Application rationalization in the Enterprise Architecture Workspace is the review where each business application in a category gets a decision: invest, sustain, migrate or retire. Indicator scores show how well an application fits your strategy, and total cost of ownership (TCO) records show what it costs to run.
What the review decides
Rationalization assesses all the business applications in a category, capability or family, and decides for each one whether to invest, sustain, migrate or retire. Each application gets one planned disposition, and the record required depends on which one you pick. If the portfolio itself is new to you, the application portfolio overview covers the basics first.
| Planned disposition | What the record needs |
|---|---|
| Invest | A planned disposition status and reasoning |
| Sustain | A planned disposition status and reasoning |
| Migrate | A planned disposition status, a target date, and reasoning |
| Retire | A status, a planned disposition date, and reasoning |
Setting a disposition keeps the record current, makes applications easier to find later, and helps control maintenance costs. The planned disposition date for Migrate and Retire must be today or a future date, and setting a disposition needs the sn_apm.apm_analyst role.
Finding the Application Rationalization page
Open the Enterprise Architecture Workspace from the Workspaces menu, then select the application rationalization icon. The page offers a bubble chart and a list view. The bubble chart shows assessed applications as a map; the list view shows all business applications with their scores as a table, so the two counts can differ.
Start from the Insights cards
Check the Insights section on the EA Workspace home page. Four cards cover candidates for retirement, migration and investment, plus applications whose planned disposition does not match their indicator scores. Selecting a card opens the Application Rationalization page with those applications.
Hidden applications and fiscal periods
Applications marked Retired or in the End of Life lifecycle stage are hidden by default on both views. The sn_apm_ws.business_application_default_filter system property controls this, and your ServiceNow account service manager makes the change. Scores show the latest fiscal period by default; pick another from the Scores for fiscal period list.
Reading the bubble chart
The chart places each assessed application on two axes. Each axis represents a metric category, and each labeled bubble is one business application. Hover over a bubble for a score summary, or select it to open the info pane.
Chart settings
Select the settings icon to change how the chart is built.
| Setting | What it controls | What to check |
|---|---|---|
| X and Y axis | The indicator plotted on each axis | Both indicators need scores for the selected fiscal period, or the bubble does not appear |
| Bubble size | The indicator that sets each bubble’s size | A custom indicator must be active and attached to the default application profile |
| Bubble color | The planned disposition of each application | Color follows the planned disposition of each application; use the chart legend |
| Bubble labels | Whether application names show on the chart | Turn on the toggle to read names directly |
Select Apply after changing settings.
Grouped bubbles and the display limit
When applications sit within 0.25 of each other on both axes, the chart merges them into one grouped bubble that shows a count. Select it and the info pane lists the applications inside.
The chart displays up to 500 bubbles by default. To raise that limit, change the sn_apm_ws.appRationalizationMaximumBubbles system property, which requires the sn_apm.apm_admin role. Filters, including an advanced filter on scores and business capabilities, narrow what appears.
Acting on a bubble
Hover over a bubble and open its context menu to create a demand, set the planned disposition, or add lifecycle data. Lifecycle data needs an application model ID, which you can type in or have the CSDM Product Model Assignment script create. Pan by holding Shift and dragging, once you have zoomed in.
Selecting a single bubble opens a side panel. Select the Details tab to edit the application, then select Update.
Working through the list view
The list view shows business applications with their indicator scores in one table, so you can compare them side by side. Custom indicators appear as new columns once they are active and attached to the default application profile.
Actual and normalized scores
The actual score is the raw value captured from its source, and it can vary widely between applications. The normalized score scales that value into a common range so indicators with different units can be compared. Turn on the Show actual score data toggle under the data visibility icon to see both.
Select an application name to open its details, or expand its row to see linked demands and projects. Use the Personalize icon to add or hide columns, and export to Excel or CSV. The Portfolio TCO column shows currency in the reference currency set by the glide.currency2.default_reference_currency property.
