ServiceNow generates OSHA 300 Log, 300A Summary and 301 forms from injury and illness records after the Health and Safety Incident Management OSHA Content Pack is installed. Each record needs the Recordable option and an establishment. The 300 and 300A cover one establishment for one year; the 301 covers one case.
Which OSHA form answers which question
The three forms are not interchangeable, so pick the right one before you open a record. The OSHA 300 Log is the log of all work-related injuries and illnesses that happened in an establishment between 1 January and 31 December of a calendar year. The OSHA 300A Summary totals the same recordable records for that establishment and year, and it draws in the total hours worked by employees. The OSHA 301 is a per-case form generated from one injury and illness report.
The Health and Safety Incident Management OSHA Content Pack produces the OSHA forms, and OSHA is part of the United States Department of Labor.
Prerequisites for generating any OSHA form
Four conditions need to be in place. Two are set on each injury and illness report, one is a role, and the last is the content pack itself.
| Condition | Where it applies | Why it matters |
|---|---|---|
| OSHA Content Pack installed | The instance, application com.snc.sn_hs_im_osha | Supplies the 300, 300A and 301 templates and the generation buttons |
| Recordable option selected | Each injury and illness report | Recordable records are the ones included in an OSHA form |
| Establishment field populated | Each injury and illness report | A record without an establishment is left out of generated reports |
| Safety compliance manager role | The user generating the form, sn_ohs_im.compliance_manager | Required to generate forms and to edit the Recordable field |
The Recordable field deserves particular attention. Editing it is limited to safety compliance managers, so a frontline agent can log an injury but cannot decide that it counts toward compliance reporting.
Setting up the content pack and its PDF templates
Installing the content pack requires the admin role. The package includes demo data and pulls in any ServiceNow Store applications and plugins the instance does not already have, so check that list before you start.
The pack ships with preconfigured PDF templates for the 300, 300A and 301 forms. Each template is stored as a file in the HS OSHA PDF template table, and a system property holds the identifier that tells the generator which template to fill. Leave the properties alone until you replace a template.
| Property | Form it governs |
|---|---|
| sn_hs_im_osha.osha_300_form_pdf_template_sys_id | OSHA 300 Log |
| sn_hs_im_osha.osha_300a_form_pdf_template_sys_id | OSHA 300A Summary |
| sn_hs_im_osha.osha_301_form_pdf_template_sys_id | OSHA 301 |
You find the properties under All, then Health and Safety, then Health and Safety administration, then Properties.
Logging the injury or illness so it can be reported
Compliance reports draw on the injury record, which starts during the safety incident. Open the incident from the Safety Incidents list, select the Report an incident tab to open the playbook, and add an injury and illness activity. Create one injury and illness record for each affected person.
Recording who was affected
The Person type field offers four values. Employee refers to someone who works for the organization where the injury happened. Visitor is someone from outside the organization who came on site, and visitors appear in the selection list when they hold a Health and Safety profile. Public covers a member of the public who was present. Contractor appears when the Health and Safety Contractor Management application is installed.
Redact name removes the employee’s name from generated reports, and the words Privacy concern case take its place. Sensitive content limits viewing of the record to users holding the Sensitive content user role. A generated OSHA form still counts that incident, but it leaves the incident details out.
Describing the injury and its timing
The injury picker is a visual body map. Once the record is saved, select a body part, then set its severity, the affected body part and a description. If one body part has more than one injury, use Add New Injury for each.
Record when the injury happened and when the employee started work that day. The record also holds the days the employee has been away from work and the days spent on job transfer or restriction.
Generating an OSHA 300 Log or 300A Summary for an establishment
The 300 and 300A are annual exports, one per establishment. The report draws on recordable records dated from 1 January to 31 December of the year you select.
- Open All, then Health and Safety, then Health and Safety Workspace.
- Select the incident management icon and go to the Lists tab.
