OBLYTECH Logo
OBLYTECH Logo

Alert Grouping Rules in Event Management

When one fault produces a stream of alerts, ServiceNow alert grouping brings related ones together using shared tags, CI relationships, learned patterns, or configured matching fields. To attach a predefined tag, open an alert clustering definition, add the tag in its association section, confirm the selection, and save. Then validate group membership against the operational relationship you intended.

Choose the evidence behind ServiceNow alert grouping

Start with the reason two alerts belong together. A shared characteristic points toward tag-based grouping. A relationship between configuration items points toward CMDB grouping. Recurring combinations in historical alerts point toward automated grouping. The scheduled grouping configuration also supports matching field values. These mechanisms answer different questions, so choose a test case before changing settings.

Write a short acceptance statement: “These alerts should belong together because they share the selected characteristic.” Add a contrasting case that should remain separate. For example, a proposed grouping boundary might distinguish two data centers even when both report similar symptoms. Treat that as a test design, then compare the actual alert data with the proposed boundary.

The procedures below use Brazil behavior; check the configuration and available labels on your instance and release. Keep the scope narrow enough to explain an unexpected member. When the requirement is to define a specific correlation rule, use the separate guide to alert correlation rules alongside your grouping decision.

Attach a predefined tag to the selected definition

Attaching a predefined alert clustering tag requires the evt_mgmt_admin role. The Tag Based Alert Clustering Engine application supplies predefined tags. Associating one with a tag-based alert clustering definition establishes the characteristics used for correlation. Before editing, record which definition you intend to change and why that tag describes the alerts in your test.

  1. Navigate to All > Event Management > Tag Based Alert Clustering Engine > Alert Clustering Definitions.
  2. Select the definition that matches your intended grouping task.
  3. In Tag Based Alert Clustering Definitions Tags M2M, select Insert a new row.
  4. Search for the predefined alert clustering tag. Confirm the selected tag with the green check mark.
  5. Select Save to retain the association.

Recognize predefined tags by the phrase “out of the box” in their description. Read the description before selecting a result with a familiar name. A recognizable label is insufficient evidence that the tag represents your intended scope. After saving, reopen the definition and verify that the intended association remains present.

For tag-based grouping, create a grouping automation in Service Operations Workspace. Keep that requirement in the change plan as well as the definition edit. The immediate result of the procedure above is the saved tag association; assess resulting group membership separately.

Set scheduled grouping properties deliberately

Configuring scheduled job-based alert grouping requires evt_mgmt_admin. Open All > Event Management > Administration > Alert Correlation Properties. The scheduled job Service Analytics: Group Alerts Using RCA/Alert Aggregation supports the grouping process. Enable the properties relevant to your chosen method and select Save.

The available switches include Enable CMDB correlation, Enable Network Traffic correlation, Enable ML based Automation correlation, and Enable Text based correlation. Record their previous values before making a change. Avoid enabling several methods simply to obtain a group: a successful test should also establish why the resulting members were related.

The Group by property, sa_analytics.agg.group_alert_with_same_group_by_fields, accepts a comma-separated list. Matching values can come from alert fields such as assignment_group, CI fields such as alert_cmdb_ci.location, additional information such as additional_info.state, or alert tags such as t_data_center. Choose fields whose values you can inspect in the test alerts.

Before adopting a matching field, compare its populated values across related and unrelated examples. A broad value may satisfy your written condition while creating an operationally unhelpful group. If the difficulty is deciding what an operator should do after grouping, review the operator triage workflow before broadening the condition.

Control the relationship boundary for CMDB groups

CMDB based alert grouping uses current relationships between CIs. Its groups appear in Express List within Service Operations Workspace. Start your review with the CIs associated with the alerts, then inspect the relationships that connect them. Judge the proposed group against that topology rather than assuming matching descriptions imply a dependency.

