OBLYTECH Logo
OBLYTECH Logo

Container Vulnerability Response Exception Rules and Approvals

An exception in Container Vulnerability Response defers remediation of a container vulnerable item or remediation task for a fixed period, after an approver accepts the risk of waiting. You can request one for a single item, or build an exception rule that defers matching items automatically. Approval follows configurable levels, and when the period ends the item returns to Open.

What an exception changes on a vulnerable item

Some container vulnerabilities have no patch, fix or solution yet. The request asks the organization to accept the consequences of leaving the finding open for a stated period. An exception is a request to defer remediation, not a way to ignore the finding. Once approved, the item or remediation task moves to the Deferred state and the deferral date stays visible on the record. For the wider concept behind these records, see Container Vulnerability Response explained.

An approved exception stays editable where it matters day to day: you can reopen it, delete it, or move the Assignment to and Assignment group fields to whoever now holds the fix. For how those groups are set up in the first place, see assignment rules and assignment groups in Vulnerability Response.

Status is tracked on the State Change Approvals tab of the item or remediation task. If an action is taken on a remediation task, the status of the individual items inside it cannot be followed, so track the task itself.

When an exception expires, the affected item or task reverts to Open. If the item passes the next scan, its state becomes Closed with the substate Fixed. A scanner result that clears the finding closes the record without anyone editing it.

Setting up approval levels

Approval rules sit under All > Container Vulnerability Response > Administration > Approval rules. Three ship with the base system.

Approval rule Levels Configuration
Approval for Exception Requests Two: level 1, then level 2 Levels and approvers can be edited
Approval for Exception Rules Two No configuration screen
Approval for False Positives One One configuration

Requests raised through a workflow send their approvals to the groups named in system properties. These are sn_vul_container.container_exception_approver_L1, sn_vul_container.container_exception_approver_L2 and sn_vul_container.container_false_positive_approver_group. Open them under All > System Properties and change the value to point at a different group.

Approval runs at two levels. If only a first-level approver exists, the exception can still be requested and approved. Up to Vulnerability Response v14.0, without any first-level approver an exception cannot be requested, so check this before rollout. For how the people behind these approvals are organized, see roles, responsibilities and RACI for Vulnerability Response.

From Container Vulnerability Response v2.5, you can also set time frames for approving exceptions and false positives, with emails to the approver and the requester after a set number of days. While the request waits, the item sits In-Review. If the approver does not respond within the window, the item reverts to Open, and its previous state is kept in the backup_state field.

From Vulnerability Response v15.0, a first deployment has the flow designer for exception management enabled by default. Teams already on the workflow can move to the flow designer, but the change cannot be reversed back to the workflow, so treat it as a one-way step.

Choosing how exceptions are managed

Go to All > Container Vulnerability Response > Administration > Exception Management. The Manage exceptions using list offers two routes: Vulnerability Response, or GRC: Policy and Compliance Management. Choose the first to keep the whole flow inside Container Vulnerability Response. Choose the second when governance already runs policy exceptions in GRC: Duration and Unit then disappear, because GRC handles timing, and requesters pick the Policy and Control objective instead.

On the Vulnerability Response route, four settings shape each request:

  • Duration and Unit set the longest period an exception can be requested for.
  • Enable questionnaire to request exception attaches a questionnaire to exception requests.
  • Enable questionnaire to mark false positive attaches a questionnaire to false positive requests.
  • Questionnaire to request exception defaults to Exception Questionnaire, and you can select one of your own instead.

The questionnaire goes to the person raising the request, and it helps the approver understand the reason for the request. Changing this configuration needs the sn_vul_container.manage_exception_configuration role. For the governance decisions behind choices like this, see the Vulnerability Response governance model.

Requesting an exception for one item

A remediation owner raises the request from the item itself. Open Container Vulnerability Response > Container Vulnerable Items > All and select an item in Open or Under Investigation state. Then follow these steps. If the record type itself is new to you, start with the vulnerable item concept.

  1. Click Request Exception.
  2. Set Until. The date must sit within the duration allowed in Exception Management. When it passes, the group reverts to Open.
  3. Choose a reason: Risk Accepted, Awaiting Maintenance Window, Fix Unavailable, Mitigating Control in Place or Other. More reasons can be added through a policy reason mapping.
  4. Describe the situation in Additional information. The remediation owner maintains this field.
  5. Click Request Approval.

