ServiceNow Otto for Security Incident Response puts generative AI skills inside security incident records, the Security Incident Response Workspace and the ServiceNow Otto panel. Analysts can summarize a case, draft closure notes, request next steps and find past records that share a user, configuration item or observable with the current incident.
What the generative AI skills cover
The security incident skills include summarization, closure notes, recommended actions, post-incident analysis, metrics analysis and correlation insights. Earlier releases called this experience Now Assist, and the features now appear under the ServiceNow Otto name. For a public-sector view of these Otto skills, see investigative case management and Otto skills.
The table shows the five skills analysts meet in daily case work and where each can be requested.
| Skill | What it produces | Where it can be requested |
|---|---|---|
| Security incident summarisation | Summary of the issue, incident details, observables and actions already taken | Incident record, SIR Workspace, ServiceNow Otto panel |
| Resolution notes generation | Draft closure notes built from the containment and remediation work | Incident record, SIR Workspace, ServiceNow Otto panel |
| Recommended actions | Next steps drawn from existing incidents and knowledge articles | Security incident record and SIR Workspace |
| Post-incident analysis | Root cause analysis, impact assessment and lessons learned | Incident record, SIR Workspace |
| Correlation insights | Past incidents, changes, problems and vulnerable items linked by user, configuration item or observable | SIR Workspace Investigation tab, ServiceNow Otto panel |
The other skills are a quality assessment, shift handover content, a resolution plan, security operations metrics analysis and SIR data analysis. Metrics analysis runs through an AI agent, so its skill must be activated first.
Installing the plugins and switching skills on
Setup happens in the AI Admin Hub console. Install the ServiceNow Otto for Security Incident Response application, identifier sn_sec_gen_ai, and the Security Incident Response Core application, identifier sn_si. Updating the Otto application also updates its dependency applications automatically.
Some skills, AI agents and agentic workflows are on by default. Correlation insights is one of them, so eligible analysts see the option without a separate step. Other skills can be deactivated, configured and reactivated in the guided setup under Admin > AI Admin Hub > AI Skills, Technology > Security Operations.
Editing a skill in place limits you to the options shown as active in the left panel. For more configurable options, copy the skill first.
The quality assessment skill runs on a predefined, natural language rule set. The resolution plan skill takes your existing runbooks as extra context. Which skills appear depends on your license terms, so confirm them with your account team.
Roles control access. Analysts, managers and basic users need sn_si.analyst, sn_si.manager or sn_si.basic to use the skills, and sn_si.admin to configure them. AI agents use role masking, so if you select users with specific roles, add those roles to the agent’s security controls and data access settings.
Customizing a skill without touching the original
Copy the skill under Technology > Security Operations, choose Make a copy and confirm. The guided setup opens, so enter a unique name and description and continue.
Inputs and triggers let you customise some of the input fields and set how and when the skill runs.
Prompt customisation changes the output the copy produces. Test the copy on a real incident before activating it, then continue the steps in the guided setup to activate it.
Requesting summaries and closure notes from the panel
Panel requests need one of the sn_si.basic, sn_si.analyst or sn_si.manager roles. Open an assigned incident, then select the ServiceNow Otto icon. The panel offers Generate correlation insights. Check which other options your panel shows before you plan around them. To start over, select More options and choose Reset Conversation.
Summarizing an incident and drafting closure notes
Summaries need input. The fields used as input data must hold at least 50 words, so a one-line description will not produce a useful summary. Select Summarize on the Overview tab. You can then share the summary to work notes after checking and editing it, copy it, or mark it helpful or not helpful.
Closure notes are drafted when the incident moves to Closed. Leave both the Close code and Close notes fields empty, because the skill leaves either field alone if it already holds a value. In the legacy UI, the Close notes section generates text if it is empty. The context menu then offers Elaborate, which expands the selected text, and Shorten, which tightens it. In the workspace, the same options appear under Provide resolution details in the stepper.