- Under the Injury / illnesses list, open a report list. Choose Recordable to narrow it, or All to see everything.
- Select Generate OSHA forms, complete the dialog using the table below, and select Generate.
| Field | What to enter |
|---|---|
| Form type | OSHA 300 Log or OSHA 300A Summary |
| Establishment | The establishment to report on, with the recordable records assigned to it |
| File type | CSV or PDF |
| Year | The calendar year the form covers |
For PDF, the system fills the saved template with values from the recordable records. For the 300A, total hours worked come from the establishment’s annual information for that year. When a year has no hours recorded for the establishment, the system uses the Total Hours Worked property. That property holds the organization’s total employee hours for the past 12 months and is not broken down by establishment, so enter the establishment’s own annual hours for an accurate 300A.
Saved forms sit in the Attachments section of the establishment record, which you open from the Establishments list.
Generating an OSHA 301 form for a single case
A 301 needs the content pack installed, the report marked Recordable, and the safety compliance manager role. You can start from the safety incident or from the injury list.
From a safety incident, open the Safety Incidents list, choose All, select the incident, open the Report an incident tab, and pick the injury in the Add injury and illness activity. From an injury list, open the Injury / illnesses list, choose Recordable or All, open the report, and confirm the Recordable option is selected.
Select Generate OSHA 301 form, choose CSV or PDF, and select Generate. The form is filled from the report using the saved 301 template and appears in the Attachments section of the incident. Those three conditions must be met before you can generate the form.
Keeping establishments and annual hours current
In the Establishments list, select New, or open a record and select Edit. The Details tab asks for an industry code and a short industry description. The code can be a Standard Industrial Classification code, which the US government assigns, or a North American Industry Classification System code, which covers Canada, the United States and Mexico.
Saving opens an Annual information tab. For each year, select New, enter the year and save. That year then gets a Periodic total work hours tab, where each period takes a start date, an end date and the hours worked. The periods add up to the annual total, which is the figure the 300A reads.
Viewing saved forms and replacing a template
When a form’s layout changes, the template can be replaced. This needs the admin or agent role, and the order matters:
- Upload the new PDF first.
- Open the HS OSHA PDF template table by entering sn_hs_im_osha_template.list in the navigation filter, and select the template.
- Under Manage attachments, delete the old PDF and upload the new one, select Update, and activate the uploaded file.
- In sys_attachment.list, set the new file’s State to Available and copy its sys_id.
- Open the matching property under Health and Safety administration, then Properties. Paste the sys_id into its Value field and save.
Connecting an injury to HR and return-to-work cases
Some injuries lead to a case as well as a form. The apps installed decide which case route you see. Both need the Health and Safety Case Management application, the safety case manager role, and the Person type set to Employee.
The HR case route needs the Human Resources Scoped App: Core plugin. It suits an employee on leave because of an injury or who needs other HR help. Select Create HR Case on the injury record and confirm. The case is linked in the HRSD case record field.
The return to work route appears when that HR plugin is not installed. It suits an employee coming back after an injury, letting someone assess capability before the return. Select Create RTW case and confirm. The case is linked in the RTW case record field, and the injury record fills the Injury and illness tab of the case automatically.
Frequently asked questions
Does a recordable injury without an establishment appear in a 300A?
No. A record is included in a generated report only when it is marked Recordable and has an establishment assigned, so set the Establishment field before running the export.
Why might a recordable injury be missing from a generated form?
Check three things: the year, since the form covers 1 January to 31 December of the selected calendar year; the establishment; and the Recordable option, since non-recordable records are left out.
Are sensitive incidents removed from an OSHA form?
They are not removed. The form includes all incidents, including those marked sensitive, in line with the template, but their details are not shown.
Do I need annual hours before I can export a 300A?
No, but you should add them. The export falls back to the default in the Total hours worked system property when a year has no hours recorded. Periodic hours give the form the establishment’s own annual total.