Workplace Central lets a space planner assign spaces to departments, cost centers, neighborhoods and workplace entities, test those changes in a scenario, and deploy the approved result. Allocation work runs through the Space Optimization dashboard, the Space Planning module and the floor map.
Allocation types and the actions that change them
An allocation ties a space to the group that uses it. You choose an allocation type first (department, cost center, neighborhood or workplace entity), then the matching group. The Edit space allocation pop-up also asks for an allocation profile, either the user profile or the workplace profile, and an allocation percentage for the share of the space that group receives.
| Option | Effect on the selected spaces |
|---|---|
| Change allocation | Changes the existing allocation to the group you choose |
| Add allocation | Adds a new allocation to the selected spaces |
| Remove allocation | Removes the selected existing allocation |
| Remove existing and replace | Swaps the current allocations for the new one |
| Add to existing | Keeps the current allocations and adds the new one |
Check the mode before you apply: Remove existing and replace swaps out the current allocations, while Add to existing keeps them. For workplace entities, if you add both a parent and a child entity, the map legend shows the child.
Working from the Space Optimization dashboard
Space Optimization brings scenario metrics and building information onto one page. The metric tiles count all scenarios, the scenarios you own, the draft scenarios and the published scenarios. Selecting a tile opens its list, and View all opens the full list in a separate tab. Copy creates a version of one scenario named with “- Copy 2” to make new changes without touching the original. Delete removes one or more scenarios you no longer need.
Reading a building stack plan
Selecting a building opens its stack plan, which shows a bar for each allocation on each floor. Bars take the color of their department or cost center, and unallocated spaces are counted for the building and for each floor. The View by setting offers nine options: Department, Cost center, Neighborhood, Workplace Entity, Space type, Assignment type, Space status, Space function and Occupancy status. Workplace Entity adds a Workplace Entity Type field.
The floor map view appears when Workplace Indoor Mapping floor maps are configured for the building. A scenario cannot be changed from the building view, so copy it and edit the copy. The copy takes the building’s exact data, and its changes stay out of the main data until the scenario is deployed.
Editing a scenario on the floor map
Editing requires a scenario in the Draft state and Indoor Mapping selected as the map provider. Open the scenario from the All scenarios list, select the Floor map tab, and choose Edit scenario in the View options card. The Group by option fills itself from the sn_wsd_core.ALLOCATION_TYPE system property.
- Select spaces by holding Shift and drawing a circle, or use the filter icon with a condition such as Space type is Room.
- From the Actions drop-down on the Space details panel, choose Allocation, Assignment type or User assignment.
- For an allocation, choose Change, Add or Remove allocation, set the Allocation type field, and select Apply.
- Save the scenario.
User assignment places one or more users on a single selected space, and the remove assignment option on the Assignment card takes a user off it. Map settings control whether assigned users and the flexible or permanent assignment type appear on the map. With Neighborhood as the group by option, the map applies neighborhood assignments. Any other group by option applies location assignments.
Reviewing allocation changes before deployment
When a live change affects a scenario, the Space Details panel shows a warning. Review the change, edit the scenario to match, and select Move to valid before you continue. The Space Allocation Type Change Tracker table lists each change.
| Type of change | Meaning | Response in the scenario |
|---|---|---|
| Inactive | The allocation was made inactive | Remove the affected allocations |
| Deleted | The allocation was deleted | Remove the affected allocations |
| Reparent | The parent of a workplace entity changed | Move existing spaces to the previous parent, then allocate from the new parent |
Deleted record ID is filled for deletions, and Previous parent is filled for reparented workplace entities. Domain and Parent table show where the allocation was stored.
From space request to deployment
A request raised in the Workplace Service Portal becomes a workplace case with generated space plan options. The requester picks one, and the planner works the case on the Space Optimization dashboard. Choosing the None option closes the request as Closed complete. Approval runs through the Workplace Core approval configuration. A profile that needs no approval moves straight to Approved. For the wider service flow these requests belong to, see workplace service delivery workflows.
| State | What it means |
|---|---|
| Ready | Space plan options are still being generated |
| Work in progress | Options are available and the requester is choosing one |
| Awaiting approval | The requester’s profile needs manager approval |
| Approved | The request can be deployed |
| Deployment in progress | Each allocation has its own workplace case |
| Closed complete | The requester chose None, or the deployment succeeded |
| Closed incomplete | The approver rejected the plan, or a deployment case did not finish successfully |
Deployment is available for Approved requests. The deployment succeeds when all of its workplace cases close as complete, and a single incomplete case makes it unsuccessful. The Space Deployment plan lists the space, floor, building, type of change, current and scenario values, number of updates, last update time and workplace case. Assignment type changes have no workplace case.
Capacity and utilization in the optimization reports
Workplace Central and Workplace Space Management need valid entitlements. An admin runs the scheduled job Workplace Analytics Space Management report data generation to calculate capacity and utilization for all spaces. Access requires one of the roles sn_wsd_spcmgmt.space_planner, sn_wsd_spcmgmt.manager, sn_wsd_rsv.manager or sn_wsd_core.workplace_manager. Default reports cover the past year, and the Date, Region, Site, Campus, Allocation and Workplace entity filters narrow them.