The property sa_analytics.agg.query_cmdb_correlation_enabled enables CMDB correlation. The property sa_analytics.agg.query_cmdb_graph_walk_nodes controls the maximum number of enabled relations between CIs in the topology used for a group. Values greater than four may negatively affect aggregation job performance. Increasing the relationship reach should therefore have a stated operational reason.

The property evt_mgmt.related_cis_get_all_relation_types determines whether grouping uses all relationship types. Setting it to false allows relationship filtering. Suggested relationships are held in CMDB Group CI Relations [em_suggested_relation_type]; hosting and containment rules also participate in the filtering configuration. Review these settings together before concluding that an unexpected boundary is caused by the tag definition.

At this point, a change may involve tag selection, topology, matching fields, and operator acceptance. If those decisions need a coordinated design, discuss the scope through ServiceNow implementation services. Bring the sample alerts, proposed boundary, and rejected examples so the discussion starts with testable requirements.

Check learned patterns and network prerequisites

Configuring pattern based alert grouping requires evt_mgmt_admin. Enable Enable alert aggregation for Automated, CMDB, and Text-based groups through sa_analytics.aggregation_enabled and Enable ML based Automation correlation through sa_analytics.specific_patterns_enabled. Disabling the aggregation property disables the other groups, so include its current value in your diagnostic notes.

The Service Analytics Alert Aggregation Learner – Daily job processes past alerts to identify patterns. It also tracks manual additions and removals from automated alert groups and can learn patterns from manually formed groups. Include operator changes in the investigation when a learned grouping outcome differs from your original expectation.

Network traffic grouping has a separate prerequisite: Service Mapping Plus [sn_sm_scoped_app] must be installed. Enabling this method requires evt_mgmt_admin and selection of Enable Network Traffic correlation on Alert Correlation Properties. On Brazil, new customers start with this method enabled; existing customers select the property manually. Do not treat a tag association as evidence that this prerequisite or setting has been satisfied.

Disabling network traffic-based grouping also requires evt_mgmt_admin. Clear Enable Network Traffic correlation and set sa_analytics.enable_process_mapping_calculation to false. Record both changes when that is the intended scope, then compare subsequent observations with your baseline.

For CMDB investigations, Event Management retains related-CI maps in Event Management CI Graph Reuse [em_ci_graph_reuse]. The property sa_analytics.agg.query_cmdb_graph_reuse_period controls the storage period, with a default of 86,400 seconds. Record the configured period when reviewing topology changes so the investigation includes how relationship maps are retained.

Validate membership before accepting the change

Use a written review sequence: confirm the saved association, inspect the relevant grouping properties, compare the resulting members with the intended relationship, and examine the contrasting case. Record the actual result even when it differs from the expected one. A smaller alert list alone does not establish that a grouping boundary is correct.

Automated and CMDB groups can be reviewed in Express List within Service Operations Workspace. Use working with alert groups in Express List when handing the review to operators. Ask them whether the members support one investigation or mix unrelated work.

Keep a brief change record with the definition, tag, property values, example alerts, observed membership, and acceptance decision. Separate configuration evidence from the team’s judgment about the result. For follow-on response design, move to alert management rules after the grouping behavior is understood.

Questions about grouping edge cases

Can alerts without a CI join learned or text-based groups?

Set sa_analytics.enable_no_ci_grouping to true for Text-based or ML based grouping without a CI. The Feature Identifier must include both the node and metric name. Include a no-CI example in the review when this behavior is required.

Where can the reason for a group appear?

By default, a work note in the Activities tab explains the grouping reason when a group is created or updated. Setting evt_mgmt.alert_groups_reasoning.enable_worknotes to none prevents those reasoning work notes from being displayed.

How much history should the learner process?

The sa_analytics.agg.learner_period_days property controls the historical processing period. Values above 30 days increase processing time; use 30 days or less for performance. Define the property if it is absent before setting its value.

Does domain separation affect learned patterns?

With Domain Support – Domain Extensions Installer activated, sa_analytics.agg.learner_domain_level determines the domain level used for aggregation patterns. Its default is two. Include the relevant domain boundary when investigating a pattern that differs between organizational areas.