OBLYTECH Logo
OBLYTECH Logo

IBM QRadar Offense Ingestion

A ServiceNow IBM QRadar integration ingests selected offenses into Security Incident Response through configured sources, profiles, rules, and field mappings. For domain-separated deployments, create profiles with a dedicated administrator in each domain, then run replicated ingestion jobs as that domain’s user. Validate sample data, incident creation, and integration runs before expanding ingestion.

Prepare the ServiceNow IBM QRadar integration connection

Start with the connection and the tenant boundary together. A successful connection establishes access to QRadar; your acceptance checks should also establish which domain receives the resulting work. These steps follow the Brazil release, so check the labels and settings on your instance before changing production configuration.

With the sn_si.admin role, install the IBM QRadar application if needed, then open Integrations > Integrations Configurations. Locate the IBM QRadar tile and select New. Use Configure when editing a configuration. In Offense Ingestions Configuration, enter a recognizable Name without parentheses.

  • Set IBM QRadar API Base URL to the host and port. Port 443 does not need an explicit port value.
  • Set IBM QRadar Dashboard URL to the dashboard host without the console page suffix. If unavailable, use the API base address.
  • Choose a supported IBM QRadar API Version; version 10 and above are supported.
  • For an on-premises authorized service token, provide Offenses, Log Activity, and Network Activity roles with an unrestricted user security profile. Check token expiry.
  • For QRoC, generate the token through the self service application using the admin user role and admin security profile.

Enable On Premises Deployment when applicable and supply MID Application Name. Configuring the MID Server Application requires the system administrator role. For QRoC, clear On Premises Deployment. Select Submit after entering the connection details. If saved tiles are hidden, change Show Configurations to Yes. Place this connection within your wider Security Operations integration plan so ownership is clear.

Establish the domain before creating profiles

IBM QRadar offense ingestion supports domain separation at the Basic level. Its runtime separation covers the user interface, cache keys, reporting, rollups, and aggregations. The instance owner must set up the application for multiple tenants. Treat correct domain placement as an acceptance requirement alongside correct incident data.

  1. Create a specific user with sn_si.admin in the domain that will own the profile.
  2. Use the domain picker to select that domain when creating the profile. Do not create the user in a parent domain and later move the profile’s domain.
  3. Use that domain’s dedicated sn_si.admin user to create or modify the profile settings.
  4. Disable the existing scheduled jobs. Replicate IBM QRadar Process Polling Queue, IBM QRadar Process Profiles, and Offense Updates for each domain.
  5. For each replicated job, change Run as from the system user to the domain’s sn_si.admin user, then run the job.

Keep a review record matching each domain to its user, profile, and replicated jobs. This is a recommended deployment check: it makes a misplaced execution identity easier to spot before you investigate mapping or connectivity. Test the tenant boundary with representative users as well as the administrator configuring ingestion.

When connection design, For help planning this work, see ServiceNow implementation.

Select the source and rules deliberately

To create a profile, use sn_si.admin and open IBM QRadar Integration > IBM QRadar Profile, then select New. Give the profile a unique Name and select the required Source. Active is cleared by default; complete the profile sections before activating it. Order determines execution priority when profiles share triggering conditions, with lower numbers taking priority.

For rule selection, sn_si.admin is also required. In the IBM QRadar Rules List field, open the list of active rules and move the required rules into Selected. The profile ingests offenses triggered by one or more selected rules. Select Continue to proceed. Record why each chosen rule belongs in the profile instead of selecting rules merely because they are available.

A modified QRadar System rule can produce an Override rule with the same name. When both active rules appear, select both to ingest their offenses. This check matters when a seemingly correct name selection fails to cover the intended detection. Use the broader SIEM event ingestion guidance for SIR when deciding which ingestion requirements belong in this profile.

