OBLYTECH Logo
OBLYTECH Logo

Linking Alerts to Incidents in Event Management

To attach alerts to an existing incident, select them in Express List, use the alert action that links them to an incident, enter the incident number, and confirm the update. Check that the selected alerts match the scope you wrote down before you confirm.

Start with the incident and the alert scope

Begin with a specific question: which alerts describe the disruption being handled by this incident? A group is evidence to inspect, rather than a substitute for that decision. Separate the reason alerts were correlated from the operational reason you want an incident team to investigate them together.

Link View displays relationships among alert attributes. Colored tags represent configuration items, or CIs, and other environment items associated with alerts. The graph gives you context for selecting alerts; the incident action performs the association.

The steps below follow the Brazil release of Express List. Control names can differ on your instance, so check them before acting. For orientation before selecting a group, see working with Express List alert groups.

As an operating check, establish the intended incident number, the disruption it covers, and the alerts you plan to include. Note any uncertainty. For example, an alert sharing an application tag may deserve investigation without proving that it belongs to the same failure.

Inspect the group in Express List before linking alerts

Viewing group relationships requires evt_mgmt_operator or evt_mgmt_admin. Follow this sequence to reach the selected group’s relationship view:

  1. Navigate to Workspaces > Service Operations Workspace.
  2. Select the Express List icon in the primary navigation.
  3. In the interactive filter panel, select Group and choose the check boxes for the alert groups to display.
  4. In Active alerts, select the description of the group you want to inspect.
  5. Use the Alerts in group tab in the preview panel to review the correlated alerts.
  6. Navigate to Link View to inspect their relationships.

Keep the selection narrow enough to explain. Start with the CI or shared attribute that appears relevant to the incident, hover over its node, and examine the connected attributes. The tooltip can identify the tag name, class, severity, and the number of alerts in which the tag appears. It can also identify primary, secondary, or probable-cause information where applicable.

Use the legend to interpret colors and symbols, then hide tag types that distract from the relationship you are investigating. Dragging nodes can make a crowded area easier to inspect. Treat that rearrangement as an aid to reading the graph, rather than evidence of a different relationship.

Brazil supports Link View for network traffic-based, rules-based, and mixed alert groups. Mixed groups can include CMDB-based groups, tag clusters, related log entities, and shared impacted services. Network traffic groups are created from traffic connections between processes on hosts. The legend also shows the number of unique nodes displayed per tag.

Read the links according to the group type

A line needs context. In the general Link View legend, a solid line means the attributes share one or more alerts, while a dotted line represents correlation through grouping criteria. Examine the group type before translating that connection into an incident explanation.

Rules-based groups

A rules-based group contains a primary alert and secondary alerts. Link View represents the primary alert as the Home node. Dashed connections to secondary alert nodes show correlation through rule criteria, rather than a shared alert. Solid connections indicate that the connected nodes share one or more alerts.

For the handoff, describe the rule-based relationship without calling it a proven causal chain. If the grouping itself looks questionable, review the reasoning behind your alert correlation rules before expanding the incident’s scope.

CMDB-based groups

CMDB-based groups correlate alerts on CIs close to one another in the CMDB topology within a time frame. In the displayed example, a dashed connection labeled 2 means two intervening CIs separate the endpoints in the service map. The number describes topology separation, rather than an incident count.

Use that distinction when explaining a relationship to a responder. State which CIs connect through the topology and which part of that relationship you still need to investigate. Physical proximity on the screen is not a reason to treat two nodes as directly connected.

Tag-based and mixed groups

Tag-based correlation can use one tag or a combination of two tags. The defining tag is marked Correlation in the legend. A dashed connection in a group generated from tag rules represents an approximate match, so similar attribute values may explain why alerts were grouped.

Mixed groups combine grouping strategies. These can include tag clusters, CMDB-based groups, related log entities, and shared impacted services. Read the correlation source and attributes together. When you pass the investigation to another team, name the connection you observed instead of describing the entire graph as a single dependency map.

Attach selected alerts to an incident

To attach alerts to an existing incident, select them in Express List, use the alert action that links them to an incident, enter the incident number, and confirm the update. Check that the selected alerts match the scope you wrote down before you confirm.

Before committing a wider selection, compare the alerts with the scope you established earlier. Include the relevant symptom and the relationship observed in the incident handoff.

Consider an investigation where an application alert and an infrastructure alert share a grouping attribute. Ask whether both describe the incident’s reported symptom, whether the relationship explains their inclusion, and whether any contradictory evidence needs review. If the application alert fits but the infrastructure alert remains ambiguous, document the ambiguity before broadening the selection. This is a decision checkpoint for the operator, rather than a reason to assume that group membership settles incident ownership. The handoff should make the unresolved question visible to the next responder.

For help planning this work, see ServiceNow implementation.

Verify the investigation before handing it over

Revisit the relationship evidence when new alert data becomes available. Link View does not refresh automatically. Refresh is enabled when the group has new data, and selecting it returns rearranged nodes to their original positions. Newly added nodes carry a New marker.

After refreshing, inspect the relevant area again and decide whether the new evidence changes your reasoning. A node changing position after refresh does not establish that the underlying incident has changed.

Where an alert on a CI impacts a service in the CMDB, Link View displays the impacted service. Include that service context in the handoff alongside the observed alert relationships. Use the operator triage workflow to keep this investigation connected to the wider response process.

A concise handoff should distinguish observation from judgment. Write down what the graph showed, why you selected the alerts, and what the incident owner should verify next. Avoid turning a probable-cause indicator into a statement that a root cause has been established.

Questions about alert evidence and incident decisions

A numbered badge counts alerts that share a key-value pair

It indicates that the same key-value pair appears in multiple alerts. A badge showing 2 means that pair occurs in two alerts. A node without a badge appears in one alert only.

A Change badge marks a probable cause, not a confirmed one

It marks an active change request that is a probable cause of the alert. Treat it as a lead for the investigation. In your handoff, distinguish the displayed change relationship from your assessment of whether that change caused the disruption.

A tag-based group can be correlated without its defining tag showing

Yes. A tag-based group can be correlated through information that Link View does not represent, such as the description. An absent defining tag does not by itself explain away the grouping; examine the correlation basis before changing your interpretation.

Link View works before the CMDB is populated

Yes. Link View can display relationship information without a populated CMDB. With a populated CMDB, it adds context about probable cause and the service the group impacts. Keep your explanation within the evidence actually available for the selected group.

Create a new incident only when the group needs its own investigation

In Express List, an evt_mgmt_operator or evt_mgmt_admin can select the alert’s check box, open Alert actions, then choose Create Incident under Response actions. The incident is created from that alert, and Express List confirms creation. The evt_mgmt_user role is view-only and cannot run this action. Use this route only when the alert needs a new investigation; it is distinct from attaching selected alerts to an existing incident.