The Asset library is the starting screen of Assistant Designer in ServiceNow Virtual Agent. It lists LLM assets and NLU or keyword topics together, lets you filter them by assistant, type and status, and holds the row menu that sets whether an asset is active, visible, discoverable or promoted.
Opening the Asset library and moving between views
Go to All, then Conversational Interfaces, then Assistant Designer, and select the Asset library tab. The header bar holds an Asset library tab, which returns you to the Asset library list from any open topic. Each open topic adds its own tab, and hovering over it shows the topic type and application scope.
If a topic has unsaved changes and you close it, a warning offers Cancel or Close without saving, so read it before you confirm. Overflow tabs collect in a drop-down on the header bar. The Brazil list view described here requires ServiceNow Otto for Virtual Agent; without it, the legacy topics page appears. Check labels against your release and enabled features.
The user preferences icon holds a Group tabs by app scope toggle, which groups open tabs by scope.
Filtering and reading the topic list
A switch at the top of the list selects between LLM and NLU/keyword discovery, and the controls beneath it change with the choice.
For LLM assets, the Select Assistant drop-down narrows the list to one assistant. Test Assistant opens a chat window for that assistant’s topics, with the experiences the instance has configured. Asset-type buttons sit beside the drop-down: All assets, Topics, Subflows, Actions, Custom skills, AI agents and Agentic workflows. Custom skills come from AI Skill Kit and AI agents from AI Agent Studio.
For NLU/keyword topics the controls are Test active topics and Create topic. In both modes, the search and filter icons narrow the list by text or by field, operator and value.
The default columns are these:
- Name: The name given when the asset was created
- Type: Topic, Topic Block, Setup Topic, Small Talk, Custom Input Control, Custom Response Control, Subflows or Actions
- Status: Draft, Modified (unsaved changes) or Published
- Active: Whether the asset is switched on
- Last modified: The date and time the asset was last changed
- Description: Text used for topic discovery under LLM
- Promoted in: The assistants in which the asset is promoted
Conversational subflows and actions appear here when ServiceNow Otto for Virtual Agent is configured, and they reach users once the Subflows and actions skill is turned on in ServiceNow Otto Admin. For the wider concept, see the subflow explainer.
Reviewing the list before changing an asset
Choose the discovery mode first, then select an assistant for an LLM review. That sequence avoids comparing an unfiltered library with the assets associated with one assistant. Select the relevant asset-type button before searching a name, especially when topics and actions have similar names.
The Search icon adds your text as a filter condition. If a known asset seems missing, inspect existing conditions and remove those you no longer need using the delete condition icon. Refresh list reloads the list with its current filters; it does not remove those conditions. Record the selected assistant and conditions when handing an issue to another administrator.
Compare Status, Active and Promoted in together. A published asset and a promoted asset describe different aspects of readiness. For an LLM discovery problem, inspect the description through Conversational Settings and compare it with the user’s request. Discoverable allows the assistant to find a matching asset, while Promoted puts it among suggestions.
For help planning this work, see ServiceNow implementation.
Row actions: active, visible, discoverable and promoted
Each row has a Show actions for this row icon. Its Visibility submenu separates the controls for activation, discovery and display.
- Active: Whether the asset is switched on or off
- Visible: The Visible toggle, which requires the asset to be Active
- Discoverable: The Discoverable toggle, which requires the asset to be Active
- Promoted: Whether the asset appears in the assistant’s suggested list
System topics, setup topics, topic blocks, custom controls and small talk topics cannot be promoted. System topics, setup topics, topic blocks and custom controls cannot be made visible or discoverable. Promoted, discoverable and visible all require the asset to be Active.
Conversational Settings shows the asset’s name, type and description. Remove from assistant appears once the list is filtered to an assistant. Delete asks for confirmation first.
Building the topic in the Properties and Flow tabs
The Properties tab identifies the asset: its name and type, purpose, the assistants that can run it, the users and channels allowed to use it, and either keywords or an NLU model and intent. For the underlying idea of a topic, read the explainer on Virtual Agent topics first.