Prove the mapping with representative offenses

Sample ingestion requires sn_si.admin. Select Mapping on the progress bar if the mapping form is not displayed. In Ingestion Preference, choose Retrieve most recent offenses to fetch the three latest offenses for selected rules, or Select offenses based on offenses ID to specify up to three comma-separated IDs. Select Fetch Sample Data and allow the asynchronous retrieval to finish.

Choose samples that expose the fields your analysts need. Event, Flow, and Common rules can yield different sample content. The displayed event or flow fields come from the first event or flow that triggered the offense. For additional custom data, select Fetch additional event and flow fields (Optional), enter active, valid field names separated by commas, and fetch the sample again.

Mapping also requires sn_si.admin. Drag a field from Sample Offenses into Input Expression beside its destination in SIR Incident Field Mapping. Blue fields remain unmapped; gray fields have been used. A gray source field can still be mapped to another destination when that is intentional. Use the plus icon to add a destination row and the minus icon to remove one.

Check field compatibility before accepting the preview. Observable, Configuration Item, and Work notes support multiple values, while base Category and user fields do not. For multivalued offense fields mapped beyond CI and Observable types, create suitable List fields; non-reference List fields are supported by default. An incompatible choice value can leave its destination empty. Record expected values for your samples and compare them with the incident preview.

Separate filtering from offense aggregation

Incident Generation Conditions controls which offenses create incidents. Enable Filter based on conditions and build the criteria from available sample fields. Match capitalization exactly because criteria are case-sensitive. Use contains for array-valued fields such as users, categories, remote_destination_ips, and rules_contributing_to_offense. AND requires the combined conditions to match; OR allows either condition to match.

Offense Aggregation Criteria serves a different purpose: appending related offenses to an existing incident. Enable Aggregation Conditions and move the matching incident fields from Available to Selected. All selected values must match, including multiple mapped values. A partial match creates a new incident. A complete match adds the offense to the most recently opened incident with those matching values.

Test a matching offense, a partial match, and an offense excluded by filtering. Write down the expected result before running each case. An analyst with sn_si.analyst can review aggregated offenses in the incident’s related list. If hidden, select Show All Related Lists under Related Links. Keep these test outcomes in your Security Operations implementation acceptance checks.

Trace ingestion through jobs and integration runs

The processing stages have separate schedules. Process Profiles from Scheduled Job and Queue Offenses runs every minute and pulls according to each profile’s polling interval. Process Polling Queue and Poll in Batches runs every 30 seconds. IBM QRadar Offense status updates runs every minute when updating offenses after incident creation or closure. Distinguish these stages when investigating delays.

Start troubleshooting with the integration run. Users with sn_si.analyst can inspect errors in sn_event_ingestion_integration_run. Runs show logs, warnings, offenses pulled, and incidents created; worknotes link to executed subflows. Check profile state, last pulled date, offense import records, and offense-to-task records before changing configuration. For on-premises connections, verify that the configuration names the MID Server Application rather than an individual MID Server.

Answers on copying profiles and fixing incomplete ingestion

Does copying a profile activate its ingestion?

No. With sn_si.admin, Copy creates a disabled profile containing the original mapping and scheduling configuration. Review and rename the copy, complete its configuration, and then activate it. A copied profile’s initial name includes copy.

What changes when a copied profile uses another source?

Select new rules when changing the source. If you retain the source but choose new rules, the sample offenses are cleared. Plan to fetch suitable samples before accepting the revised mapping.

Why does a completed-looking profile remain unfinished?

In Additional Options, under Automate offense updates and closure based on SIR incident status, select Finish. This moves the profile to Waiting, indicating that it is waiting for ingestion.

What should be checked when events, flows, or users are missing?

Review sn_sec_qradar.sid_ttl. Increasing its timeout allows AQL parsing more time, while delaying incident creation. Make the change against a specific missing-data test so the tradeoff is visible.

Can offense updates increase ingestion delays?

Yes. If sn_sec_qradar.get_offense_updates is enabled and incident creation is delayed, disable it. Avoid enabling it with a low polling interval and high QRadar offense load because it increases queue load.