Adding cost data with Application TCO
The Application TCO plugin adds a Portfolio TCO indicator, four tables, three duplicate checks, and a Portfolio TCO dashboard tab. It installs automatically with the Enterprise Architecture Workspace plugin.
| Table | What it holds |
|---|---|
| Total Cost of Ownership | Cost records: cost type, expense type, cost, fiscal period, billing date, vendor, source and source cost type |
| TCO Cost Type | The Capex and Opex cost types used for reporting |
| TCO Source | The names of the sources that cost data comes from |
| TCO Source Cost Type | The cost types used inside each source |
Capex is capital expense and Opex is operating expense, and each cost type you create is set to one of the two.
Setting up sources and cost types
Set-up sits under Workspaces, Enterprise Architecture Workspace, Setup, then TCO. Create the source first, because a source cost type belongs to a source. Creating a source and a cost type needs the admin role: open Sources or Cost types, select New, enter a name and save. A cost type also takes the Capex or Opex expense type.
A source cost type needs the sn_apm.apm_analyst role. Open the source, select its TCO Source Cost Types tab, select New, and enter a name and domain.
Set com.glide.fiscal_calendar.fiscal_unit under All, then System Properties, then All Properties, to Quarter, Month or Week so the Portfolio TCO dashboard shows the span you need.
Recording a cost
Open Workspaces, then the Enterprise Architecture Workspace, then the Portfolio icon. Expand the row beside Application Portfolio, select Total Cost of Ownership, then select New or open an existing record. Adding records uses the admin role.
| Field | What to enter |
|---|---|
| Business application | The application the cost belongs to |
| Cost type | The cost type used in the calculation |
| Cost | The currency and the amount |
| Fiscal period | The period the cost is calculated for |
| Billing date | The date of the billing |
| Reference | Free-text reference details |
| Vendor | The vendor of the application |
| Source | The source of the TCO figure |
| Source cost type | The source’s own cost type; editable when a source is selected |
| Short description | A summary of the cost record |
Refreshing score ranges after an upgrade
The Business applications by TCO score widget reads its bands from a Score range field on indicator score records. Records created before an upgrade leave that field empty, so the widget’s X-axis shows no bands. New installations fill it automatically.
To fix an upgraded instance, open the scheduled job named Update Score Range in Indicator Score Table, check that the application scope is Enterprise Architecture Workspace, select the Active check box, and select Execute Now. The job is one-time and inactive by default.
Technical debt as a rationalization input
The Technical Debt indicator counts how many of an application’s technologies fall outside the Technology Reference Model (TRM) standards. It can drive bubble size and sorts as a list view column. Some applications receive no score.
| Situation | Result |
|---|---|
| Discovered, with no non-compliant technologies | Score 0, normalized value 10 |
| Found in discovered technologies and in TRM technical debts | Score from 1 to 10 by count of non-compliant technologies; normalized 1 to 10 |
| Not found in discovered technologies | Not assessed; no score |
| Hardware only | Not assessed; no score |
In the normalized value, more debt gives a lower number. Run both scheduled jobs: Populate TPM Discovered Technologies and Lifecycles, and Populate TRM technical debts in the EA Workspace (the second needs the Software Asset Management Foundation or Professional plugin). Then regenerate the Technical Debt indicator from the Setup page.
TLM labels appear only when the Enterprise Architecture Workspace is version 9.2.1 or later and the sn_apm_tpm plugin is version 1.11.0 or later; otherwise the interface keeps the TPM label. Table and job names keep TPM either way.
Frequently asked questions
Why is a retired application missing from the bubble chart?
Retired and End of Life applications are hidden by default. Your ServiceNow account service manager can change the business application default filter property.
How many bubbles can the chart show?
By default, 500. Raise the limit with the appRationalizationMaximumBubbles property, which needs the sn_apm.apm_admin role.
Why does the TCO widget show no score bands after an upgrade?
Records created before the upgrade leave the Score range field empty. Run the Update Score Range in Indicator Score Table job once to fill it.
Can I use a custom indicator on the chart?
Yes. It needs to be active and attached to the default application profile before it appears in the bubble size list or as a list view column.