OBLYTECH Logo
OBLYTECH Logo

Vulnerability Response Patch Orchestration: SCCM and BigFix

Patch orchestration in Vulnerability Response links scanner findings, vendor patch data and scheduled deployments. Setup means connecting SCCM or BigFix through an integration instance on a standalone MID Server, then confirming that imported patches match your vulnerable items before anyone schedules a deployment.

How the pieces connect

Remediation starts with a scanner. Detections are matched to configuration items (CIs) in the CMDB, and each match becomes a vulnerable item (VI). Vendor patch data arrives on its own import schedule. When a CI behind a VI is also reported as missing a vendor patch for the same vulnerability, that patch is listed as a preferred patch and rolls up to your vulnerability solutions, and the VI’s Remediation tab shows that fix next to the affected asset.

Term What it means here
Configuration item (CI) An asset in the CMDB. SCCM calls these devices and BigFix calls them computers.
Vulnerable item (VI) An imported vulnerability that matches an existing CI.
Preferred patch A software update meant to fix a specific vulnerability on the CI.
Deployment Applying or scheduling a patch on a machine. BigFix calls these actions.

Prerequisites and roles

Install these from the ServiceNow Store and activate them before you open the configuration form: the Vulnerability Response application with its Security Support Common and Security Support Orchestration plugins, Vulnerability Solution Management, the patch orchestration application for your vendor, and a supported scanner integration.

Role What it allows
sn_vul.vulnerability_admin Full access to Vulnerability Response, including rules and third-party integrations.
sn_vul_sccm.configure_integration Configures the SCCM integration. Includes read access.
sn_vul_bigfix.configure_integration Configures the BigFix integration. Includes read access.
sn_vul_patch_orch.read_patch Read-only access to patch information on records.
sn_vul_patch_orch.configure_patch Configures and schedules patches and submits patch requests.

The remediation owner and vulnerability analyst roles inherit the read role, so people who just view patch data do not need the configure role.

Connecting Microsoft SCCM

Two connections on one MID Server

The SCCM integration runs on a standalone Windows MID Server that is not part of a cluster. The JDBC connection reads collections, devices, patches and deployments from the SCCM SQL Server database. The WMI connection calls the SCCM API to deploy patches. From the August 2026 release, JDBC ingestion no longer needs a firewall port opened for WMI remote procedure calls, although the WMI path stays in place for deployments.

Preparing and configuring the connection

  1. Install the SQL Server JDBC driver on the MID Server.
  2. Create a credential holding the SCCM SQL Server username and password.
  3. Create a JDBC connection that references that credential and names the host, database and any non-default port.

Open the SCCM patch orchestration configuration page and complete these fields:

Tab Field What to enter
JDBC Connection JDBC connection The connection from step 3. It drives all ingestion.
JDBC Connection Security updates only Selected to retrieve security-classified updates. Cleared to retrieve all update types.
JDBC Connection JDBC process timeout Minutes before a stalled ingestion is marked failed. The default is 60. Enter 0 to switch it off.
WMI Connection Host, user name, password, MID Server The SCCM server and the account used for deployment.
WMI Connection SG connector connection The Service Graph Connector connection used to match assets to CIs.

Select Save and Test Credentials, then check Validation Status. The Service Graph Connector setting matters more than its place on the form suggests. Without a valid connection, imported assets cannot be linked to existing CIs. Install and run the CMDB integration before either SCCM integration, and set the connector alias on the configuration page if you run more than one SCCM installation.

Connecting HCL BigFix

The BigFix integration is also on-premises and needs a standalone MID Server outside any cluster. On the BigFix configuration page, enter the instance account name, the host URL, a username and password, and the MID Server. Then select Save and Test Credentials and check Validation Status.

Matching uses three CI lookup rules shipped with the base system: MAC_ADDRESS, IP_ADDRESS and DNS_NAME. The IP_ADDRESS rule considers all of an asset’s address values, so a machine that reports several addresses is matched on the full set.

Approval for patch deployments

By default the patch approval property is active, so patch requests from users with the configure role go to the Level 1 – Patch update approval group before they deploy. The routing applies when change management is active and approvers are assigned.

To turn approval off, open sys.properties.list, open sn_vul_patch_orch.patch_approval_required, set Value to false, and select Update. Any user with the configure role can then deploy without review.

