OBLYTECH Logo
OBLYTECH Logo

Pre-Built Topics in ITSM Virtual Agent

A Virtual Agent conversation only helps a user when it finishes the task they came for. Pre-built topics give you a starting conversation for IT support, and topic blocks supply reusable steps inside it. To use them, choose the required task, check its integrations and permissions, duplicate read-only content only where required, connect block inputs and outputs, and test successful and unsuccessful outcomes.

Choose ServiceNow pre-built Virtual Agent topics by outcome

Start with a task a user can finish, such as resetting a Citrix session, updating an assigned task, or getting help with a printer. Write the expected result before selecting content. A conversation that provides instructions needs different acceptance evidence from one that changes a group membership or stops a virtual machine.

Separate complete topics from supporting blocks in your work list. IT Issues topics cover troubleshooting scenarios, including email, hardware, meeting rooms, printers, and VPN connectivity. Fulfiller topics cover work such as creating problems and resolving incidents. Reusable blocks perform narrower functions, including checking agent availability, searching knowledge, and tracking deflections.

The steps here use Brazil behavior, including legacy NLU blocks; check availability and labels on your instance and release. Decide whether your work concerns NLU conversations or LLM templates before editing. For the broader transition decision, use the guide to LLM topic discovery and NLU migration.

  1. Name the requested action and the intended user.
  2. List the information the conversation needs to collect.
  3. Identify the record, external operation, or answer that proves completion.
  4. Specify what should happen when the task cannot complete.

Check prerequisites before changing conversation logic

Check the dependencies for the selected topic rather than treating the library as one installation package. Citrix session topics require Citrix IT Service Management Connector. Microsoft Active Directory group topics require Microsoft AD spoke for Integration Hub, while Microsoft Office 365 Group topics require Microsoft Azure AD spoke.

Permissions also depend on the action. Create Change Request, Create Problem, Resolve Incident, and Update Assigned Task are fulfiller topics for users with the itil role. For Resolve Incident, the conversation collects a close code and resolution notes. Test that action with a fulfiller account rather than assuming an employee account has equivalent access.

For the CAI virtual machine topics, describing, starting, stopping, and terminating a machine require sn_managevm_va.cai_vm_user. Those AWS and Azure CAI operations do not require Cloud Provisioning and Governance. Manage Virtual Machine and Provision Virtual Machine do require that plugin. Keep these two routes separate in your dependency checklist.

Prepare a test identity for the intended action and another identity that should lack permission. Record the expected difference before running either conversation. The companion guide to Virtual Agent security and access design helps structure that review.

Duplicate content in the scope its logic expects

Pre-built topic blocks can be duplicated and the duplicates modified in Virtual Agent Designer. Inputs pass from the calling topic into the block; outputs return from the block to the caller. Treat those connections as part of the customization, alongside the words users see.

Duplicated default topic blocks do not receive upgrades applied to the originals. Keep a record of the original block, the reason for the duplicate, and the changes made. During an upgrade review, compare the behavior you retained with the current default before deciding what to carry forward.

Some pre-built ITSM topics are read-only. Manage Virtual Machine is one of them, so duplicate it rather than edit it. Check the name and read-only status of each pre-built LLM topic on your instance before you rename a copy. Active Directory and Office 365 topic duplication also needs care: copying those topics into another scope can affect script logic and cause errors.

Manage Virtual Machine has its own requirement: duplicate the read-only topic in the Virtual Machine Management for Virtual Agent scope and activate the copy. Make scope a recorded build decision rather than a detail someone must reconstruct during troubleshooting.

When the selected conversation crosses identity, cloud operations, and incident handling, define that scope before customization expands. Use ServiceNow implementation support to plan the conversation, dependencies, access tests, and ownership as one delivery package.

Wire reusable blocks around explicit decisions

For a handoff branch, Agent Availability returns agentAvailable, supportQueue, and waitingTime. It requires Agent Chat, which includes Advanced Work Assignment. Design the calling conversation to handle unavailable agents and missing queue information: supportQueue can be null when no agent is available or no queue is associated, and waitingTime can be null when an agent is unavailable.

For knowledge answers, FAQ Conversation Builder accepts query, portal, and kb_knowledge inputs. Its Results_Returned and Results_Helpful outputs answer different questions: whether the search found anything and whether the user found it helpful. Build separate follow-up decisions for those outcomes rather than treating a returned result as a resolved issue.

