Otto for Process Mining: Improvement Opportunities Explained

ServiceNow Otto for Process Mining, in the Brazil release, pairs process mining with generative AI to explain why a transition is slow. You build a library of improvement opportunities on the process table, choose the ones each project needs, then read results on the Opportunity details page, where affected steps are highlighted in the process graph.

Where Otto fits in a project

Process mining shows the paths records take. The harder question follows: why does one handover take longer than the rest, or why does a step keep reopening? Answering that by hand means opening records transition by transition. In a large process, reading transitions one at a time is slow, and a pattern that repeats across many records is easy to overlook.

Otto addresses that gap with three skills you switch on separately: transition work notes analysis, process inefficiency highlights, and intent and activity analysis. Two more skills, one that drafts process configuration and one that maps process steps to stakeholder responsibilities, are active by default. For the project side of the setup, see how process mining projects work.

Prerequisites and data handling

The generative AI capabilities need ServiceNow Otto for Creator, installed from the ServiceNow Store. Availability varies. Some Otto features are not offered in FedRAMP, NSC DoD IL5 or Australia IRAP-protected data centers, on self-hosted instances, or in other restricted environments, and some are limited to certain regions. Confirm what your instance can use before you promise a team a capability. For the Otto side of reporting, see Otto for Platform Analytics.

Data also leaves the instance. Relevant data moves to a central ServiceNow environment that may sit in another data center region, and it can pass to a third-party cloud provider, Microsoft Azure being one example. The feature collects information about work notes in Process Mining, and ServiceNow uses inputs, outputs and edits to improve its technologies. You can opt out of future collection at any time from the AI opt-out page in the platform. Settle that with your privacy and security owners before you switch the skills on.

Treat output as a draft. AI results can be inaccurate, incomplete or inappropriate, and testing for your own use case may not have happened. Test on your own data, keep a person reviewing results, and raise the review bar in healthcare, finance, legal, employment, security and infrastructure work.

Analyzing work notes on an inefficient transition

Select a transition in the process graph and a details window opens. Under Investigate you can view the records behind the transition or run a work notes analysis. The analysis gathers the eligible work notes and, from 25 notes up, clusters them before the language model is called. Under 25 notes, all of them go into one model call.

The number of eligible work notes decides the path. The feature works with 5 to 50 eligible notes.

Eligible work notes What happens
5 to 24 No clustering; all notes go into one model call
25 to 50 Clustering runs before the model call

The analysis runs as a scheduled background task, so you return for the result once it completes. Before it works, activate the Transition Work Notes Analysis skill and configure work notes analysis on the process table. A project built on that table inherits the setup. System properties control the behaviour, so review them with your administrator.

Choosing automated patterns

Improvement opportunities are either automated or rule-based. Automated ones draw on prebuilt patterns you select. Rule-based ones are chains of one or more rules run in sequence, and matching records count as matches. A project can hold up to 15 automated definitions, and the Brazil release offers eleven patterns:

Pattern What it surfaces
Ping-pong A record moves back and forth between two steps
Extra step Routes differ by one additional step
Slow duration on nodes One group stays in a step longer than another group’s average
Slow duration on transitions One group takes longer to move between steps than another
Extreme repetition A transition repeats beyond its usual range
Extreme duration on nodes Records remain in a step far longer than usual
Extreme duration on transitions Moves between steps take far longer than usual
Repeating pattern A sequence of steps recurs as a loop
Rework One step is repeated
High touchpoints on nodes One group receives more record updates than another before progressing
Extreme touchpoints on nodes A step needs an unusually large number of updates before any next step

Open the process configuration for the table, go to Improvement opportunities, and select recommended automated items with Add Selected. Get recommendations proposes items based on the process perspectives set on the Process details page, so set those first. Finish completes the configuration. Projects can also take opportunities from the Set improvement opportunities tab: select Edit for the project, then the edit button for the Improvement opportunities section, then New on the Select improvement opportunities tab. The Finding Builder opens from Take action, then Edit definition, on an opportunity’s Opportunity details page.

Building a rule-based opportunity

Rule-based opportunities suit questions the prebuilt patterns miss. Open the Process Mining Workspace, select a project, and choose Process steps on the Analyst workbench. Define each activity with conditions made of a field, an operator and values, and use Occurrence to apply a condition to the first, last or all occurrences. A transition filter needs at least two steps. If your process data starts in another system, see importing Workday or Salesforce data into ServiceNow Process Mining.

The relationship between adjacent activities deserves the closest attention. Directly followed by requires an immediate hand-off. At some point followed by allows other steps in between. Not directly followed by and Never followed by help find skipped or forbidden routes. Criteria between steps add Time between steps, While attribute remained, and Touchpoints between steps. The Apply map to view setting decides whether the project view counts (Current) or just your filter counts (Matching the filter).

Select Save as improvement opportunity from the Actions list and choose the project, the process configuration, or both. The process configuration option needs the power user role.

Roles matter. The sn_process_mining_admin and sn_process_mining_power_user roles can create opportunities for a project. The sn_process_mining_analyst role can view them but cannot create, edit or delete them.

Reading an opportunity on the details page

Open a project, choose the Improvement Opportunities icon on the side panel, and select an opportunity. Per-finding metrics appear at the top, and the process graph shows the pattern in red. Ping-pong highlights both nodes and the arcs between them. Rework highlights the one designated node. Extra step highlights the node and its incoming and outgoing arcs. Slow transition highlights the nodes and arcs between them, which marks a handover between teams.

Analyze in analyst workbench opens the workbench already in context. Take action lets you set the status, create a note, a CIM or an automation request, or select Edit definition. The highlights option appears once the Process Inefficiency Highlights skill is active. The Trends tab compares the average time to completion, which applies to rule-based and automated opportunities, with an occurrence bar chart offered for automated opportunities. The Breakdowns tab splits results by a chosen Type field, and the Variants tab sorts by top variation based on record count by default. Create a Task Mining project from the Opportunity details page. For setting up process mining dashboards, see process mining on platform analytics dashboards.

Setting up recommendations and child tables

The Recommendations setup page has three sections. Activity fields decide what appears on the process map. The State definition and Team definition columns fill in automatically, and additional columns become activity recommendations in projects.

Breakdown fields segment the process. Classification fields, such as Category or Channel, feed automated root cause recommendations, and importance fields, such as Priority, describe how much records matter. These limits apply:

Limit Value
Breakdown column length 250 characters maximum
Dot-walk depth 3 levels
Parent table, string breakdowns combined 6,400 values
Child table, string field Excluded above 640 unique values
Child table, non-string field 5,000 unique values per field
Child tables, combined unique values Above 100k excludes all child breakdowns

Child tables bring in dependent subprocesses, such as Incident Task under Incident. Add one with the plus sign, pick a table and a source field, then continue to investigative features.

Credits and limits

A clustered work notes request costs 250 assist credits however many notes it holds, and extra results from that request add no charge. When clustering is skipped, the request costs 100 credits. A request that returns no results costs nothing. Plan the automated library around the 15-definition ceiling per project.

Frequently asked questions

Which role configures improvement opportunities?

Use sn_process_mining_power_user or sn_process_mining_admin. The analyst role can view opportunities but cannot change them.

Why is the highlights option missing?

The Process Inefficiency Highlights skill must be active on the instance. Until then the option does not appear.

Should I act on an AI explanation directly?

No. Output can be inaccurate or incomplete. Check the underlying records through the Investigate options before you act.

Where do I start a Task Mining project?

Create a Task Mining project from the Opportunity details page.