Use the Hardware Asset Workspace to set a model’s lifecycle phase, receive devices into a stockroom, put them away, and send defective stock for repair. Start with the model or stockroom involved, choose the action that matches the physical work, and check the saved record afterward. For internal lifecycles, define the model’s phase and start date rather than recording an individual device movement.
Choose the right starting point in the ServiceNow Hardware Asset Workspace
A model lifecycle decision and a stockroom transaction answer different questions. An internal lifecycle describes an organization’s timing for a hardware or consumable model. Receiving records equipment arriving at a stockroom. Put away tracks movement from the receiving area to its storage position. Repair work addresses defective equipment already held in stock.
Before changing records, write down the result you need: a model phase with a start date, a received device, a storage location, or a completed repair. This helps avoid treating a successful save as proof that the physical work is finished. The steps below describe the Brazil release of the Hardware Asset Workspace. The inventory report steps match the Australia release as well. Check labels and available actions on your instance and release.
If this work is part of a wider platform rollout, review our ServiceNow implementation services before setting the sequence.
If you are still defining the wider process, use the plain-language hardware asset management guide to frame the work before assigning workspace tasks.
Create an internal lifecycle for the correct model
Use an internal lifecycle when your organization needs to specify its own lifecycle dates for a hardware or consumable model. This can provide organization-specific timing or override existing Content Library data. Each custom record represents one lifecycle phase with a manually entered phase start date. The procedure requires the asset role.
- Open Workspaces, then Hardware Asset Workspace, then Model management.
- For hardware, select Hardware models and open the intended model record. For consumables, use Consumable models and open the relevant record.
- Open Hardware Model Lifecycles or Consumable Model Lifecycles, according to the record type.
- Select New, enter the lifecycle information, including the intended phase and its start date, and select Save.
- Check the model’s lifecycle related list for the new record. Confirm that Source is Internal.
Before saving, verify that the model represents the product population covered by the decision. Check whether the date applies to that model across the organization or reflects a local stockroom event. Receiving a shipment is a different action; it does not establish the organization’s lifecycle plan.
For a proposed retirement phase, agree the intended start date with the decision owner before entering it. After saving, compare the stored phase and date with that decision. The hardware asset lifecycle guide covers the broader planning context when the issue extends beyond creating this record.
Receive one device without losing its source workflow
For single-device receiving, the required role is inventory_user or asset. Navigate through Inventory, All stockrooms, and the destination stockroom, then select Receive assets. Search using the asset tag or serial number. Compare the returned record with the equipment in front of you before selecting it.
If the asset exists, select it and use Receive. For the described workflow, the asset moves from In transit to In stock, its stockroom is updated, and the associated source receiving task closes. Check those outcomes against the actual delivery rather than relying on the search result alone.
If the search finds no record, Create asset opens the creation dialog. Model and Model Category are required. Identification requirements depend on the category and associated identification rules; a Computer requires a serial number. Confirm the device identity before creating a record to reduce the risk of recording the same equipment twice.
Source type and Source ticket deserve particular attention. Providing them links the new asset to its originating workflow and enables the associated Receive task to close automatically. Without them, the asset can still be created, but the source task needs manual closure. The new record is created In stock and Available.
For purchase-order receiving, do not plan to receive the same asset again through the purchase order’s Receive task after creating it here. Resolve that handoff before submitting the form. The stockroom receiving guide helps connect this workspace action with the receiving process around it.
Select inbound shipments when the delivery already has records
Use View all inbound assets from the Receive assets dialog when you need to inspect equipment on its way to the selected stockroom. This route also requires inventory_user or asset. It provides shipment details such as model category, quantity, asset identifiers, tracking number, and source workflow.
The described inbound route requires assets with serial numbers and asset tags, an In-transit state, and a linked shipment record. Select the relevant shipment assets and choose Receive after checking the physical delivery against the listed quantities. Consumables must be received in their complete shipment quantity through this procedure.
For valid records, receiving changes assets to In stock and Available, updates the stockroom, marks associated shipment tasks Delivered, and closes source receiving tasks. An invalid record produces an Alert that needs resolution before receiving. For a discrepancy, pause the affected selection and investigate the identifier or quantity rather than treating the entire delivery as accepted.
Separate bulk import validation from receiving
Bulk receiving uses an Excel template and requires ham_admin. From the destination stockroom, open Import receiving log and download the template. Prepare the file with identifiers, model details, quantities, and applicable source information. Hardware quantity should be one; consumable quantity should represent the amount being received.
For consumables, Source type and Source ticket are required to identify the correct asset. Template source codes include TOL for a transfer order line, POL for a purchase order line, and RMAL for an RMA. Check the template’s expected values rather than copying labels from the single-asset creation dialog.
- Name the import record, attach the completed template, and select Import.
- Wait for the Import asset data rows to appear, then inspect Status and Alert for the intended rows.
- Review Ready to receive rows against the delivery. Treat Receive error (Asset not found) as a separate decision: valid details can create new asset records when received.
- For Import error rows, correct the template data and create a new import record with the corrected file.
- Select the appropriate validated rows and choose Receive. Check the resulting assets and source tasks afterward.
Importing a spreadsheet is not the receiving action. Duplicate serial numbers or an invalid hardware quantity can block rows during validation. Child assets and asset bundles are excluded from this bulk route. An asset whose model differs from its purchase-order line also fails the stated receiving conditions. Review the precise Alert before changing data or repeating physical work.
Finish storage and repair work after arrival
Put away needs explicit enablement for the stockroom. Open the stockroom’s Stockroom Details form, select Warehouse tasks required, and save. The same setting also enables the pick task. Review open tasks, specify the destination aisle-space, and close the task after the equipment reaches that position. The workspace also supports manually creating a put away task for In stock assets.
Before closing the task, compare the recorded drop-off location with the actual shelf or space before closure. Receiving answers whether the asset arrived; put away records where it was placed within the stockroom.
For defective stock, the Repair flow starts with an asset manager requesting repair. A technician troubleshoots, repairs, and evaluates the asset, which is then returned to use or disposed of. Repair tasks associated with the repair order lines need completion before the order is fulfilled. Check the evaluated outcome before regarding the equipment as usable stock.
Inventory reports support the next allocation decision. Inventory availability helps assess replacement options; Supply vs Demand compares stockroom supply with demand; Open demands helps identify stock for outstanding sourcing requests. Use the report that matches the question, then inspect the relevant records before committing equipment to a request.
Frequently asked questions
Which role should a receiving operator have?
The Brazil single-asset and inbound-shipment procedures specify inventory_user or asset. Bulk template receiving specifies ham_admin, while internal lifecycle creation requires asset. Match access to the actual task. If the expected action is missing, compare the user’s role and instance configuration before changing the operating procedure.
Why did a bulk row say Receive error?
For the specific Asset not found status, valid details can be used to create an asset during receiving. That differs from Import error, which requires correcting the template and importing a new record. Read the full Alert before deciding which action fits.
What should a team verify before adopting these steps?
Walk one representative model decision and one stockroom receipt through a controlled review. Check permissions, identifiers, source links, saved results, and the storage handoff. If actions or fields differ, review the hardware asset management setup and configuration before making these steps part of the team’s working procedure.