A business capability map lays out your business capabilities as a hierarchy, with the applications that support each one attached. You build it on the Modeling page of the Enterprise Architecture Workspace, add capabilities and applications, send it for approval, and then commit it to the database.
Roles, access and the modeling application
The map is built with the Enterprise Modeling and Visualization application. Business capability maps are one of its diagram types, and each diagram is attached to an architectural artifact.
Three roles and access levels matter. Building needs the sn_apm.apm_user role. Changing an existing map also needs Owner or Editor access on that artifact or diagram, so a viewer can open a map but not alter it. Committing an approved diagram needs sn_apm.apm_analyst. Administrators who control which shapes appear in which diagram types use sn_apm.apm_admin.
Creating a business capability map
Open the Modeling page from the Enterprise Architecture Workspace, choose New, select Business capability map, and complete the form. Select Create diagram. The map opens in a new tab, and the artifact is added to the Architectural Artifacts related list on the capability, so the link back to the capability is visible from its record.
The form has a few fields, and the two checkboxes decide how much of the hierarchy is pulled in at the start.
| Field | What it controls |
|---|---|
| Link to artifact | Whether the map creates a new artifact or attaches to an existing one |
| Artifact name | The name of the new artifact, or the existing one you pick |
| Architectural category | The category assigned to the artifact |
| Include business application | Brings the business applications linked to a capability into the hierarchy map |
| Include all business capabilities | Brings all business capabilities into the map |
| Business capability | The level-0 capability to generate the map from; hidden when Include all business capabilities is ticked |
Adding capabilities and applications
A new map shows two levels of the hierarchy. A down arrow in any capability box expands the next level, so you can work through one branch at a time.
To add something, open the Add drop-down and choose Business Capability or Business Application. A new shape appears on the canvas. Select it, open the side panel, and map it to a record: Choose Existing picks a record already in the system, and Create New enters a new one.
Two details catch people out. When you pick an existing business capability, the list shows level-0 capabilities, and any capability already on the map is left out. To place a deeper capability, drag it into the hierarchy instead.
Drag a configuration item onto a capability to create the relationship. The border of the configuration item box turns dotted, and it turns solid once the diagram is committed successfully. A capability box can be colored from the palette, which helps a reader spot a group of related capabilities quickly.
Reorganizing the hierarchy
To change the structure, drag a capability from one parent to another. Edits save automatically as you work, so there is no save step to forget during a long session.
The hierarchy has a second step that is easy to miss. Capability IDs in the database follow the committed diagram, not the draft on your canvas. Once a restructure is committed, use the Update Hierarchies button on the Business Capability Hierarchy page (opened from the Business Portfolio icon), which needs the sn_apm.apm_analyst role, to refresh the IDs of all capabilities to match.
Approval, commits and versions
From the More Actions menu, choose Submit for approval. The request goes through a configured workflow, and by default it is routed to the Enterprise Architect group. Once the diagram is approved, the Commit changes button appears. Selecting it and confirming synchronizes the diagram and its elements to the ServiceNow database.
Several other controls help with version control. Save as new version creates a version inside the same artifact, and its version number is added automatically and cannot be edited. The version details form records a version label, a description and a planned rollout date.
Some actions switch off as a diagram moves through review. Once a diagram is submitted for approval, you can’t change it, so finish any connector labels before you submit.
| State | What you can do with the map |
|---|---|
| Editable, with Owner or Editor access | Add or move capabilities and applications, color them, save a new version, duplicate, share, or submit for approval |
| Submitted for approval | No changes can be made to the diagram, including connector labels |
| Approved | Commit changes to synchronize the diagram and its elements to the database |
Sharing and duplicating
Sharing brings other people into a draft. You add users or groups and choose one of three access levels. An Owner can edit, share, and change access for everyone except the actual owner. An Editor can edit, share with other Editors or Viewers, and change access for users they added. A Viewer can view the diagram and nothing else.
Open More actions, choose Duplicate, and enter a name. The result is a separate diagram that you can modify, which gives you a copy to restructure before you touch the original. A useful habit before a large reorganization is to duplicate, restructure the copy, submit the copy for approval, and then decide whether it replaces the original.
Working with shapes on the canvas
The palette holds General, AWS, CSDM, Enterprise Architecture, ArchiMate and BPMN shape libraries. The Shapes panel can be switched between list view and grid view.
Align and distribute are not available in a business capability map, so arrange capabilities by dragging them within the hierarchy.
Connectors have their own toolbar. When both ends are ArchiMate shapes, you choose the relationship type from the Link type drop-down. When a non-ArchiMate shape is involved, the toolbar offers line style (solid, dashed or dotted), start and end arrows, and a text label.
If a custom shape clutters one type of diagram but suits another, an administrator can hide it per diagram type. Go to the Setup page, open Enterprise Modeling and Visualization, then Shape Libraries. Open the custom library, select the shape element, and in its Details tab choose the diagram types to hide it in. Removing a type from that list brings the shape back.
From capability map to roadmap
A map shows what exists. A roadmap shows what is planned against it. The roadmap view needs the Strategic Planning plugin at version 4.0.2 or later, plus the sn_apm.apm_user and sn_align_core.apw_user roles.
On the Business Capability Hierarchy page, open the row context menu on a capability and choose View roadmap. The Planning page of the Strategic Planning Workspace opens with a temporary portfolio plan that gathers the planning items for that capability, its sub-capabilities and their linked applications. That plan is a preview. To plan and prioritize the work, copy it, give the copy a name, and optionally share it with the same users and groups.
The records behind those capabilities, including their hierarchy and scores, are covered on the business capabilities page in Strategic Portfolio Management.
Reading capability scores on the map
Score reading belongs to an earlier release and a different menu, so confirm which release your instance runs. Menu paths for capability scores differ between releases, so use the navigation your instance shows for the capability map.
In that view each capability carries a color-coded score. Red, orange and green mark the gap level of each capability, so confirm the score thresholds configured on your instance before relying on the colors.
The right pane lists the applications related to the selected capability, both directly and through the hierarchy, each with its overall score.
Frequently asked questions
Who can create a business capability map?
Anyone with the sn_apm.apm_user role can create one from the Modeling page. Changing an existing map also needs Owner or Editor access on that artifact.
Why does a capability not appear in the Choose Existing list?
That list shows level-0 capabilities and leaves out any capability already on the map. Add a deeper capability by dragging it into the hierarchy.
Why is the Commit changes button missing?
It appears once the diagram is approved. Submit the map for approval first. The default approver group is the Enterprise Architect group unless the workflow has been configured differently.
Can I see a roadmap without changing my plan?
Yes. View roadmap opens a temporary portfolio plan for preview. It becomes your working plan once you copy it.