The Vulnerability Manager Workspace gives vulnerability managers and analysts one place to watch host, application, container and configuration findings. The Home page summarizes active records, the List page holds the working queues, watch topics filter records to the subsets you care about, and remediation efforts hand those subsets to IT teams as remediation tasks.
What the workspace covers
The workspace shows host, application and container vulnerabilities alongside configuration test results. You can build watch topics across all four and send the resulting work to the right teams. Open it from the Workspaces menu by choosing Vulnerability Manager Workspace. It has four pages: Home, Watch Topics, Dashboards and List.
Terminology changed at version 19.0 of Vulnerability Response:
| Earlier term | Current term |
|---|---|
| Test Result Groups | Remediation Tasks |
| Configuration Issues | Configuration Test Results |
| Policy | Test group |
From version 30.0 of Vulnerability Response, the Security Exposure Management Workspace replaces this workspace. Check which workspace your instance runs before following the steps below. The Vulnerability Response overview lists the related guides.
Reading the Home page
The Home page summarizes active records through visualizations for risk rating, remediation progress, assignment groups, remediation task membership and cloud resources. It has four tabs: Host Vulnerabilities, Container Vulnerabilities, Application Vulnerabilities and Configuration Test Results. Each tab opens with predefined filters, and you can add your own.
Select any bar, slice or donut segment to open the records behind it.
| Visualization | What it shows | Tabs |
|---|---|---|
| By assignment group and remediation status | Active records per group, split by remediation status | All four |
| By state | Active records across Open, Under Investigation, Awaiting Implementation, In Review, Resolved and Deferred | All four |
| By risk rating | Active records from 1 Critical to 5 None | All four |
| In remediation task | Records that are and are not part of a remediation task | Host, container, application |
| With existing exploits | Records with and without known exploits | Host, container, application |
| By external facing | Records by how exposed the asset is to the internet | All four |
| By CI class | Records by configuration item class | Host, application, configuration |
| By cloud resource | Records by cloud resource | Host, application, configuration |
| Deferred Items by reason | Deferred records grouped by reason | All four |
The Refresh Selected Saved Filter icon recalculates the visualizations for your applied filter. The Refresh option in a widget’s three-dots menu updates that widget alone. An administrator can also set the sn_vul_cmn_ws.navigate_to_workspace system property to true, so predefined links such as High Risk in the Vulnerable Items module open the Home page with the matching saved filter already selected.
Access depends on role. Host visualizations need sn_vul.vulnerability_analyst or sn_vul.vulnerability_admin, with sn_vul.read_all for view-only access through filters.
Working with lists on the List page
The Lists tab holds default lists for remediation efforts, remediation tasks, vulnerable items, configuration test results, solutions, exceptions, approvals and libraries. The My Lists tab holds lists you rename and lists you create.
| List group | Lists it includes |
|---|---|
| Remediation efforts | Active efforts, and efforts assigned to your groups |
| Remediation tasks | Active, All, Assigned to me, Assigned to my group |
| Vulnerable items | Host, application and container lists, each with the four standard views |
| Configuration test results | Active, All, Assigned to me, Assigned to my group |
| Solutions | All, Highest Supersedence, With Vulnerable items |
| Exceptions | Approval states for exception, false positive and unassign requests |
| Approvals | Assigned to me |
| Libraries | CVEs (NVD), TPEs, CWEs, App vulnerabilities, Test Groups, Tests, Compensating Controls |
| CMDB | Discovered items, Discovered container images, Discovered applications |
| Penetration testing | Assessment requests and findings |
| Patches | All |
| Supporting data | Authoritative Sources and Technologies |
Role requirements follow the record type. Host vulnerable items need sn_vul.vulnerability_analyst or sn_vul.vulnerability_admin. Application items need sn_vul.app_sec_manager. Container items need sn_vul_container.vulnerability_analyst or sn_vul_container.vulnerability_admin. Configuration test results need sn_vulc.admin. The vulnerable item explainer describes what each record represents.
