OBLYTECH Logo
OBLYTECH Logo

ServiceNow Facilities Space Management: Buildings and Floors

ServiceNow facilities space management arranges a campus as a hierarchy of campus, building, level and space, and rolls occupancy and area up through it. Set up buildings and floors first, mark spaces where people sit or work, and then use the interactive floor plan if offered, so staff can locate spaces and users can raise facilities requests from the map.

How facilities space management fits together

The Facilities Service Management application defines space at each level of the hierarchy with the same unit of measure. That shared unit is what makes metrics such as occupancy percentage and total available space comparable, whether you are looking at one room or a whole campus. In the Yokohama release the hierarchy runs, top to bottom, as campus, building, level (floor) and space.

Layer What it represents Where it is created
Campus The site that holds one or more buildings First layer of a customer-created map
Building A structure with a unique name, assigned to a campus All > Facilities > Space Management > Building
Level A floor, a basement, parking levels or outdoor areas All > Facilities > Space Management > Floor
Space A room, desk or other area, stored in the fm_space table Facility Spaces section on the level record

A site with unusual space types can add its own. New space definition tables extend fm_space, so a cubicle or a bathroom can have a table of its own. When a map is parsed, the sys_class_name of an existing space (values such as fm_bathroom or fm_cubicle) is only updated when both preserve settings are set to No. Set the correct access control lists on each new table as you create it.

Setting up buildings and floors

Creating a building requires the admin role. Go to All > Facilities > Space Management > Building and click New.

Field What to enter
Name A descriptive name for the building
Campus The campus where the building is located
Floors The number of floors the building has
Location A location defined in Organization Management, set at the address level rather than the floor level
Usable area The part of the building available for creating spaces
Gross area The total area, including space that is neither usable nor assignable
Assignable area A display field showing the part that can be assigned to users
Area unit Square feet or square meters
Utilization min and max Numbers defining the minimum and maximum utilization
Current occupancy, max occupancy, percent occupied Current occupancy counts the users currently associated with the space through business rules on the Associated User table. Max occupancy and percent occupied roll up from the spaces beneath it. All three depend on the Occupiable option

Pick the area unit now and keep it. Roll-up calculations need every space to use the same area unit to work properly, so a building in square feet with floors in square meters is not a set the roll-ups can calculate correctly.

After you save, Related Links offers Show Floor Plan and View Facilities Schedule, which creates a blackout so no work is scheduled in a defined area for a set period. Floors are created at All > Facilities > Space Management > Floor. A level is any layer that holds spaces. The level form asks for a name, the building it belongs to, a Main level check box and an abbreviation such as G for a garage or 3 for the third floor.

Deleting a building

A building cannot be deleted while floors are attached to it. Open the building and click Delete. A warning box lists the attached floors, so delete those first, then the building.

How occupancy and area roll up

Roll-ups apply to spaces designated as occupiable, which you set with a check box on the facility space record. An occupiable space can also carry a maximum occupancy, and the system computes percent occupied from the current and maximum values. Occupancy, max occupancy and assignable area roll up from lower levels to higher ones, so each level and building reflects the figures beneath it. The roll-up logic lives in a script include, so a developer can change how the figures are calculated.

The area unit property is a separate switch for the whole set: true means square meters, false means square feet.

Map parsing has its own area setting with three options. Preserve Existing Area keeps a space’s area when the current Area value on the Space form is greater than 0.0001. Overwrite Area takes the area from the file on each parse. Ignore Area Files skips area files in the map set.

Assigning people and departments

Each employee has one primary location, enforced by a business rule. Employees who travel between campuses can hold an assigned space on each campus, and those records sit in the m2m_fm_user_to_space table. Adding a user updates the space’s current occupancy and availability, and the space becomes available again when that user is made inactive.

A space can also be associated with more than one department. Use the Associated Departments related list on the space record to view or add which departments are linked to it. For the related workplace reservation setup, see Workplace Reservation Management in ServiceNow: Setup Guide.

Interactive facility maps and the floor plan

The interactive facility maps bring the Workbench and the Floor Plan together with a campus-level view of the hierarchy. The Yokohama release marks this feature as no longer available for new customers, so confirm it is offered on your instance before planning a rollout.

Where available, the maps add these capabilities:

  • A facilities request appears at its exact position on the campus map.
  • Anyone in the organization can search for people, spaces, assets and configuration items (CIs).
  • Zones show which spaces are affected by work such as construction or equipment maintenance.
  • Map filters recolor spaces, and enhanced labels can show an occupant or department name.
Component Who uses it What it does
Facilities Floor Plan Any user, once enabled Finds users, spaces and assets, and creates requests from any space
Facilities Workbench Facilities staff Qualifies requests, organizes tasks, dispatches them and tracks them to closure

Space administrators configure properties on the workbench. In the Yokohama release the Facilities Visualization Workbench plugin is deprecated and no longer available for new activation, although existing Facilities Service Management users can continue to use the application. The workbench is also available on mobile devices, with limited capabilities.

