OBLYTECH Logo
OBLYTECH Logo

Application Vulnerability Response Remediation Task Rules

Application Vulnerability Response (AVR) groups application vulnerable items (AVIs) into remediation tasks using rules you define. Each rule filters items, groups them by chosen fields, and gives the resulting task an assignment group. Exceptions defer items that cannot be fixed yet, either by individual request or automatically through an exception rule.

How rules group items into tasks

Remediation tasks, recorded as AVULs, let analysts work related AVIs as one unit and track progress on a single record. The rule decides which items belong together. The base system includes a default rule named Vulnerability, which groups items by vulnerability. Other rules can group on any value reachable from the item, such as the configuration item (CI), the vulnerability entry or the product model.

A rule holds up to six Group by selections, and each one opens another row. Adding grouping values typically produces more, smaller tasks. Each item is compared with each rule’s conditions, so overlapping rules can create duplicate tasks.

Rules run when an AVI is created, imported or reopened after closing. Each item is evaluated automatically once, unless a field the conditions depend on changes, it is reopened, or someone reapplies the rules by hand. The engine looks for an Open task with the item’s assignment group. If one exists, the item joins it. If not, a new task is created for that group and the item is placed inside.

A task’s short description combines the group-by values with the task name. That field holds 160 characters, so a long vulnerability summary is cut short. Changing a field that the conditions depend on, such as the CI or the vulnerability, sends the item back through the rules.

Writing a task rule that groups the right items

Task rules sit under Administration in the Application Vulnerability Response application. Creating or editing them needs the App-Sec Manager role, sn_vul.app_sec_manager. Each rule has a name, an active flag, a description and a case sensitivity setting. Case sensitivity is off by default, so condition text matches regardless of capitals.

A common condition sets Vulnerability to a known entry imported through the NVD and CWE integrations. A second condition can narrow the match, for example on the CI with its IP address or product model. The Group by tree offers the item table, the item’s CI, its application vulnerability entry and its product model. One rule can split a shared finding. Match a known vulnerability, then add Assignment group and IP address as Using fields in the Group by section. Items that share the vulnerability but sit on different hosts or groups then land in separate tasks, each assigned to the group on the item.

A new rule does not normally touch existing records. It runs against new imports after you submit it. Reapply reruns a changed rule on the Open tasks it created, deleting and recreating them, while tasks in other states stay as they are. Deleting a rule offers a checkbox to delete its Open tasks too. Left unticked, the tasks remain.

Assigning tasks and items

A task takes the assignment group that Assignment Rules set on the item. Item-level rules therefore decide ownership, and task rules decide how the work is bundled.

Assignment rules run from the lowest order number upward, and the first match ends the search. A default rule catches anything left over. Without one, the item stays unassigned. Each rule assigns by a static user group, by a group field from the CI record (Approval Group, Assignment Group or Support Group), or by script, which needs coding skill. Put high-priority rules, such as those for regulatory or critical items, first, general rules next, and the default last.

Each item records whether its assignment was Manual or Rule, along with the rule that made it. That reference survives a manual reassignment, which helps you find rules that get overridden. Rules do not re-evaluate manual assignments. Apply Changes reruns changed rules on Open items and skips manual ones. A scheduled job that reapplies rules is inactive by default, so set its run frequency with your item volume in mind.

Remediation owners can select Unassign on an AVIT or AVUL in any state other than Closed or Resolved. Clearing requires approval by default, and an approved request also clears items on the same task that share its assignment group. Administrators can switch approval off through sn_vul.unassign_vr.approval_required, and sn_vul.default_assignment_group routes cleared records to a chosen group.

To build a task by hand, open Remediation Tasks, choose New, and set Grouping method to Manual on the Group Configuration tab. The task opens in the Open state, and you add items from the related list. Creating one needs the App-Sec Manager role.

Four default user groups exist: App-Sec Manager, Security Champion, Developer and Ethical Hacker, the last added in version 15.0. Admins place people in these groups from the Group Members tab, because the Setup Assistant assigns Vulnerability Response roles without touching these groups.