To keep approval and assign approvers:

  1. Go to All > Vulnerability Response > Administration > Approval Rules, and open Deploy patch update approval.
  2. On the Approval Configuration tab, open Default Configuration Patch Update approval.
  3. Open Level 1 – Patch update approval, add users, and select Update.

Approvers process requests from My Approvals. For a second level, add a new approval record to the default configuration, set its required approval (one approver, or all users must approve). Lower order numbers run first.

Reading patch data

Patch data surfaces in three places. The IT Remediation Workspace Home view carries scorecards for preferred solutions on VIs, vulnerable CIs and preferred patches on VIs, and its List view holds the Patch Update records (VPUs) and assigned VITs that have patches. The Vulnerability Manager Workspace shows preferred and potential patches against each watch topic.

Each Patch Update record shows a Source Remediation Status, which counts devices that a patch can fix and those still missing it, and a Remediation Status, which shows the percentage of VIs remediated. Related links cover devices, vulnerable items, deployments, patch requests and potential patches. A patch that arrives without solution data leaves the Vulnerability solution field blank, so review those separately after the first import.

A VI with a preferred patch moves to Awaiting Implementation unless it is Closed, Resolved, Deferred or In Review. The reason depends on scheduling:

Situation Reason shown on the VI
Patch scheduled on a CI from a collection import, with a VI Patch Scheduled
Same, but the remediation target date is later than the Time to Remediation date Patch Scheduled (Missing Target Date)
No patch scheduled for that CI Patch Not Scheduled

From the September 2026 release, a scheduled job runs every two hours to apply these changes, rather than at the moment a deployment is created. Allow up to two hours for a new deployment to appear on the VI.

Scheduling a patch

Schedule from a Patch Update (VPU), a remediation task (RT) or a discovered item (SDI). The remediation task route appears when patches are mapped to the task’s VIs. Check the related Patch deployments and Patch requests links first, because another patch may already be scheduled.

BigFix steps

  1. From the IT Remediation Workspace Home view, select Preferred patch on VIs and open a Patch Update record.
  2. Select Schedule Patch and choose Computer Group (the default) or Computer List.
  3. Enter the deployment name, deployment type, deadline (the last time the patch can deploy), available time, time zone and restart setting. Restart is off by default.
  4. Select Deploy. The request goes for review, and you can track it under Exception requests, then My requests.

BigFix creates a separate action for each patch you select. If you select more than one computer group, the BigFix action targets the combined, deduplicated set of devices across all of them.

SCCM steps

  1. Open the Patch Update record or remediation task and select Schedule Patch.
  2. Choose a collection, which is a group imported from SCCM.
  3. Enter the deployment name and choose Required or Available, then set the available time, the deadline (the last day the patch can be installed), the time zone and the restart setting.
  4. Select Deploy. The request goes for review.

Selecting more than one patch creates a Software Update Group in SCCM to bundle them. Each collection you select gets its own deployment record that includes the full group.

Routing through a Change Request

From a remediation task, select Create Change, then Create change & schedule patch. Choose the patches and the assets, then complete the deployment name, start time and end time. Select Automatic patch deployment to deploy when the change reaches the Implement state. Leave it cleared and you deploy manually after approval. This route needs sn_vul_patch_orch.configure_patch and works for both BigFix and SCCM.

Frequently asked questions

Why does a vulnerable item still show Awaiting Implementation after I scheduled a patch?

From the September 2026 release, VI states update through a job that runs every two hours. Allow up to two hours for a new deployment to appear.

Do I need the configure role to see patch data?

No. The read role is inherited through the remediation owner and vulnerability analyst roles. The configure role is needed to schedule patches and submit patch requests.

Why is Schedule Patch missing on a remediation task?

The button appears when patches are mapped to the vulnerable items in that task. An empty Preferred patch column means nothing is mapped to schedule.

Can I skip approval for some deployments?

Not with the approval property. Turning it off applies to all deployments, and leaving it on sends scheduled requests to the Level 1 group.

Where to go next

The Vulnerability Response guides hub groups the wider remediation topics. If your question is about importing SCCM assets into the CMDB rather than deploying patches, the SCCM integration guide covers that side.