For Run AI Search, leaving Search Application Configuration empty in Topic Block Properties uses the default Virtual Agent configuration. Its outputs include genius_results, search_results, and search_metadata. Decide which returned information the caller needs before connecting later steps. In Collaboration Applications troubleshooting, the sn_itsm_va.fallback_search_option property determines whether the fallback uses AI search or Contextual search.

For deflection tracking, map Deflection Configuration, Deflection Pattern, Activity Table, and Activity Ids to the intended activity. Activity Ids can also include output from AI Search or Contextual Search to associate contributing content with a deflection occurrence. For the wider setup sequence, see pre-built topic setup and deflection planning.

Review the caller’s next question after each block returns. For example, when FAQ results exist but are unhelpful, ask the tester to follow the unresolved route and record what happens. When agent availability is false, inspect the alternative conversation path. Define these expected outcomes in the build notes before changing prompts, so wording adjustments do not conceal missing decisions.

Separate CAI actions from provisioned VM topics

Virtual machine conversations follow more than one integration path. Brazil documentation describes CAI topics for AWS and Azure actions, and a separate group of topics that requires Cloud Provisioning and Governance. The CAI path uses the sn_managevm_va.cai_vm_user role; describing, starting, stopping, and terminating an assigned virtual machine do not require Cloud Provisioning and Governance. Manage Virtual Machine and Provision Virtual Machine use that plugin, so verify the path before treating the plugin list as one shared prerequisite.

Manage Virtual Machine combines the describe, start, stop, and terminate operations into an end-to-end topic. It is read-only. To use its flow, duplicate it into the Virtual Machine Management for Virtual Agent scope and activate the copy. By contrast, a Provision Virtual Machine conversation sends the user to the Cloud User Portal to submit the catalog item, or can show catalog items assigned to that user. Keep these distinct from the CAI topics that act on existing assigned machines.

For a termination scenario, the conversation presents machine details and asks for confirmation because the operation is permanent. For a start or stop scenario, test the actionable notification and the resulting machine state. Include the selected machine and the expected action in the test record so that a successful message is tied to the intended resource.

Connect reusable blocks to the next decision

A reusable block receives inputs from the calling topic and returns outputs to it. Check both sides of that connection: an input can point at the wrong record or context, while an output can be ignored by a later branch. A duplicated block also does not receive upgrades applied to the original, so keep its purpose and changes visible during upgrade review.

For a live-agent handoff, the Agent Availability block returns whether an agent is available, the support queue, and the wait time. Its documented dependencies include Agent Chat and Advanced Work Assignment. Make the caller handle unavailable agents and empty values rather than assuming every query returns a queue and wait time. For knowledge search, distinguish whether results were returned from whether the user found them helpful; those are separate outputs and can lead to different follow-up steps.

For a collaboration troubleshooting fallback, the issue is passed into the troubleshooting block and a search phrase is returned for the next step. In the documented configuration, sn_itsm_va.fallback_search_option determines whether the fallback uses AI Search or Contextual Search. Confirm which release’s block details apply, then test both the useful-answer route and the unresolved route. A block result is only useful when the calling topic responds to it.

Test the actual task rather than the opening exchange

Use topic-specific scenarios. Reset Citrix Sessions offers available sessions and lets the user reset one session or all sessions. If none are available, it can open an incident. Test an individual selection, an all-session selection, and the no-session route, then inspect the resulting action rather than stopping at a reassuring chat message.

For Office 365, distinguish ownership changes from membership changes. Group Owners can add owners; group owners can add users. Members can retrieve group details. Users can remove themselves from a group, while group owners can remove other users. Test those cases with the corresponding identities and inspect the resulting group state.

For Active Directory, Create AD Distribution Group collects a group name, description, and optional members, and adds the current user as group owner. Add User to AD Group lets group owners add themselves or other users. Prepare an unambiguous group name and sample membership changes for testing. Compare the membership before and after the conversation, including a self-removal test, so the acceptance record shows the exact change.

For VM termination, the CAI conversation displays machine details and requests confirmation because termination is permanent. Use an approved disposable test resource and verify the selected machine carefully. For start and stop operations, check the actionable notification for success or failure as well as the machine’s resulting state.

Record the starting conditions, identity, supplied inputs, branch taken, final result, and any unexpected behavior. Keep defects specific enough to reproduce: a missing session, wrong group, denied action, and failed external operation need different investigations. The Virtual Agent testing and acceptance checklist provides a place to organize that evidence.