OBLYTECH Logo
OBLYTECH Logo

Configure Workplace Visitor Management Visit Requirements

Setting up Workplace Visitor Management before a visit means configuring four things in order: visitor types, visit requirements, visitor policies and the scheduled emails that remind guests. In version 2.0.0 and later, policies live inside visit requirements, so the requirement is the place to start when you decide what a guest must complete before arriving.

Why the setup order matters

Each layer depends on the one before it. The visitor type groups a guest when someone adds them, the visit requirement decides which questions and documents appear in the pre-check tasks, and the policy decides what the guest agrees to. Building in that order lets you test each layer as you go. For the wider picture of how these workplace tools fit together, see the Workplace Service Delivery overview. Creating types, requirements and policies takes the admin role sn_wsd_visitor.admin, and viewing policy confirmations takes sn_wsd_visitor.staff.

Create visitor types that match how guests arrive

Go to Administration, select Visitor types and choose New. The name is for administrators, and the form’s example is a label such as prospect or candidate. The label is what the person adding a visitor sees, so write it the way a receptionist would say it aloud. The order field controls sequence, with lower numbers appearing earlier, so place the usual type near the top. Turning off the Active setting stops the type from being displayed while visitors are added.

The availability condition makes a type location specific. A contractor type, for example, might suit one campus. The detail that catches people out is nested locations. A condition that names just the campus does not reach the buildings, floors and spaces beneath it. Add one condition per level, each dot-walked from the nested location up to the parent. For the field-level basics, see dot-walking explained. That takes longer to write than a single campus check, but the type then appears where its Available if conditions match.

Build visit requirements in the right order

Navigate to Visit requirements under Administration and select New. Save the record before adding anything beneath it, because the additional information lists appear once it exists. The initial requirement option has the widest effect. When it is selected, the requirement appears on the visit creation page for the host and receptionist, and it comes first in the kiosk self-registration flow, and the workplace services kiosk guide covers the kiosk side of these tools. Initial requirements also feed the Workplace Concierge agentic workflow when that workflow creates visits. A visitor’s name and email belong in this group.

Requirements that are not initial are conditional. They appear later in visit creation, and the Apply if field decides when. That field is unavailable on initial requirements, so a requirement is one kind or the other. A licence plate or a VIP status suits the conditional pattern. Apply if uses the same dot-walked conditions as visitor types. The Building A condition lists the building, then each floor, area and space dot-walked back to it. Check each level after saving, because a missed level is easy to overlook when the condition is written. For the building and floor records these levels refer to, see facilities, space management and floor plans.

The order number sets each requirement’s place in the pre-check tasks. Guests work through them in sequence, so give the key requirements the lowest numbers and leave gaps for later additions.

Setting Initial requirement Conditional requirement
Where it appears Visit creation page; first in kiosk self-registration Later in visit creation, when Apply if matches
Apply if field Not available Available
Typical example Visitor name and email Licence plate or VIP status

Add the information and agreements a requirement collects

Each requirement can hold additional information records of three types. Additional information, such as dietary restrictions, appears in the first section of the pre-check tasks. Document to upload, such as a visitor ID, appears in the second. Document to acknowledge, such as a policy, appears in the third and links to a policy record through its Acknowledgment tab.

Filled by sets whether the host, the guest or both answer a record, and Mandatory for sets who must complete it. Choosing none makes the field optional. Keep the label short, because it is what the person reads on the portal page, and place any explanation in the help text. The Field mapping tab can store an answer on the visitor record itself. Company information can be mapped to the Organization field on the visitor table, so the answer lands on the record.

Attach visitor policies to requirements

Under Administration, open Visitor Policies and select New. The full description is the text visitors read and accept, so it must make sense on its own. The short description is a summary for the record and does not replace it.

In version 2.0.0 and later, add a Document to acknowledge record to a visit requirement, select the policy on that record’s Acknowledgment tab, then, if the requirement is not an initial requirement, use its Apply if field to limit it to the relevant locations. The policy becomes one step in the same sequence as the rest. A setup built around location rules therefore needs that requirement step added before visitors see the policy, which makes it the first change to plan before an upgrade.

In version 1.19 and earlier, assign the policy through the Locations related list and open the location policy record for each location. That record decides whether the policy applies to internal visitors, external visitors or both, and each side has its own signature setting. Signatures are stored on the visitor policy confirmation record, not on the policy, so the text and the individual acceptances stay separate.

How visitors respond and where you check their answers

From version 2.0.0, accept and decline buttons are removed from visitor emails. Visitors accept on the visitor portal, or at the kiosk during check-in, adding a signature at that step if the configuration asks for one. In version 1.19 and earlier, a visitor could decline from the email or on the Visitor Policies page, which confirmed the decision and offered a Go back link. If a visitor accepts before arrival, the policy is not displayed again at kiosk check-in, which explains why reception may not see the step for someone who has already finished it.

