Configuration Compliance takes findings from third-party configuration scanners and turns them into remediation tasks. Imported test results are grouped by remediation task rules, scored by risk calculators, and moved through a set of states as owners investigate, defer, resolve or close them. Changes and exceptions are handled from the task itself.
How test results reach the application
Configuration Compliance does not run checks itself. Third-party integrations import the findings, and the application stores them as test results for viewing and remediation. Qualys and Tenable.io are the integrations covered here. Qualys results use a Start time setting in the Qualys PC Results integration details. Set it to a date no more than a month in the past, because a longer window can exceed Qualys API rate limits and time out. In Tenable.io, the Fixed Compliance Results integration runs first and triggers the Open Compliance Results integration when it completes, and the Backfill integration matches results with assets that were previously missing.
Each test result carries the fields a reviewer reads first.
| Field | What it holds |
|---|---|
| Source and Source ID | The scanning application and the control identifier it assigns |
| Result | Passed, Failed, Error or Unknown |
| First seen and Last seen | When the finding was first and last imported |
| Test and Configuration item | The control tested and the asset it ran against |
| Technology | The software version running on the asset |
| Expected and Actual values | A Boolean expression, and the values tested against it |
| Remediation | The remediation instructions for the finding |
Expected values form a Boolean expression. When the actual values satisfy it, the result is Passed. From version 14.9, Extended Evidence and Cause of Failure appear in the Actual values column. A test identifies a class of software or hardware asset that may be out of compliance, and test groups usually follow a technology class such as Windows or Cisco IOS.
Grouping results into remediation tasks
A remediation task holds results that will be worked as one piece. It can be created empty and filled by hand, created from a filter whose conditions fill the Test Results tab, or created automatically by a remediation task rule during import. Rules are the option that scales, because the groups form without anyone assigning results one at a time. A result can belong to more than one task, which lets a team work one group while watching another.
A rule has a name, an active switch, conditions, a Group By choice and up to six group keys, which are columns of the test result table. Matching is case insensitive unless the case sensitive box is ticked. The base system ships with an Assignment group, Test rule, which is disabled by default.
Each new or reopened result is compared with each rule after CI matching, risk calculation and assignment rules have run. On a match, the system looks for an open task in the same assignment group and adds the result to it. If there is none, it creates one. Each rule adds a comparison for each result, so a long rule list can slow the import. Rule changes are evaluated on the next import, or when you use the Reapply button on the rule form.
Manual creation needs sn_vulc.admin in the Vulnerability Manager Workspace, or sn_vulc.remediation_owner in the IT Remediation Workspace. Creating a task by selecting rows in the Test Results list suits results that have little in common. Results added by hand are not removed by rules or filter conditions.
Scoring risk so the queue has an order
Each test result scores from 0 to 100. The score comes from risk calculators that weigh the business criticality of the asset from the configuration management database, where a multi-service asset takes the highest criticality among its services, and the criticality the scanner supplies for the test.
| Risk rating | Risk score |
|---|---|
| 1 – Critical | 90 to 100 |
| 2 – High | 70 to 89 |
| 3 – Medium | 40 to 69 |
| 4 – Low | 1 to 39 |
| 5 – None | 0 |
Before version 15.0, a remediation task’s rolled-up score was weighted 85 percent to the highest result score and 15 percent to a factor based on the number of test results. From version 15.0 the weights are 80 percent for the highest score, 5 percent for the average score and 15 percent for the factor. The score changes as results are remediated, and passed results drop out of it from version 15.0. From version 15.0, a passed result keeps its score so the mitigated risk can be estimated, and passed results are excluded from the task score. Before that version, a passed result’s score was set to zero.
Rollup calculators cover each configuration test and each remediation task, and both calculator groups are enabled by default. Calculator rules can be applied on demand from the Default Risk Calculator record, which lets a team test a different prioritization before committing to it. The historical risk score appears after a group is Closed with a current score of zero, and it needs the Service Mapping plugin, a separate subscription.
How a remediation task moves through its states
The states are Open, Under investigation, Awaiting implementation, Deferred, Resolved and Closed. A task’s state drives the state of its results. When a result belongs to several tasks, an order of precedence decides its state.
Open and Under investigation move in either direction, and their results move with them, as do Open and In review. A deferred task passes its reason for resolution to its results. A task closed as Fixed can return to Open. A task closed with the Result invalid option cannot be reopened, although from version 14.12 that option is removed from the Close modal.
The scheduled job updates the Remediation status on each test result, and remediation target rules run after each scanner import. Test results past their target date show Target Missed, and results still in progress show In-flight. The remediation target date is counted from the date the target rule uses, such as First seen or Last pass. From version 14.12 the default is Last pass. Deferrals are tracked from version 14.3 in the Multiple deferrals module, where a daily job posts counts for records deferred more than once.
Exceptions, change requests and reassignment
An exception defers a task for a set period. The task must be Open, Under investigation or Awaiting implementation, and the requester needs sn_vulc.remediation_owner. The Until date must fall inside the window set in Exception Management. The reasons are Risk Accepted, Awaiting Maintenance Window, Fix Unavailable, Mitigating Control in Place and Other. Submitting the request moves the task to In Review, and expiry returns it to Open.
From version 14.7, a scanner that reopens a deferred task before the window ends can return it to Deferred. That behavior needs the sn_vulc.auto_defer_test_result_in_active_exception_window property set to true, and the property is false by default.
From a remediation task, a group of test results can be used to create a change request.
The Unassign button removes the assignment from tasks and results in any state other than Closed or Resolved. Results whose assignment group differs from their task’s group are not unassigned. Approval is required by default, and a vulnerability administrator can switch it off. A daily job counts unassigned tasks for each assignment rule, which shows which rules send work back.
Frequently asked questions
Does Configuration Compliance calculate its own test results?
No. The application imports test results from third-party integrations and stores them for viewing and remediation.
When is a remediation task created?
Either during import, when a remediation task rule matches a new or reopened result, or by a person, through a manual task, a filter or a selection from the Test Results list.
Why did results change groups after I edited a filter?
Filter conditions add matching results to the task and leave manually added results where they are, so check the manual entries first when a group looks wrong.
What happens when a scanner reopens a deferred task?
By default the task does not move back to Deferred. With the auto-defer system property set to true, a task reopened by a scanner inside the exception window moves from Open to Deferred, and its deferred until date is kept even after the window passes.
Which roles view and change these records?
Viewing and updating test results and remediation tasks needs sn_vulc.remediation_owner. Creating a task needs sn_vulc.admin in the Vulnerability Manager Workspace, or sn_vulc.remediation_owner in the IT Remediation Workspace.
For the wider picture of how this work sits within vulnerability management, see the vulnerability exposure response page.