A Workplace Services Kiosk gives visitors, guests and workplace users a booking point on a shared screen. On the device, a visitor searches a floor map, picks an available desk or meeting room and reserves it. Setup means building a kiosk reservable module, wrapping it in a kiosk configuration, then binding that configuration to a device. For the wider picture, see the workplace service delivery hub.
Before you install
Under Subscription Management, confirm that the Workplace Core plugin is active. Then install the application from the ServiceNow Store under System Applications, using the application ID sn_wsd_kiosk. Resolve any plugins the installer lists first. The reservation side also needs Workplace Reservation Management, Workplace Central, Workplace Indoor Mapping and Workplace Space Management.
The installer offers demo data. Demo records suit a test instance, but they cannot be loaded later, so decide during installation.
Three roles control access:
| Role | What it lets the holder do |
|---|---|
| sn_wsd_kiosk.admin | Configure kiosk features and the kiosk experience |
| sn_wsd_kiosk.operator | Bind a kiosk configuration to a physical device |
| sn_wsd_kiosk.viewer | View and use the kiosk, including making reservations |
The viewer role includes sn_wsd.core_workplace_user, the role an employee signs in with to search a floor map and reserve a space. For the general access model, see instance security and access control.
Configure the kiosk reservable module
Reservations are set up in Workplace Reservation Management. For the wider setup, see the workplace reservation management setup guide. Open the Kiosk module under Reservable Module, add a name, title, inline title and image, and tick Active.
Choose what can be booked
Specific unit shows each individual desk or room in search results. Container shows a group instead, and the system assigns an available space from inside the group when someone books it. Container results are grouped by Area by default.
For a container, the bookable quantity comes from the capacity values on its spaces in the Workplace Core Space table. Set the reservable type to Locations. When Location is chosen, the reservable table must be the Space table [sn_wsd_core_space] or one of its extended tables. Tick both Active and Is reservable on each room the filter picks up, or inactive rooms will appear during booking.
Set the booking rules
Set Available in to Kiosk reservation, and remove any other options such as Advanced Reservation, Quick Reservation or the Outlook add-in. A kiosk module cannot be shared with other experiences. If other options stay selected in Available in, the form shows an error message saying so.
The All day setting changes what the visitor sees:
| All day setting | What the visitor sees |
|---|---|
| Disabled | No All day option; the date is fixed to today and read-only |
| Default | All day is offered, with the current office time preselected |
| Enabled | All day is offered, and start and end times are rounded off, for example 11:30 to 12:30 |
| Required | All day is shown as selected and cannot be changed |
When All day is in use, the All day meaning decides the window: Full day (00:00 to 23:59) or Office hours, such as 9 am to 5 pm, in the building time zone.
Max days in Future caps how far ahead a visitor can book. Min duration and Max duration set the shortest and longest booking, and a booking outside them shows an error on the kiosk map. Show as (Busy or Free) appears when Workplace Calendar synchronization is installed. Under the Reservation Widget Configuration tab, Require Subject makes the subject field mandatory.
Finally, open Workplace Central, select the Kiosk Indoor Mapping icon, and set the default map configuration for this module.
Build the homepage, configuration and module
A kiosk needs a homepage, a configuration and at least one module. The configuration form links to a homepage, so create the homepage first.
Create the homepage
Under Kiosk management, open Kiosk homepage and create a record with a Name, Title, Subtitle, Description, Logo and Background image. This is the first screen a visitor sees.
Create the kiosk configuration
Under Kiosk management, open All Kiosks. Versions 1.1.0 and earlier list these under Kiosk configurations instead. Complete the form:
| Field | What to enter |
|---|---|
| Name | The name of the physical device |
| Homepage configuration | The homepage record you just built |
| Managed by | The user group responsible for the device |
| Location | A campus, a building or a lower-order location, not a site or region |
| Default language | The language the device opens in |
| Single module mode | When on, the lowest-order linked module is shown |
| Device ID | Generated automatically |
The Location field also controls the host list. An employee appears as a host on the kiosk when their Workplace Profile location matches the kiosk location. If a colleague is missing from the list, check their profile first.