The policy confirmation record holds the outcome. Its state updates automatically to accepted, declined or not responded. Staff open Visitor policy confirmations under Administration, or follow the link from the visitor registration, and a signature appears on the record as an image. Anonymizing a visitor removes that signature, so retention plans should not assume it survives.

Set the reminder emails that carry these steps

Two scheduled jobs send automated visitor email. Send visitor policy confirmation reminders runs daily by default and reminds visitors who have not confirmed a policy. Send visitor registration emails covers upcoming or pending registrations and runs every hour by default. Both are scheduled script execution jobs found under System Definition, then Scheduled Jobs.

The Run field sets the pattern. Daily takes a Time, such as 15:00:01 for a three o’clock run. Periodically takes a Repeat Interval, such as one hour. Weekly and Monthly take a Day and a Time. The time zone is optional. Leave it blank and the job runs in your own time zone, or choose Use System Time Zone to run it in the instance time zone.

The defaults are a starting point, and the right cadence depends on lead time. A policy exists so that a guest accepts it before arriving, so write the text for someone reading it on a phone the day before, not for the internal review group that approved it. A daily policy reminder leaves little room for a guest who registered that morning to respond before a same-day visit, while an hourly registration email may feel excessive for a visit weeks away. Check how far ahead your visitors usually register at each site, then set the intervals to suit.

What changed in version 2.0.0

The table below sets out the differences that affect this setup, so you can see which parts of this guide apply to your version.

Area Version 1.19 or earlier Version 2.0.0 or later
Visitor type A field on the registration An entity with a built-in Internal type
Policy placement Linked to locations Part of visit requirements
Policy emails Accept and decline buttons Buttons removed; acceptance on portal or kiosk
Kiosk pre-arrival check-in Requirements not completable Requirements completable before arrival

Under 2.0.0 a policy reaches visitors through a requirement, so a carried-over setup needs that wrapper added. The kiosk change moves work forward, since a visitor who completes requirements before arriving leaves fewer steps for reception on the day. Version 2.0.0 also adds the full street address for campus and building locations to visitor emails, so check how your reminder wording reads against a real visit. For how these pieces sit inside day-to-day workplace work, see the workplace service delivery workflows article.

Does a visitor invitation or printed badge let a visitor through a door, and what must be specified separately?

No. A visitor invitation or printed badge shows that a visit exists and that a guest was registered or issued a badge. It does not show that a door controller has received an access grant. Door access needs a separate integration, and the specification has to name each step.

Badge printing and door access are different outcomes

Visit records hold registration, approvals and badge printing. A door lock sits in a separate system, and a badge record does not show that its controller has received a grant. Treat a printed badge as evidence of a visit, not evidence of access.

Five items to specify separately

  1. Inbound badge events. Decide how access or badge data reaches the instance. As of November 2026, badge data can arrive as CSV files over SFTP, so the route is feasible. Confirm the access-control export matches that shape.
  2. Identity and building matching. A badge number has to resolve to a person or visitor record, then to a building, floor and space. Name the join field, who keeps it current, and what happens when a badge matches no record.
  3. Attendance or check-in logic. State whether a badge tap is a check-in, an attendance entry, or neither. Keep reservation, check-in and sensor reports apart, because they are different kinds of evidence.
  4. Outbound credential provisioning. Decide whether the platform sends a grant request, who approves it, and whether the grant is limited to the visit window and the floors on the visit.
  5. Revocation and failure handling. Specify the revocation time after a visit ends or is canceled, what happens when a grant fails to reach the controller, and who receives the failure. A failed grant that looks like a successful check-in is easy to miss.

Confirm vendor support before scoping the build

Badge integration support is not universal across access-control vendors. Ask each vendor for its exact export format, the timing of events, whether it accepts inbound grant requests, and how it reports a failed grant. Record which direction each vendor supports before the design is signed off.

What to request in the scope document

  • A data flow diagram that shows every system a badge event passes through.
  • A sample export or event record from the access system, with fields mapped to visitor or location records.
  • The rule that decides which visitor types, visit requirements or floors receive a grant.
  • The revocation time, stated in minutes, after a visit ends or is canceled.
  • A named owner for failed grants and the channel where that owner is alerted.

Frequently asked questions

Can I hide a visitor type from the people who add visitors?

Yes. Turning off the Active setting stops the type from being displayed while visitors are added.

Why does a conditional requirement appear on some visits and not others?

It shows when the visit meets its Apply if conditions, which can test the location, the visitor type or other conditions. Check each level of the location tree, because a condition written for a campus does not reach a building or floor unless it is dot-walked to the parent.

What happens if a visitor accepts a policy before the visit?

The policy is not displayed again during kiosk check-in, so the visitor moves through the remaining steps.

Where are visitor signatures kept, and what removes them?

A signature is kept on the visitor policy confirmation record as an image. Anonymizing the visitor removes it from that record.

Do I still need location-level policy assignments after upgrading to 2.0.0?

Location-level assignment is the route for version 1.19 or earlier. In version 2.0.0 and later, attach the policy to a visit requirement and apply that requirement to the locations it should cover.