Recommended actions and post-incident analysis
Recommended actions depend on the AI Search application. Check All > AI Search > AI Search Status, and contact support if it is not enabled. The skill works for incidents in any state other than Closed or Cancelled.
In the SIR Workspace, open Recommended Actions in the contextual sidebar, select Get recommendations and acknowledge the review modal. Cards appear with up to four references, which can be knowledge articles or other incidents. Each card offers View details, Save to work notes and a reference link. Show More lists the actions chronologically. Results stay cached for one hour, so refresh them after the incident changes. Marking an action Not Helpful opens a field for detail.
By default the card action saves to work notes. A user with sn_si.manager can change the SecOps Recommended Action property, sn_sec_ra.card_action_config, from share_to_work_notes to create_task, which turns each card into a response task.
Post-incident analysis covers root cause analysis, impact assessment, and learning and recommendations. It can be generated from the record or the workspace.
Correlation insights from the workspace
Correlation insights search on three criteria. A configuration item finds records on the same system, such as a user’s laptop. An affected user finds past incidents involving the same person, which can show repeated phishing or access attempts. An observable, such as an IP address, URL or file hash, finds records that share indicators of an attack or of reused infrastructure. Observables need an exact value, so enter a complete file hash.
In the workspace, open the Investigation tab, select one or more filters, and pick the matching items to analyse. Choose Generate Insights. A resizable dialog shows the results, grouped by record type: security incidents (SIR), incidents (INC), change requests (CHG), problems (PRB) and vulnerable items (VIT). Affected user matches return SIR, INC and CHG records. Configuration item matches return SIR, INC, CHG, PRB and VIT records. Observable matches return SIR records.
Results depend on access. The user needs read access to the configuration item, incident, change request, problem, vulnerable item and observable tables. Vulnerable items also need the Vulnerability Response application and the sn_vul.read_all role.
From version 3.0.0, the agent asks which configuration item or affected user to correlate, drawn from the related lists. Earlier versions used the primary item on the incident. Each entry shows its time range and last-generated date. Change the range to regenerate that entry.
In the panel, a filter appears only when it matches other security incidents. If nothing appears, add the value to the incident, save, reset the conversation and try again.
Changing the correlation lookback period
Correlation searches look back 30 days by default. A user with sn_si.manager can open sys_properties.LIST, find sn_sec_gen_ai.correlation_lookback_period, enter a value up to 360, save and refresh the incident. Stored observable insights keep their original period until you regenerate them.
Limits, data handling and review
The AI limits are stated plainly. Output may not always be accurate, complete or appropriate, so test the application for accuracy and harm, keep a human reviewing output, and do not rely solely on generated results for decisions. Analysts should review output before acting on it, particularly for security decisions.
Data moves from the customer instance to a central ServiceNow environment, which can sit in another region and can involve a third-party cloud provider. ServiceNow uses inputs, outputs and edits, plus data from incidents, changes, problems and vulnerable items, to improve its technologies. Data sharing can be opted out of in AI Admin Hub, for each instance. In domain-separated instances, summaries draw only on the user’s domain, data stays on the instance, and shared services do not persist prompts or responses.
Some AI features are unavailable in FedRAMP, NSC DOD IL5 and Australia IRAP-Protected data centres, in self-hosted installs and in some regions, and some skills are not available in Regulated Markets. Check availability before rollout.
Frequently asked questions
Why does the correlation insights option not appear?
The skill is on by default, so check that it is still active under Admin > AI Admin Hub > AI Skills, Technology > Security Operations, and that the analyst holds sn_si.basic, sn_si.analyst or sn_si.manager. For the panel, the ServiceNow Otto panel must also be activated.
Why will a summary not generate?
The input fields need at least 50 words in total. Add detail to the incident and try again.
Why were the closure notes not filled in?
Either the Close code or the Close notes field already had a value. Clear both before closing.
Why are no recommended actions shown?
AI Search must be enabled, and the incident must not be Closed or Cancelled.
Can the correlation search cover a longer period?
Yes. A user with sn_si.manager can set the lookback period to a value up to 360 and then regenerate the insights.