Watch topics: the filter layer
A watch topic uses conditions you set to pull a subset of imported vulnerabilities or misconfigurations. It shows how that subset affects your environment, which helps you decide what deserves a remediation effort. The Watch Topics page groups topics into four modules: host, application, container and configuration test results. Selecting a topic opens its Overview tab, and the Related Items tabs show the underlying records.
| Action | What it does |
|---|---|
| Create a watch topic | Defines the conditions for the subset you want to track |
| Edit or delete | Changes or removes a topic |
| Activate or deactivate | Turns monitoring on or off. Inactive topics cannot be refreshed |
| Refresh | Updates charts and remediation efforts, with the latest timestamp. Runs automatically on create or update |
| Create a remediation effort | Starts remediation tasks from the records in the topic |
| Create a recurring effort | Schedules efforts on a cadence. Not available for inactive topics |
Topic dashboards update when new vulnerability data is imported. Column filters come from the three-dots menu on a column title. From a row in the Summary column of the Vulnerable Items related list, Show Matching lists other records with the same vulnerability, and Filter Out hides them.
Remediation efforts: a fixed set of records
A remediation effort is a set of records tied to a watch topic. Its records are fixed at creation, so new imports and later watch topic edits do not change it. Creating an effort pulls in the active vulnerable items that are not already part of an effort for that topic. Tasks are assigned to IT teams according to each record’s assignment group.
Recurring efforts suit work that needs ongoing attention. You can also create remediation tasks on demand and transfer records into an effort. The Overview tab shows closed records over time. The Details tab shows the watch topic and the Active or Inactive status. The Remediation Tasks tab shows the percentage remediated for each task.
An effort becomes Inactive when all records in its remediation tasks are closed. If you deactivate it earlier, its active records become available for new efforts. Closed records from an inactive effort do not return to the pool. The remediation task explainer covers how individual tasks move through their states.
Bulk editing records
Bulk edit changes many vulnerable items or test results at once. You can assign remediation owners, update status, add work notes, request exceptions or request a false positive. The feature arrived in stages: host vulnerable items from version 21.0 of Vulnerability Response, application and container items from 22.0, and test results from 23.0. Bulk tasks include assigning records to a group, requesting a bulk exception, removing host assignments, marking a bulk false positive and closing records in bulk.
Default dashboards by role
The default dashboard on the Dashboards page depends on your role.
| Role | Default dashboard |
|---|---|
| sn_vul_cmn_vulnerability_admin or sn_vul_cmn_vulnerability_analyst | Unified Dashboard |
| sn_vul_vulnerability_admin or sn_vul_vulnerability_analyst | Vulnerability PA Dashboard |
| sn_vul_app_sec_manager | Application overview |
| sn_vul_container_vulnerability_admin or sn_vul_container_analyst | Container overview |
The other dashboards cover specific questions. Vulnerability Management (PA) tracks host vulnerabilities from detection to remediation. Vulnerability Approvals counts approved, rejected and pending requests. CISO Dashboard shows overall posture, including vulnerabilities and incidents. Unified Vulnerability Response Dashboard combines results from several scanners and tools. To build your own view, select More Options and choose Create new dashboard.
Opening records from search
Search results open in the workspace once you set the application scope. Select the Globe icon in the unified navigation bar, choose Application Scope, and pick Vulnerability Manager Workspace. While the scope is not Global, the Globe icon shows a red ring. A search for a host vulnerable item by number opens its record view in the workspace. Remediation tasks and state change approvals found through search also open in the workspace.
Email digests for remediation owners
An administrator can enable an automatic email digest for remediation owners through the Generate remediation digest scheduled job under All > Scheduled Jobs. By default it sends weekly on Monday, at a time you set on the form, in the time zone of the instance running the job. Recipients need an active email address on their user record and the sn_vul.remediation_owner role. If the digest does not arrive, check that notification channels are active.
Frequently asked questions
Which roles do I need to see the Home page visualizations?
Host visualizations need sn_vul.vulnerability_analyst or sn_vul.vulnerability_admin to view and filter them. The sn_vul.read_all granular role allows viewing through filters.
Why does a remediation effort stay the same after I edit its watch topic?
Records are fixed when the effort is created. To pick up records that have appeared since, create a new effort. It pulls in the active vulnerable items that are not already part of an effort for that topic.
What happens to closed records when I deactivate an effort?
Active records return to the pool for new efforts. Closed records stay out of the pool once the effort is inactive.
Does this workspace still exist in newer releases?
Not from version 30.0 of Vulnerability Response onward. From that version the Security Exposure Management Workspace replaces it. Confirm which workspace your instance runs before following these steps.
Why are my digest emails not arriving?
Confirm the user has an active email address and belongs to the Remediation Owner group. Then confirm the Generate remediation digest job is active. If all three are in order, check that notification channels are activated.