OBLYTECH Logo
OBLYTECH Logo

ArcSight ESM Event Ingestion Setup

To set up the ServiceNow ArcSight ESM integration, configure the ArcSight source, create an event profile, select correlation events, map their values to security incident fields, preview the result, and define ingestion scheduling. This workflow creates Security Incident Response incidents from correlation events, with filtering and aggregation configured in the profile.

Plan the ServiceNow ArcSight ESM integration around incident outcomes

Start with a specific correlation event type and the incident your security team needs to investigate. Write down the ArcSight Manager source, Query Viewer Resource ID, expected event values, and required incident fields. Use that small test scope to check the complete path before adding more profiles.

The setup below follows Brazil behavior; check labels and available options against your instance and release. Although this page sits within the event management area, the destination records in this integration are SIR security incidents. For the wider operations context, see the ServiceNow Event Management overview.

Use a user with sn_si.admin for application configuration, profile creation, preview, scheduling, copying profiles, and changing integration settings. The mapping procedure lists admin, sn_si.admin as required roles. Configuring the MID Server Application requires the system administrator role. Assign the work accordingly before a configuration session.

Connect the ArcSight Manager source

Install the ArcSight ESM application before configuring the integration. Then navigate to Integrations > Integrations Configurations and locate the ArcSight ESM tile. Select New to create a configuration, or Configure when that control is displayed for an existing configuration.

  1. Enter a unique Name that distinguishes the Manager source. Spaces are supported; parentheses are not.
  2. Set ArcSight API Endpoint URL to the Manager endpoint, including its API port. Check that this is the intended Manager before supplying account details.
  3. Enter API Account User Name and API Password using the API account created in the ArcSight ESM Manager console.
  4. For a cloud deployment with direct Internet access, leave On Premises Deployment cleared. For an on-premises deployment, select it and specify the MID Server Application.
  5. Select Submit. After validation and submission, the server configuration appears as a tile. If saved tiles are hidden, set Show Configurations to Yes.

When a MID Server Application is needed, the system administrator navigates to Mid Server > Applications and selects New. Name the application, select a default MID Server, clear Included in application ALL, and select Save. Select Edit, move available MID Servers into the MID Servers List, and save the membership.

The application groups the MID Servers available to this integration. The configured ArcSight source can support multiple profiles, provided those profiles ingest unique correlation event types. Keep source connectivity checks separate from decisions about which events should become incidents.

Create an inactive profile and validate its Query Viewer

With sn_si.admin, navigate to ArcSight ESM Integration > ArcSight ESM Event Profile and select New. Give the profile a unique Name. Duplicate names produce an error and are not saved. Choose a name that helps the next administrator identify the event scope.

Leave Active cleared while completing configuration. An inactive profile does not ingest events. Select the required ArcSight Source, then enter the Query Viewer Resource ID in Query Viewer ID. If several Manager sources exist, check the source and Resource ID together.

Order defaults to 100. When multiple profiles share triggering conditions, the lower number gives the workflow higher execution priority. Add an optional Description to explain the intended event scope and ownership. Avoid using execution order to compensate for unclear profile boundaries.

Select Continue to validate Query Viewer ID. A matching Resource ID returns the Query Viewer name. Compare that name with the intended viewer. If validation fails, check the Resource ID in the ArcSight console and correct the profile. Then select the correlation event types for ingestion from that viewer.

Map sample values and control incident creation

Open Mapping on the progress bar. The mapping experience supports up to five sample correlation events. Choose Retrieve most recent correlation events or Select correlation events based on event ID, then use Retrieve Events. The samples appear as tabs with source field names and values.

Drag a blue source field name into Input Expression beside its destination in the Security Incident column. The Correlation Event Sample Ingestion side supplies values; SIR Incident Field Mapping defines where they go. Add destination fields with the plus icon and select the required field from the choice list.

Review mappings against several samples rather than accepting one populated incident view. A field that makes sense for one event may contain a different value in another sample. The aim is a readable incident that preserves the information an analyst needs to understand the correlation event.

Under Incident Generation Conditions, enable Filter based on conditions when incident creation needs additional criteria. Available source fields depend on the ingested samples. Filter values are case-sensitive and must match the ArcSight event values exactly. Use AND when all conditions must match, or OR when either condition may match.

Under Event Aggregation Criteria, enable Aggregation conditions and move matching fields from Available to Selected. Incoming events must match all selected values to join the most recently opened matching security incident. For fields with multiple mapped values, a partial match does not satisfy aggregation; a new incident is created.

Decide which differences deserve separate investigations before selecting aggregation fields. In practice, a long list of fields tends to make matching harder, while a thin list can combine events an analyst would assess separately. Test those choices with representative samples. Broader operations filtering is covered in the ServiceNow event rules guide.

For help planning this work, see ServiceNow implementation.

Preview first, then choose the ingestion schedule

With sn_si.admin, select Preview and choose an item from Sample Event IDs. Review the mapped fields in the read-only security incident view. Return to Mapping to correct missing or incorrect values, then preview again. A successful preview is required before moving to scheduling.

On Scheduling, choose the intended retrieval pattern. Ongoing Event Ingestion pulls new correlation events on a recurring interval. The default is five minutes, and the interval can be reduced to one minute. Balance the need for recent events against polling overhead on the ArcSight server.

One-Time Retrieval uses Since date to retrieve historical correlation events through the current date. It supports a lookback of up to seven days and is intended for a limited set of in-flight events rather than archival ingestion. After that retrieval, the profile does not continue pulling new events.

For a deliberate start time, use Set initial correlated event ingestion time and review Initial event ingestion time and Next event ingestion time (estimated). Set Increment (Minutes) to the required interval. Select Continue to reach Additional Options, and complete the profile before activating it.

Keep the initial acceptance check concrete: the intended event passes the filter, the incident fields contain the expected values, and aggregation handles a matching follow-up event as designed. Record those observations alongside the profile name. Use the Event Management troubleshooting guide for adjacent operational investigation work.

Questions about ArcSight profile administration

Does a preview create a real security incident?

No. Previewed security incidents are not saved as actual SIR incidents. Use the preview to inspect mapping results without treating the displayed record as proof that scheduled ingestion has created an incident.

What does copying a profile retain?

A copied profile retains the original configuration, including mappings and scheduling. Its name includes copy, and Active is false. With sn_si.admin, select the original in ArcSight Profiles and choose Copy from Actions on selected rows. Review the copied settings before activation.

Which incident fields support multiple mapped values?

Observable, Configuration Item, and Work notes support multiple values. Mapping two values to a field that does not support them produces a preview error stating that there is no value for the field. A choice value absent from the destination field’s choices does not populate that field.

Where are daily ingestion controls changed?

With sn_si.admin, navigate to ArcSight ESM Integration > ArcSight ESM Integration Settings. These settings include the default daily number of security incidents that can be created and aggregated, and the flow time period. Review the displayed configuration before changing it.

Which subflows help distinguish connection and retrieval problems?

In Flow Designer > Designer, open SubFlows. Connection and credential validation checks connectivity and credentials; Query Viewer ID Validation checks the viewer; Get Sample Event fetches mapping samples. Retrieve Correlated Events Based on Polling Schedule handles scheduled retrieval. Use the failing stage to narrow the investigation.