Then add rows to the Kiosk module configurations related list. Each row links a module configuration to the kiosk, sets whether it is Active, chooses a primary or secondary colour Type, and sets the Order of preference.
Create the module
Under Kiosk modules, create a module with a Name, a Title and an Entry point. The three values are visitor_check_in, visitor_check_out and kiosk_indoor_map. Choose kiosk_indoor_map to show the indoor map. Each module configuration points at a configuration table and a condition, and the condition should match one record, such as a sys_id.
Tick Requires Camera when a flow needs it. The field switches on automatically when a flow uses QR code authentication or a visitor picture.
Bind the kiosk to a physical device
Binding happens on the device itself, and it needs the sn_wsd_kiosk.operator role. Sign in on the device, open the Select Kiosk tab on the setup welcome page, and choose the kiosk you built. Confirm first that it links to a reservable module and that spaces are configured for that module, because the kiosk has nothing to offer otherwise.
Select Continue, then grant camera access in the browser prompt by choosing the option to always allow the camera. Then select Save kiosk. On Safari, the camera permission must also be set in the browser settings. On Chrome for iOS, permanent camera access is not permitted, so camera functions on the kiosk are disabled. Check the browser before you choose the device.
Once a device is bound, its setup page offers Remove Kiosk, Change Kiosk and Update Kiosk. Change Kiosk assigns a different kiosk and repeats the camera step. Update Kiosk refreshes camera permission.
The Kiosk Status table records each device’s last activity and camera state. The heartbeat delay property sets how often a device pings the instance, and the reset delay sets how long it can sit idle before returning to its home page.
What a visitor does on the kiosk
A visitor with the viewer role selects Explore Map. The Explore Workplace page shows the locations on the map. The visitor then chooses a building and a floor from the menu, and selects a space. A details card appears with Get directions and Reserve.
Reserve opens the Reserve a space page with the space on a schedule view calendar. The visitor sets a date, a From time, a To time and, if required, a subject, then selects Submit reservation. The date follows the All day rule, and a calendar appears when Max days in future allows more than one day. Workplace services cannot be added to a kiosk reservation, and recurring, neighborhood and browse-near-a-person reservations are not supported on the kiosk.
If the space is taken before the visitor submits, the kiosk says it is no longer available, refreshes the schedule view, and deactivates Submit reservation until a new time is chosen. The kiosk does not send email notifications to workplace users after a reservation is confirmed on the device. For how email notifications work in general, see notifications and email handling.
Get directions takes a current position and a destination, with an accessible or default route.
Raise an issue and handle errors
A space shows a Raise an issue tab instead of Reserve in two cases: it is already reserved, or its space type on the map does not match the space type configured in the kiosk module. The ellipsis icon on the details card also offers Raise an issue.
The form asks what the visitor needs help with, the urgency (Today, This week or Next week) and the user the issue is for. Submissions become cases.
When a run-time error occurs, the visitor sees a generic error page, and the detail is written to the system logs. Common causes to check first:
- The kiosk sent a request without the required parameters.
- The flow configuration record is missing from the Kiosk module configuration table.
- The indoor map configuration record is missing from the Kiosk indoor mapping configuration table.
- The configured view type cannot be reached by the kiosk viewer role.
- The campus, or the floor holding the kiosk or its camera, is outside the configured view type.
Frequently asked questions
Can a visitor add a workplace service to a kiosk reservation?
No. Workplace services cannot be added to a reservation made on the kiosk.
Can a kiosk user book a recurring meeting room?
Not on the kiosk. Recurring, neighborhood and browse-near-a-person reservations are not supported there.
Why does a space show a Raise an issue tab instead of Reserve?
The space is already reserved, or its space type on the map does not match the space type set in the kiosk reservable module.
Why is the date locked to today?
The All day setting on the reservable module is Disabled, and the date is read-only. Change the All day setting from Disabled.
Does a visitor get an email after booking on the kiosk?
No. Email notifications are not sent to workplace users once a reservation is confirmed on the kiosk.