Operational Technology Vulnerability Response turns vulnerabilities found on OT devices into vulnerable items and remediation tasks, scored against the production process each device supports. Setup follows a clear sequence: install the plugins and application, assign roles and site scope, configure the risk calculators and rollup, then add dashboards and exception handling.
What the application does with OT vulnerabilities
Severity alone answers a narrower question than OT teams face. The harder one is what happens to the process if a device has to come down to be patched. The application reads the relationships held in the configuration management database, so each OT device is tied to the equipment it serves and a vulnerable device can be ranked by how critical its production process is.
A finding moves through a few stages. The vulnerability is matched to a device, a vulnerable item is created with that device as its configuration item, and assignment rules send the item to the team that owns the site. A remediation task then groups related items using the filter grouping configured on the task, so review that grouping before the first real run.
Install the plugins and application first
The installer needs the admin role, and the application and its Store dependencies need valid ServiceNow entitlements. Three plugins must be active first. Vulnerability Response (sn_vul) imports and groups vulnerable items. Industrial Process Manager (sn_otsm) builds the ISA-95 Equipment Model. Operational Technology Manager supplies the foundational data and relationships that the Industrial solution uses with the configuration management database, Service Graph Connectors and Discovery.
Device records should be in place before scoring means much. The guides to OT visibility in the CMDB and OT discovery connections and credentials cover keeping those records current.
Install from the system applications area by choosing a version and selecting Install. The review dialog lists dependencies that will also install. The demo data checkbox suits a development or test instance on first install; leave it clear on a production instance that will hold real data.
Assign roles and scope sites
Three roles control the core work. The integration viewer role (sn_otvr.integration_viewer) reads integration records, and the integration admin role (sn_otvr.integration_admin) also edits them. The remediation owner role (sn_otvr.remediation_owner) creates remediation tasks and schedules existing ones.
| Role | What it allows |
|---|---|
| sn_otvr.integration_viewer | View integration records |
| sn_otvr.integration_admin | View and edit integration records |
| sn_otvr.remediation_owner | Create remediation tasks; schedule existing ones |
| configure_industrial_workspace | Open the Industrial Workspace and its guided setup pages |
| cmdb_ot_isa_admin | Edit site assignment groups in bulk |
Inheritance matters. The remediation owner role also carries cmdb_ot_isa_viewer, cmdb_ot_viewer, sn_vul.close_vi_vg and sn_vul.remediation_owner. The cmdb_ot_isa_viewer_all role grants visibility to all sites and overrides site scoping. It also gives write access to OT devices by default. The cmdb_ot_isa_admin role inherits it, so check who holds that admin role before granting it.
Site scope is set through the OT VR assignment group on each site record. To apply a group to several sites, open the Sites list under the Industrial Process Manager module, tick the sites, select Edit, set the OT VR assignment group field and update. Doing this before creating remediation tasks keeps routing predictable from the first import.
Set the risk calculators
Risk scoring has two layers. A vulnerability calculator scores each vulnerable item, and a rollup calculator adds those scores up through the equipment model. Only one vulnerability calculator can be active at a time, so the rules for non-OT items are copied into the Default Risk Calculator with OT and set to run after the OT Default Risk Rule.
The Default Risk Calculator with OT handles OT items. Its OT Default Risk Rule weights three OT-specific inputs: equipment model entity criticality, OT device criticality (from the device criticality rule on the configuration item) and the Purdue level. Adjust the weight or weightage percentage for each criterion to reflect how strongly it should move the final number, then save.
Non-OT items still need a rule. The demo data includes a non-OT Default Risk Rule as an example. To score other items, copy the existing rules into the OT calculator and set their order to run after the OT Default Risk Rule, since the order decides which rule governs an item.
The risk score field on a vulnerable item updates when the severity or risk score calculator is enabled. Its base rating is separate from the rating on a solution record, so keep reports on one or the other.
Roll risk up to equipment model entities
The rollup calculator carries device scores up each level of the equipment model and into the parent entity. Three criteria feed it: the maximum risk score among the entity’s vulnerable items, their average risk score, and the number of vulnerable items. Set a weight for each in the roll-up weightage section of the Equipment Model Entity Rollup calculator. The role needed is admin, or sn_vul.manage_risk_score_configuration.
