solution type Setup style
Predict the HR service for incoming cases Classification Guided
Predict the assignment group for incoming cases Classification Guided
Email case categorization Classification Guided
Similar closed HR cases Similarity Classic
User profile based recommendation Similarity Classic
Similar knowledge articles for HR cases Similarity Classic
Demand insights for case clusters that lack knowledge Clustering Classic
HR case resolution time Regression Classic

The HR solution definitions appear as templates where Predictive Intelligence and HR are both active. You can also create your own solution definition records when the templates do not fit your process. For the case records these models read from, see HR case management.

Work through a guided template from start to integration

The guided templates share one sequence.

  1. Go to Predictive Intelligence Workbench, then Use Cases, then Create New from Templates, and select the guided template.
  2. Enter a use case name and a short description, then select Start. Both are required before implementation begins.
  3. In the create and train models phase, enter a model name and short description. The data table, predicted field and processing language are filled in for you.
  4. Review the filters and input fields. Add criteria with New Criteria, move input fields between the Available and Selected lists, and save.
  5. Train the model. The workbench warns that training takes a while, so use View Progress to follow it.
  6. In the evaluate and tune phase, open the model record and read its Precision, Coverage and Net Automation scores. Adjust the retraining schedule if needed, then update or update and retrain.
  7. Test the model. A single test is the default; choose batch test when you want to compare more than one model. Set how many top results to show, add a short description, and run the test.
  8. Integrate the model that performs best and confirm the action.

The retraining schedule defaults to a single run. That gives you time to review the setup before the model retrains on a recurring basis, and the recurring options run from every 30 days up to every 180 days.

Once a model is integrated, you can confirm the mapping under HR Administration, then HR AI Configurations, then Solution definition.

Set up a similar-case recommendation in the classic workflow

When you start a classic template such as Similar closed HR Cases, a pop-up shows the model name and says the use case continues in classic Predictive Intelligence. Select Take me there to reach the Machine Learning Solutions landing page, open the Similarity entry, and select Configure. Check the default values on the form and adjust them for your data.

Once the model is trained, an HR case shows a Similar Closed HR cases option. An agent opens it to see the closed cases that best match the request in front of them, which helps when a request resembles one the team has already resolved.

The employee profile template uses a different signal. It finds users whose profile resembles the employee’s, then looks at the knowledge articles those users have viewed and the catalog items they have submitted. When it is live, the employee sees the top three knowledge articles and the top three catalog items. The setup path is the same classic route through the Similarity definition. For what a profile holds, see HR profile explained.

The two recommendations serve different people. For the knowledge side of these recommendations, see HR knowledge management. The closed-case option helps agents resolve cases, and the employee profile option helps employees find content on their own.

Estimated time to resolve, and the regression restriction

The estimated time to resolve feature predicts how long a case will take from attributes such as its short description, category and priority. Employees get a clearer expectation, agents can prioritize their queue, and managers get data for SLA discussions.

The model is a regression solution, so it returns a point estimate with a prediction interval. Support for creating new regression solutions was deprecated in the Washington DC release. You can still train and edit an existing one, but you cannot start a new one, so the template’s instructions describe a legacy route. Plan around that before you commit to this feature.

The model is configured and trains automatically when three conditions are met. The Human Resources Scoped App: Core plugin must be installed, the Predictive Intelligence for Contextual Search plugin must be installed, and the system property that enables automatic training must be set to true.

Training reads from the HR case table. The minimum is 10,000 records and the maximum is 300,000. The output field is a numeric resolution-time field, and the input fields are the descriptive and classification fields on the case. A word corpus is optional. If you leave it out and the input has text columns, the regression builds a corpus from them that other solutions can reuse.

Four values are recorded for each case. Actual resolution time stores the elapsed time from opening to closing. Min ETTR and Max ETTR hold the lower and upper estimates in days, and ETTR in days holds the point estimate. When you upgrade, run the Populate Actual Resolution Time schedule job once so older HR cases have a value.

The ML scheduler also caps training. An instance can commit to 50 new training requests in a 24-hour window. Scheduled retraining, clustering and similarity updates do not count toward that cap.

Keep models accurate as conditions change

Predictions can drift as business conditions change. You can retrain, modify the solution, or create a new one to reflect the change. Test and adjust the business rules that use a model over time, so they keep working across each place the result appears and for each user persona. Treat the evaluation scores as a regular check. A drop in precision, coverage or net automation is a prompt to review the filters and input fields.

Frequently asked questions

Who can install the plugin?

The install needs the admin role. On instances with domain separation and delegated admin, the admin must also be in the global domain.

Why do I not see the HR solution definitions as templates?

They appear when Predictive Intelligence and HR are both active on the instance. Confirm both before assuming the templates are missing.

Can I still start a new regression model for resolution time?

No. Creating new regression solutions was deprecated in the Washington DC release. Existing regression solutions can still be trained and edited.

What is the difference between a single test and a batch test?

A single test checks one model and is the default. A batch test compares more than one model in the same run.

Who receives the training and testing emails?

Process architects who create and train models receive the training-success and batch-test emails. Anyone else must be added to the user group.

For the general solution setup for Predictive Intelligence in IT service management, see the Predictive Intelligence hub. For a checklist to run before go-live, see the testing and acceptance checklist. The HR track itself is on the HR service delivery hub.