The item moves to In Review, and both requester and approver receive an email. For many items at once, the Bulk Edit feature in the Vulnerability Manager Workspace can request exceptions in a single pass.

Deferring a low-risk item without a full cycle

For low-risk items that can be deferred straight away, the Defer feature is a shorter route. The role needed is sn_vul.vulnerability_admin, or the deprecated sn_vul.admin. Open the item, click Request Exception, and complete Until, Reason and Additional information. The reasons here include False positive alongside Awaiting maintenance window, Fix unavailable, Risk accepted, Mitigating control in place and Other.

After submission the group is marked In Review, a Reopen related link appears, and the reopen date and reason are written into work notes under the State Change Approvals tab. From Container Vulnerability Response v2.3, you can also add work notes to a deferred item from the Notes section.

A daily job reopens a deferred item on the day its deferral expires. Group members get an email when expiry is within one week, and a second when the item returns to Open.

A scanner can also reopen a deferred item. From Container Vulnerability Response v18.0, when the system property sn_vul_container.auto_defer_cvit_in_active_exception_window is true, an item that a scanner closes and reopens inside the exception window returns to Deferred, and its Until date persists. Reading and writing this setting needs sn_vul_container.manage_exception_configuration.

Building an exception rule for a group of items

An exception rule covers many items at once. It describes a condition, such as a vulnerability severity, and it defers new and existing container vulnerable items that match. Go to Container Vulnerability Response > Administration > Exception Rules, click New, complete the form, add the assignment group, and submit. The role required is sn_vul.vulnerability_admin. For the application side of rules and exceptions, see remediation rules and exceptions in Application Vulnerability Response.

Until you submit, the rule stays in Draft. After submission it shows In review, and you can follow the decision on the Requested Approvals tab. Email notifications go out at each stage.

After approval:

  • The rule applies from its Valid from date until its Valid to date.
  • On approval, a remediation task is created in the Deferred state, grouped under the exception rules method. That task cannot be closed, reopened or deleted directly.
  • A daily scheduled job runs the rule against existing data, moving matching items to Deferred.
  • With Execute on existing data enabled on the first run, active, non-deferred matching items move into the new task.
  • The task stops accepting new items at its Valid to date and remains until its Deferred until date.

Level 1 and level 2 approvers decide from My Approvals, using the sn_vul.exception_approver role, and state why.

Changing, reopening and deleting a rule

Three actions handle a rule after it has been raised. Each one affects the rule and the items under it in a different way.

Action What happens
Reopen a rejected rule The rule returns to Draft, so you can update it and resubmit for approval
Cancel an approved rule The rule returns to Draft, its remediation task is deleted, and the related items reopen while group rules are reapplied to them
Delete a rule The associated remediation task is canceled and deleted, and the related items reopen with group rules applied individually

Cancel an approved rule before changing a date or adding a condition, then submit it again for approval. Delete a rule when it is no longer needed, for example when you no longer want items deferred during ingestion. Reopen suits a rejected rule that needs another attempt. All three actions require sn_vul.vulnerability_admin.

Requesting an extension for a deferred item or rule

The remediation owner does not have to wait for the deferred until date before asking for more time; the request can go in beforehand.

For an item, open the deferred record under Container Vulnerable Items and click Request Extension. The button appears while the state is Deferred. For a rule, go to Exception Rules, select the deferred rule, and click Request Extension. The button is unavailable for remediation tasks created by an exception rule, so the extension is requested on the rule itself.

Complete the fields:

  • Extend Until, the date the deferral should run to.
  • Reason: Awaiting maintenance window, Fix unavailable, Risk accepted, Mitigating control in place or Other.
  • Additional information, for any detail the approver needs.

Click Request Approval. The request passes through two approval levels. Once approved, the Until, Reason and Deferral notes fields update on the record. Each repeat extension raises the extend deferral count.

Frequently asked questions

Does an approved exception close the vulnerability? No. It defers remediation for the period you set. When that period ends, the item returns to Open, and it closes as Fixed when a later scan no longer finds it.

What happens if nobody responds in time? With time frames configured, the item reverts to Open, and its previous state is kept in the backup_state field.

Can one exception cover many items? Yes. An exception rule defers all matching items by condition.

Why is the Request Extension button missing? The button appears while an item is Deferred. It is also unavailable for remediation tasks that an exception rule created, so the extension has to be requested on the rule.