The Flow tab holds the conversation. The default view is a diagram, and the Table View option turns each node into a row. In that view, Add new node inserts a node into the row you pick, and the property sheet for the focused row opens beside it. The Search table option finds a node quickly on long topics.
Controls fall into three groups. User input controls prompt the user and capture answers. Bot responses display output, and their appearance varies by messaging platform. Utilities run work inside the flow and display nothing. The utilities include Lookup and Record Action for records, Decision for branching, Topic Block for reuse and Deflection for tracking resolved issues.
The NLU Intent tab appears on a topic that uses NLU discovery. There you review utterances and entities, train the model and test intent recognition.
Testing and debugging a topic
Consider duplicating a live topic before changing its flow, so you have a separate comparison topic. Check the application scope first because the duplicate takes your current scope.
For NLU/keyword topics, Test in the topic header opens a chat test window with Analysis, Variables, Context and Logs tabs. The window shows Service Portal rendering, so test each messaging channel you plan to use.
Incomplete information appears as a badge on the flow diagram and warning badges beside affected nodes. Selecting Test with unresolved issues opens Validation Issues on the sidebar, with descriptions and links to incomplete nodes. Correct the listed fields and rerun the conversation rather than treating a successful save as a successful test.
- The wrong topic starts: inspect intent matching in Analysis before changing the flow.
- A branch receives the wrong answer: inspect the captured value in Variables.
- The conversation fails during execution: inspect processing and error messages in Logs.
For troubleshooting beyond these symptoms, see the Virtual Agent troubleshooting guide.
Application scope and domains
Set the application scope before you create or update a topic. For the wider concept, see the application scope explainer. ITSM conversations, for example, belong in the ITSM Virtual Agent Conversations scope, not the ITSM NLU Model scope. Changing scope needs the virtual_agent_admin or admin role.
The status bar on the topic page shows the current scope. A topic from another scope opens with a warning banner and locked editing, though you can still activate, publish or duplicate it. Select the globe icon in the navigation bar, then Application Scope, and choose the scope for the conversation. A ring around the globe means the scope is not global.
Localizing topics
Assistant Designer integrates with Localization Framework to manage topic translations. To edit and publish translations directly in Assistant Designer, use virtual_agent_admin or admin. Open a published topic, select Languages, then Edit in the Topic translations column. Publish Translations makes the text available dynamically for keyword topics.
For NLU conversations, localize the topic and the model group, then check their mappings and test the localized models. Translating the conversation text does not complete the model work. For language planning, see the Virtual Agent localization guide.
Promoting and ordering LLM assets
Promoting or demoting an asset requires virtual_agent_admin or admin. Promotion starts once an asset is linked to an LLM assistant. Filter by that assistant, open the row’s actions and toggle Promoted. A check mark marks promoted assets. For the full set of Virtual Agent guides, see the Virtual Agent hub.
By default, promoted assets are listed alphabetically. To change the order, use virtual_agent_admin or admin, open the Promoted Skills table, sys_cs_context_profile_promoted_skill, and set the Order value on the asset, then select Update. An asset with a condition is shown first whenever that condition is met.
Questions about less obvious Asset library controls
Where can I find a topic I opened recently?
Open the collapsible side panel. Pick up where you left off lists your last three topics and their update times. Latest updates shows the last five users to open a topic, with the topic name and update information.
Can I change which columns appear?
Yes. Edit columns lets you select and reorder columns in the topic records list. Place the fields needed for your review together so you can compare assets without opening each one.
What does Link to asset open?
In the LLM Conversational Settings window, Link to asset opens the asset in a tab within the library. Use it to move from the asset summary into its editor without searching the list again.
Why do grouped tabs have different colors?
Group tabs by app scope assigns random colors to scope groups. Use the topic’s displayed scope to identify its application rather than treating a particular color as a fixed application identifier.