For the wider workplace setup around these records, see the ServiceNow workplace service delivery overview.

Importing campus map files

The floor plan uses GeoJSON, an open standard for describing geographic features. A customer-created map starts with the campus, then adds buildings, floors and other spaces. Each drawing in a campus map file represents a building, or a campus overview for campuses with more than one building. Object properties in the GeoJSON files are used to create buildings, floors and spaces.

Two preserve settings decide what happens to existing records. The preserve-fields setting keeps existing building, level and space names when set to Yes, and takes them from the latest file when set to No. The class setting controls sys_class_name, which updates when both parsing settings are No.

Properties sit at Space Management > Map Configuration > Properties. The workbench title defaults to Workbench, labels longer than 30 characters are shortened with ellipses, and the highlight color for a selected space defaults to #F5F500.

Creating a facilities request from the floor plan

Any user can create a request from the floor plan once the facilities administrator enables that request type on the floor plan view. No specific role is required. Find the space by searching the floor plan or clicking it. On the Spaces tab, under room information and Related Links, click Create Facilities Request. Right-clicking the space link also works.

Location fills from the floor plan. Short Description has a default the requester can overwrite, and Requested by shows the requester’s name. Submitting displays the Floor Plan form.

Administrators then qualify the request by checking its information is complete enough to assign work, organize it into tasks that must finish first, and dispatch those tasks. Staff close their tasks, and the request closes once they are all closed. For how the same request flow sits within workplace services, see ServiceNow Workplace Service Delivery: Connect the Work.

Managing requests in the workbench

Facilities administrators work requests in the Facilities Workbench. The view narrows by campus, building and floor number, and red pins mark each request on the floor plan. Tick Assigned to me to see your own requests. On the Requests tab, enter a request number or a requester’s name and press Enter. Results list the current level first, then other locations in the campus, then other campuses. For the wider Facilities Service Management workflow, see ServiceNow Facilities Service Management: Run the Work Clearly.

What master data must be ready before Workplace Service Delivery floors, spaces and bookings can be trusted?

Settle five sets of master data first: the campus-to-space hierarchy with names that survive a map import, one area unit and a reviewed capacity for each space, each employee’s primary location and booking eligibility, the calendar resource behind each bookable room, and a named owner for each set. Floor plans come last.

Lock the hierarchy and its names before the first import

Pick one naming pattern per layer, and decide which source owns names.

Give every space a capacity someone signs off

Capacity figures can disagree between sources. Record who approved each figure and when.

Settle employee location and booking eligibility before anyone books

Write down who may book each space type: all staff, a department or a license, plus booking windows and exception rules. Settle which location counts as each employee’s primary one before any occupancy report is built, and who may see it.

Map each bookable room to one calendar resource

Calendar sync setup depends on credentials, provider configuration, resource mapping and synchronization configuration. Keep one list of room mailboxes with their space identifiers.

Check floor drawings before they are imported

The indoor mapping setup assumes clean CAD files and installed plugins. CAD remediation can extend elapsed time, so start it early.

Keep occupancy evidence in separate fields

Reservations, check-ins, badge events and sensor counts measure different things. A room can be booked and empty, or occupied and unbooked. Store each source in its own field and report them side by side.

Name an owner and a system of record for each data set

Each table needs one accountable owner, typically the facilities or workplace team for buildings, floors, spaces and capacity. Record which system wins when two sources disagree.

Test the data before trusting any screen

  1. Sample spaces from each building and compare name, floor, area unit and capacity with the source sheet.
  2. Book one room through the calendar and confirm it shows on both the space record and the floor plan.
  3. Change one employee’s primary location and confirm the old location is no longer primary.

Frequently asked questions

Do I need floors before I create a building?

No. Create the building first, because each floor links to its building through the Building field on the floor form.

Why do some spaces show no occupancy figures?

Current occupancy and Percent occupied depend on the Occupiable option. A space that is not marked occupiable shows no occupancy figures and adds nothing to the roll-up. Tick the option on the facility space record for any space where people are counted.

Can an employee be assigned to more than one location?

Yes. An employee can hold several locations, with one marked as primary, and a business rule enforces that.

What happens if square feet and square meters are mixed?

Roll-ups need every area value to use the same unit to work properly, so mixed units make the totals unreliable. Choose one area unit for the whole set, set the area unit property to match, and record each building, level and space in that unit.