OBLYTECH Logo
OBLYTECH Logo

ServiceNow Remediation Efforts in Security Exposure Management

A remediation effort is a static list of vulnerable records that you build from a watch topic in the Security Exposure Management Workspace. You open the watch topic, choose Create Remediation Effort, and work through three steps: effort details, task generation and transfer. Recurring efforts follow a schedule you set instead of running once.

What a remediation effort does for your queue

A remediation effort hands work to the IT teams that fix vulnerabilities and misconfigurations. A watch topic tracks one high-priority category of findings, so an effort inherits the scope of the watch topic it came from. For the records themselves, see the vulnerable item explainer. For the wider security operations context, see the security operations hub.

Column What it tells you
Risk rating Quantified risk score, grouped into Critical, High, Medium, Low and None
Remediation status Progress of the fix for that record
Assignment group The group responsible for remediation, set by your assignment rules
Remediation effort The effort the record currently belongs to
In remediation task Whether the record already sits in a remediation task

Progress is reported on the Remediation Progress tab, which shows the percentage remediated, the deferred and non-deferred counts. While a new effort populates, a message shows that it is still filling. Effort widgets refresh on a 10-minute job and Remediation Tasks values roll up on a 15-minute job, so wait for the populating message to clear and expect the figures to lag by up to those intervals.

Who can create an effort

Record type Role required
Host vulnerable items (VITs) sn_vul.vulnerability_analyst or sn_vul.vulnerability_admin
Application vulnerable items (AVITs) sn_vul.app_sec_manager
Container vulnerable items (CVITs) sn_vul_container.vulnerability_analyst or sn_vul_container.vulnerability_admin
Configuration test results (CTRs) sn_vulc.admin

The remediation owner persona reads and writes the records assigned to that person or to the person’s groups. For how these roles fit the wider team, see the roles, responsibilities and RACI guide.

Building the effort step by step

Open the watch topic and select Create Remediation Effort. The button stays greyed out when the watch topic is inactive, or when no records are available from the topic and none are selected for transfer.

Step one: effort details

Enter a short description you will recognise in the effort list, and a longer description that explains the context, such as why the team is tackling this exposure now.

Step two: task generation

Option Result
By Assignment group Records with the same assignment group share one task
By Assignment group and configuration item Records with the same group and configuration item share one task
By Assignment group and vulnerability or configuration test Records with the same group and vulnerability, or test, share one task
None No tasks are created, and you add records to tasks by hand later

Assignment group gives the fewest tasks. Configuration item produces smaller tasks, one per assignment group and configuration item pairing. Teams that patch one machine at a time typically find that split easier to work through. For more on grouping in triage, see the triage grouping rules guide. Host vulnerabilities also offer the check box Automatically refresh duplicate vulnerable items for the created remediation tasks, which keeps duplicate host entries current.

Step three: transfer

The transfer step shows how many records will join the effort from the watch topic, and how many active records in other efforts could move in. Tick Transfer matching records from other active remediation efforts, then select the records to move. Records in other efforts stay there unless you transfer them. A record that joins one effort is not added to another effort from the same watch topic. If a transfer empties an existing effort, that effort closes.

How existing tasks are handled when you group

A record can sit in several remediation tasks at once, so the task-creation screen asks what to do with records that already belong to a task. The remediation task explainer covers what a task holds in more depth.

Choice Effect on a record already in another task
Skip records for the new remediation tasks The record stays where it is and is left out of the new task
Transfer records to the new remediation tasks The record leaves its old task and joins the new one
Keep records in both the current and new remediation tasks The record stays in its old task and is also added to the new one

Choosing the skip option leaves a record that already sits in another task where it is and leaves it out of the new tasks. Choosing the transfer option moves such a record out of its old task and into the new one.

Recurring remediation efforts

A watch topic can have one recurring effort. From the Create Remediation Effort list at the top right of the watch topic, choose Create Recurring Effort. Its third step sets the recurrence.

Frequency Behaviour
Quarterly (every 3 months) Creates one effort per three-month cycle
Monthly Creates one effort per month
Weekly Creates one effort per week, from Vulnerability Response version 19.0
Daily Creates one effort per day, from Vulnerability Response version 19.0

If a scheduled date falls in a month that lacks it, the effort is created on the last day of that month. The time zone defaults to yours. Carry over vulnerabilities to active vulnerabilities in this remediation effort carries active vulnerabilities forward into each subsequent effort. Teams typically use it for a vulnerability that should stay in view until it is closed.

Recurring efforts differ in three ways. The new effort does not display when you schedule it, because the job creates it later, and the next date appears on the watch topic. Records cannot be transferred from a recurring effort into a new one. If you deactivate the watch topic, no new effort is created until you reactivate it.

Editing and working the tasks

Choose Edit from an effort’s menu to change its fields and conditions. For a recurring effort, use Edit recurring effort from the watch topic’s upper-right menu. On the Remediation Tasks tab, open a task, select the More Actions ellipsis, and choose Start Investigation.

Bulk actions for false positives and exceptions

The List page supports two bulk actions through the Bulk edit button. A false positive request needs records in the Open, Under Investigation or Awaiting Implementation state. Set State to Closed, set Reason to False Positive, and select Update. A remediation task is created with the selected records and moves to In Review while the approver decides. An approval closes the task and its records with the reason False positive. A rejection leaves them unchanged.

An exception request uses the Deferred state with a reason. A remediation task is created when Deferred or Closed-false positive is selected. On approval, the task moves to Deferred, and the change rolls down to the records. If the request also changes the risk rating, a separate change approval is raised, and approval applies the new rating.

Scanner settings can block these actions. Application vulnerable items from a scanner whose Manage exceptions in ServiceNow parameter is false are not updated by an exception request, and those from a scanner whose Manage False positive with ServiceNow parameter is false are not updated by a false positive request, and when the selection comes entirely from scanners whose Manage False positive with ServiceNow parameter is false, the False positive option does not appear in the Reason field. Check the scanner configuration first when a bulk action seems to skip records.

Approvals and who signs off

Approval type Levels Approver role or group
False positive One sn_vul.false_positive_approver for VITs, sn_vul.app_false_positive_approver for AVITs, sn_vul_container.false_positive_approver for CVITs, sn_vulc.false_positive_approver for CTRs, or the False Positive Approver group
Exception (deferral) Two Approver – Level 1 group, then Approver – Level 2 group
Risk reduction Two Same flow as exception approvals
Unassign One Approver – Level 1 group, with sn_vul.unassign_approver for AVITs and VITs

Approvers open My Approvals under the Vulnerability Response menu, select a request from their queue, and approve or reject it with comments. The corresponding state change approval record carries a VCA number. A rejection leaves the task or record in its current state. An approved exception or risk reduction request moves it to Deferred, and an approved false positive request closes it with the reason False positive.

Frequently asked questions

Can one record belong to more than one remediation effort?

A record joins one remediation effort and is not added to another effort you create from the same watch topic. It can, however, sit in several remediation tasks at the same time.

Why is the Create Remediation Effort button greyed out?

Usually the watch topic is inactive, no active records are available, or no records are selected for transfer. Reactivate the topic or select records to transfer.

What happens to an older effort when I transfer its records?

If you transfer every record out of an older effort, that effort closes. If you transfer only some of them, it stays open with the records you left in it, and the new effort receives the ones you moved.

Can I move records out of a recurring effort?

No. Records can be transferred from standard efforts into a new one, but not from a recurring effort.