Capacity is the number of hours an active space can be reserved, calculated from the day start and day end reservation properties. A permanent seat’s utilization uses the same two properties. For other employees, utilization counts reserved time inside the working shift. Take an office day of nine hours with a meeting room reserved for eleven. The recorded utilization is nine hours, because unallocated hours on a reserved day are left out. A shared desk is credited to the workplace entity of the person who reserves it. For how reservations are made in the first place, see workplace reservation management.
| Report facet | What it compares | Calculation |
|---|---|---|
| Peak utilization days | Average utilization for each weekday | Weekday utilization hours divided by the spaces available that weekday |
| Space utilization by workplace entity | Average capacity per entity | Total entity capacity hours divided by the spaces available to that entity |
| Space type utilization | Average capacity and utilization per space type | Type capacity hours, based on office hours, divided by the spaces available to it |
The Capacity vs utilization facet compares available space resources with occupancy, and the dashboard widgets can be customized with UI Builder. For the dashboard layout side in general, see workspace dashboards.
Maintaining spaces, profiles and floor assignments
The Space Planning workspace opens on the Floor plan tab, with Spaces and Scenarios tabs alongside it. On the Spaces list, New creates a space and Edit applies one value to all selected spaces, so changing Is reservable makes them all reservable. Edit allocation and Remove allocation manage allocations. Export produces Excel, CSV, JSON or PDF, delivered as a download or by email.
On the Workplace users list, Assign creates a Location or Neighborhood assignment. A location assignment needs at least a campus and a building. Unassign can clear the primary location, all location assignments, or all neighborhood assignments. Edit applies to all selected users, so setting the Workplace entity moves them all to that entity.
The floor plan details panel shows space count, total effective capacity, profiles assigned, unassigned spaces and the assignment ratio. Total effective capacity multiplies each space by its capacity ratio. For example, 20 spaces at a ratio of 1.5 and 10 spaces at a ratio of 1 give a space count of 30 and a total effective capacity of 40. A user assigned to two spaces counts as two profiles. Space admins can add custom KPIs to the floor plan details panel when Workplace Space Management is installed. For the building and floor setup behind these floor plans, see facilities space management: floor plans and buildings.
Why should reservations, check-ins, badge events and sensor counts be reported separately in space planning?
Each source measures a different event. A reservation records intent to use a space, a check-in confirms that a booked person actually arrived, a badge event shows entry to the building, and a sensor count records presence in a room or zone. Merging them into one occupancy figure hides which of those things happened.
What each signal can and cannot tell you
- Reservations show what was planned. They say nothing about whether anyone arrived.
- Check-ins confirm that a booked person arrived. A blank can mean nobody came, or that check-in was never set up for that space.
- Badge events show entry to the building. They cannot reliably identify an occupied desk.
- Sensor counts record people detected in a zone. An anonymous count need not identify anyone, so it sizes demand without attributing it to a team.
Why booked time is not the same as used space
A reservation records booked time, not whether the space was used. A reserved room that sits empty still counts as booked, and a desk held all day by a no-show looks busy on paper. Check-ins and sensor counts close that gap, so read them beside the booking figure before deciding that space is short.
A four-line reporting model
- Name each measure after its source: booking intent, confirmed check-in, building entry and measured space use.
- Publish which floors, rooms and desks have sensors, badge feeds or check-in switched on.
- Show no-shows and walk-ins as their own lines rather than netting them out.
- Put any combined occupancy view last, with its definition printed beside it.
Privacy limits on combining the signals
Joining badge events and sensor counts to named reservations can make individuals identifiable. Keep identifiable presence data more restricted than aggregated dashboards, and suppress small-group reporting where a person could be inferred. As of November 2026, New Zealand’s privacy regulator advises employers to collect only what legitimate functions need, and Canadian regulators call for necessity and proportionality, and California’s privacy regulator states that CCPA requirements apply to covered businesses’ employee data, so check applicability before identifiable reporting starts. A space planning purpose does not automatically cover attendance.
The failure to avoid
The common failure is treating booked capacity as actual occupancy, often through one tile that adds bookings to sensor counts. A single number like that hides which signal is wrong.
Frequently asked questions
Can a scenario be edited from the building view?
No. Copy the scenario and edit the copy. The copy keeps the exact building data, and its changes stay out of the main data until the scenario is deployed.
Why does a scenario show a warning on the Space Details panel?
Allocation changes in the live instance affect the scenario. Review the change in the Space Allocation Type Change Tracker table, edit the scenario to match, and select Move to valid before you continue.
Which assignments does the floor map apply?
It depends on the group by option. With Neighborhood selected, the map applies neighborhood assignments. With any other group by option, it applies location assignments.
Why is recorded utilization lower than the reservation length?
Utilization counts time inside the working day, which the day start and day end reservation properties define. A meeting room booked for eleven hours in a nine-hour office day counts as nine hours.
What should I check after moving Workplace Central data to another instance?
Check the scenario and allocation data on the new instance before you rely on it.