Before the first run, check that the Service Populator column on the Equipment Model Entities list reads OTDynamicManualServicePopulator. If it does not, run the Update ISA entity service populator job on demand with Execute Now.
The daily rollup job runs once a day by default, and its Run, Time zone and Time fields can be changed. Judge the entity numbers after the first scheduled run, not on the first manual pass.
One setting needs a check before you trust the output. The OT Devices with No sites Assigned Rollup record has a Table field, which must read OT Metric [sn_ot_metric]. If it points elsewhere, the scores and ratings that reach remediation tasks can be wrong. The Operational Technology Vulnerability Risk Rollup dashboard shows two tables: one for equipment model entities, highlighting the area with the greatest risk, and one for OT devices with no site assigned. The second table lists OT devices with no site assigned. Give each device a site, and give that site a business unit, before reading the table as real exposure.
Read the vulnerable item record
The state defaults to Open and can move to Under Investigation when an item is ready for remediation. The risk rating sorts items into Critical, High, Medium, Low and None. Exploit exists reads Yes when at least one exploit is linked to the item, and the exploit skill level shows the lowest skill needed to use them. Check Exploit exists and Exploit skill level on each item, since the form shows them directly, when deciding what to remediate first. Threat text is pulled from the vulnerable entry record, so edits there change that shared record.
Solutions and compensating controls
Solution management imports CSAF advisories, which use a machine-readable JSON format for automated security notifications. A trusted provider import maps solutions to the right vendor and items by CVE, so one import can serve several vendors.
Patching sometimes has to wait. Compensating controls reduce the likelihood or impact of an exploit until a permanent fix is possible. For a programmable logic controller open to unauthorised access, that means access control lists, disabled unused ports and services, and stronger authentication. For a buffer overflow in a human machine interface panel, it means vendor firmware, hardware watchdog timers and boundary checks. Record each control under the Compensating Controls list in the Libraries module, using sn_vul.vulnerability_admin or sn_vul.vulnerability_analyst.
Handle exceptions and deferrals
Some items cannot be fixed on the normal schedule. An exception request asks an OT admin to ignore a vulnerable item. The OT Vulnerability Exception Approvals menu shows the approvals assigned to you, the ones you have completed and each change of state. That history is the audit trail, so record the approver’s reasoning there rather than in email.
Remediation tasks have their own views, including Assigned to me and My Exception Requests. Split a task when it covers items with different owners or deadlines. The Exception tab lists deferred items by reason. If the count for one assignment group rises, read it as a sign that group needs its deferrals reviewed.
Dashboards, collection and the site filter
The OTVR (PA) dashboard tracks volume, performance and progress of vulnerable items, and it needs the sn_otvr.remediation_owner role. Its Vulnerable Items tab carries trend reports, including remediation target adherence and mean time to remediate.
Configure the collection jobs first, because the dashboard stays empty until they run. Run the historical collection once, after which the daily jobs keep remediation task and vulnerable item data current. If you expect more than 1 million records from the indicator sources, override the expected record count on the indicator source before collecting.
The site filter on the OT Visibility, OTVR (PA) and risk rollup dashboards needs the cmdb_ot_isa_viewer role with access to the site. Devices with no site assigned need a site, then a business unit on that site.
Frequently asked questions
Why does the rollup show old numbers after I change a weight? The rollup is recalculated by the daily scheduled job, so new scores appear on the next run. Confirm the Service Populator value on the equipment model entities before you rerun the job.
Does the remediation owner role show all plants? The role carries cmdb_ot_isa_viewer, which gives site-based visibility. The broader cmdb_ot_isa_viewer_all role widens what a user can see across sites, so grant it only where that wider view is needed.
What makes a deferred item an exception? A request from a user, then an approver’s decision in the OT Vulnerability Exception Approvals flow. Each state change stays in the approvals history.
Do I need the performance dashboard before vulnerability data arrives? No. The dashboard fills in once the collection jobs run. Run the historical collection once, then let the daily jobs keep it current.
Next steps for the team
Work through the sequence in order, and check each stage before moving on. Settle device records and discovery feeds first, because the scores depend on them. For the generic go-live steps that apply to any Vulnerability Response setup, see the Vulnerability Response go-live checklist.