OBLYTECH Logo
OBLYTECH Logo

Zero Touch Refresh for Hardware Assets: Setup and Workflow

Zero Touch Refresh is a hardware refresh flow in which an employee swaps an asset they own for a replacement an external provider ships directly, so the organisation does not need to hold local replacement stock. The old device goes back to the stockroom for evaluation. Setup needs a Service Exchange connection and replacement models for each refreshed model.

How the refresh flow moves an asset from request to evaluation

The point of the flow is that the provider holds the new stock and sends it to the person who needs it. Inside your instance, each stage is a linked task. A request is approved and raises a confirmation task, which closes automatically once the provider confirms. A shipment task follows and closes when the provider ships. Once the replacement arrives, the employee confirms receipt, and the old asset returns to the stockroom in a labelled box sent with the new device. An inventory manager then confirms the return and evaluates the old asset.

The flow depends on an external provider and is set up to integrate with Insight. Both instances need the Service Exchange application. For the wider picture of how refresh sits beside disposal, repair and stockroom work, the hardware asset management overview is the right starting point.

Setting up the provider connection with Service Exchange

Service Exchange links your instance to the provider’s instance. The provider installs Service Exchange for Providers, onboards a new Service Exchange customer and triggers the assignment of a remote task. Your organisation installs Service Exchange for Consumers and activates the remote task definitions the provider has published.

Configuration falls into two items: the Service Exchange connection, and replacement model configuration for each refresh model. The connection concerns the relationship with one provider, while replacement models are the part that tends to change as the hardware range changes.

Configuring refresh models and replacement models

The replacement list employees see is driven by refresh models. A refresh model ties a hardware model being refreshed to the models an employee may receive in its place, for a given location. Creating them needs the admin role. Go to All, then Hardware Asset Workspace, then Asset operations. In the Zero touch refresh list, select Refresh models, then select New. Fill in Model (the model being refreshed), Location (where the replacement models are valid) and Active (whether the rule is in use). Select Save.

Country-level configuration is the efficient starting point, and narrower locations such as a state or a city are also possible. The common failure here is a refresh model built for one location while the assets it should cover sit in another. The request form uses the selected asset’s model and location, and falls back to the requester’s location when the asset has no location. If the model records behind these choices still need matching and tidying, that guide covers the step.

Then open the Replacement models tab, select Add, choose the models in the dialog, select Add again, and save. The refresh model then appears in the Refresh models list.

Submitting a refresh request as an employee

Employees start from All, then Service Catalog, then Asset Lifecycle, and choose Zero Touch Refresh. No role is required. If the Asset Lifecycle category is missing, the employee should contact an administrator.

Eligibility is checked when the asset is selected. If the asset is not eligible, the form states that approvals will be requested, and an approval request goes automatically to the asset manager.

For delivery, set the shipping location to Your location and the refresh method to Ship. The form shows the employee’s address and phone number, and both can be changed. For collection, set the shipping location to Stockroom and the refresh method to Pickup, then choose a pickup location from the stockroom locations in the employee’s country. Tick the acknowledge check box confirming the shipping choice, select Submit, and follow progress under All, then Self-Service, then My Requests.

Provider fulfilment and the stockroom side

On the provider’s instance, a Zero Touch Refresh Fulfillment Request appears under All, then Zero Touch Refresh Fulfillment Requests. Open one in the Requested state. The Customer request number field shows the number of the customer’s request. Set State to Order confirmed and save. When shipping, enter the asset tag and serial number of the replacement, then the tracking number and carrier in both the Shipment details and Return shipment details tabs. Set State to Shipped and save, and include a box with a stockroom address label for the old asset.

Tracking details produce shipment records for the replacement and the old asset. When both use the same tracking number, one shipment record is created. These appear in the Assets operations view of the Hardware Asset Workspace.

For pickup, a Ready for pickup task is created. The stockroom manager tells the employee the device is waiting, selects the task and Close Task, and an email confirms arrival. Closing it creates the Receive asset task. Email recipients depend on the method: a shipment to the employee notifies asset-role users, and a stockroom shipment also notifies that stockroom’s manager.

Closing out the old asset

When the new device ships, a Receive return asset task is created. Closing it, once the old asset is back at the stockroom, creates the Asset evaluation task. The evaluation has three outcomes. Re-deployable sets the asset to In stock with a substate of Available. Needs repair sets it to In stock with a substate of Pending repair and starts the Return Merchandise Authorization flow, which the RMA and disposal guide explains. To be disposed sets it to In stock with a substate of Pending disposal. Once the evaluation is closed, the request moves to Closed complete and Completed.

The evaluation is easy to leave for later. Until it closes, the request is not finished, even though the employee already has the replacement.

Employee acknowledgement on mobile and in the Core UI

On mobile, the employee installs the ServiceNow mobile app on iOS or Android, opens My Items, then My assets, taps the asset and selects Scan delivered asset. The asset tag is scanned or typed into the Asset tag field, and Submit is selected. The asset state changes to In use and the Receive asset task closes.

In the Core UI, the employee goes to All, then Self-Service, then My Requests, opens the Zero Touch Refresh request, and on the Zero Touch Refresh Tasks tab selects the Receive asset task and then Close task. Employees can also acknowledge receipt on the Employee Center portal.

Online acknowledgement closes the Receive asset task automatically. If a device was collected but not acknowledged online, a user with the admin or asset role can close the task on the employee’s behalf.

Where refresh setups usually stall

Stalls tend to come from a few known points. The common failure here is a provider side that is not yet in place even though the employee form works. Confirmation runs through the Service Exchange link, so checking the connection before testing the employee experience saves time.

A second stall is a collected device whose Receive asset task stays open because the employee has not acknowledged it. Agreeing in advance who closes that task avoids a request that looks unfinished. Teams also often treat the employee’s receipt as the finish line, but the Asset evaluation task still has to be resolved, so deciding who owns it before the first request is easier than chasing it afterwards.

Frequently asked questions

Does the employee get the replacement before returning the old device?

Yes, the replacement ships with a return box and label. The employee confirms receipt first, then returns the old asset to the stockroom, and the inventory manager confirms and evaluates it.

Can an employee collect the replacement from a stockroom instead?

Yes. The employee chooses the Pickup refresh method and a stockroom location in their country. The provider ships to that stockroom, a Ready for pickup task is created, and the employee collects after the stockroom manager notifies them.

What happens if the asset is not eligible for refresh?

The form states that approvals will be requested, and an approval request goes to the asset manager automatically.

Who has to configure the flow before employees can use it?

Service Exchange must be in place on both the provider and employee instances, and an admin creates refresh models and adds replacement models. Without a refresh model covering an asset’s model and location, the form has no replacement to offer.

What does the asset evaluation decide?

It decides whether the returned device goes back into use, goes to repair through the RMA flow, or is disposed.

Next steps for a refresh programme

Start with the provider connection, then build refresh models for the hardware you expect to refresh, then test one request all the way to evaluation before opening it to employees. A single end-to-end test shows more than a long list of configuration screens. Refresh also sits within the wider asset lifecycle guides. If you want outside help with the setup, our ServiceNow CMDB, CSDM and ITAM page describes that work.