Keeping tasks, items and changes in step

Moving a task to Open, or from Open to Under Investigation, rolls down to its items straight away. A task rolls up to Deferred or Closed-fixed once its items reach that state together, and a scheduled job runs the roll-up on a 15-minute cycle.

A daily job posts a deferral count for records deferred more than once. Those records appear in the Multiple deferrals modules for VR, AVR and CVR, which is the place to check when a fix keeps slipping.

A deferred task can have its date extended before the deferred until date arrives. Use Request Extension, pick an Extend Until date, and select a reason: Awaiting maintenance window, Fix unavailable, Risk accepted, Mitigating control in place, or Other. Two approval levels follow. Repeat extensions raise the extend deferral count, and the button is unavailable on tasks an exception rule created.

Change requests offer a second route to a fix. From a task, choose Create Change and pick a Standard, Normal or Emergency type. The form pre-fills the planned end date from the earliest remediation target date, a justification with the CI count, and the implementation plan. With Add CIs to CR selected, which is the default, the task moves to Awaiting Implementation. Change requests are supported when the application links to a CI, which requires sn_vul.use_product_model to be false.

Requesting an exception

An exception defers remediation of an item for a fixed period, typically when a patch is unavailable. Item requests start in the Vulnerability Manager Workspace and task requests in the IT Remediation Workspace. The item then moves to In-Review, and a state change record is created.

Approval runs in two levels. The default configuration requires both levels. Adding users to the Application Exception Approver – Level 1 and Level 2 groups sets who can approve; the add-approver procedure lists sn_vul.app_exception_approver as the role required to do it. Workflow routing uses sn_vul.app_exception_approver_L1 and sn_vul.app_exception_approver_L2, and sn_vul.app_false_positive_approver_group covers false positives.

From version 21.0, an administrator can set approval windows and reminder emails. If no response arrives in time, the item or task returns to Open, and its previous state is kept in backup_state. An approved item sits in Deferred until the exception expires, then returns to Open. From version 20.0, Awaiting Implementation can be set manually from Under Investigation.

Exception rules and their extensions

From version 20.0, an exception rule defers new and existing matching items for a set period, which reduces manual work on large batches. Security Champions and App-Sec Managers manage these rules under Administration, Exception Rules.

Valid from starts the deferral, and Valid to is the date the task stops accepting new items. Deferred until closes the task, reopens the items and reapplies task rules. Execution order sets precedence, lowest first. Assignment group tracks the deferred items, and Additional information is copied into the task description. Execute on existing data governs old records: left off, a daily job handles new data, and switched on, a one-time run takes place on the Valid from date.

Submitting moves the rule to In review, which needs two approval levels. Approval creates a task using the Exception Rules grouping method, and that task cannot be closed, reopened or deleted by hand. A rejected rule can return to Draft and be resubmitted. Deleting a rule removes its task and reopens its items. Cancel does the same but keeps the rule in Draft.

An approved rule can be extended. Choose an Extend Until date, plus a reason. The request passes two approval levels, then updates the deferred until date, reason and additional information on the rule, its tasks and its items.

Frequently asked questions

Will a new task rule change the tasks I already have? Not on its own. A new rule runs against new imports after you submit it. To apply a changed rule to existing Open tasks, use Reapply, which deletes and recreates those tasks from the new definition.

Why has my remediation task not updated after its items changed? A task rolls up when its items reach the same state, either Deferred or Closed-fixed. The roll-up job runs on a 15-minute cycle, so the change can take a short time to appear.

Who approves an exception request? Members of the Application Exception Approver groups. The default configuration requires two levels of approval.

What happens if nobody responds to an exception request? From version 21.0, an approval window can be configured. If no one responds in time, the item or task reverts to Open, and its earlier state is kept in backup_state.

Should I cancel or delete an exception rule? Cancel deactivates the rule and returns it to Draft, so you can update and resubmit it later. Delete removes the rule, and its task is removed with it.

Related setup and grouping pages

Initial configuration, including the NVD and CWE imports that feed these rules, is covered on the Application Vulnerability Response setup page. For grouping across the wider vulnerability module, see the triage grouping rules guide.