Retiring equipment in ServiceNow requires permission to release it and evidence of its disposal. An enterprise disposal order tracks verification, pickup, departure, vendor confirmation, and documentation. As a process recommendation, obtain authorization before collection. In Disposal Documentation, attach the evidence and use Dispose to retire selected assets; complete the remaining task fields before closure.
Define the scope of asset disposal in ServiceNow
Start with the assets and the reason for retirement. Equipment that no longer works and equipment that has reached the end of its life cycle can enter a disposal process. A refresh, a return, and a disposal are different decisions: replacing a device does not by itself establish that the old device should leave the organization permanently.
The detailed workspace sequence below covers enterprise disposal orders. These orders accept assets associated with enterprise or pallet models, including simple assets, multi-component assets, and pallets with children. Do not assume that a hardware asset is eligible for this order type merely because it needs disposal. Check the application, model association, and workflow on your instance and release before using these steps.
For the wider relationship between employee requests, returns, and retirement, see hardware requests, RMA, and disposal. Keep the requester’s reason separate from the operational evidence that the selected assets have actually left and been disposed of.
Set approval responsibilities before arranging collection
Design the approval decision around an identified asset list. A request such as “dispose of the equipment in storage” leaves the approver unable to judge what is being released. As a process recommendation, collect the asset identifiers, disposal reason, responsible owner, proposed vendor, and any restrictions that could prevent collection.
The enterprise disposal stages are Draft, Scheduling, Transit, Confirmation, Documentation, and Completed, with Cancelled representing a canceled order. Approval is not a separately named stage in that sequence. Decide how your organization’s authorization will be recorded and checked within its configured process; do not interpret completion of an operational task as an approval decision.
- Identify who can authorize removal from the organization and what evidence that person needs.
- Resolve ownership, retention, and handling questions before releasing the equipment.
- Define what should happen if the approved asset list changes before verification is closed.
- Keep the release decision available to the people arranging and performing pickup.
Use Flow Designer to create the enterprise disposal flow. As a process design recommendation, specify where authorization is recorded, who checks it, and what happens if permission is withheld. Give the approver the selected asset list and ask for a decision on that list. If the list changes, agree who must review the change before collection proceeds. Keep these approval decisions distinct from the vendor, pickup date, and pickup contact fields used to arrange disposal. For help planning this work, see ServiceNow implementation.
Create the order and reconcile the asset list
Creating an enterprise disposal order requires sn_eam.enterprise_admin or sn_eam.enterprise_asset_manager. Open Enterprise Asset Workspace > Inventory > Disposal orders and select New. Complete the order details before selecting Save, which creates the order and triggers its workflow.
- Choose the Stockroom from which the assets will be disposed. Location fills from the stockroom; review both together if either needs changing.
- Use Assigned to to identify the person responsible for disposal, and enter the intended Vendor.
- Complete Pickup Details, including Scheduled date, Pickup contact name, Pickup details, and Additional info as appropriate.
- Open Disposable Assets, select Add, choose the assets, and select Add again.
- Open the Verify Assets task under Enterprise Disposal Tasks and compare the selected records with the equipment being prepared.
The asset selection list contains assets in non-terminal states, meaning states that permit a further transition. If an expected item is missing, check its record and model eligibility before changing anything. A state change made just to make an item appear can conceal the reason it was excluded.
Select the relevant assets and choose Verify. This sets their state to In stock and substate to Pending disposal. Close the verification task after the list is correct. Additional assets cannot be added to the order after Verify Assets has been completed and closed, so reconcile omissions before crossing that point.
Stockroom identity also matters when equipment has been moved before pickup. Use stockroom management and hardware receiving to reconcile those inventory movements and resolve location mismatches before disposal.
Track collection without closing disposal prematurely
Task closure moves the enterprise order through its stages and generates the next task. In Schedule pickup, enter Vendor and Scheduled date, then close the task. The order moves into Transit and the Asset departure task becomes available. Review authorization and the agreed collection list before the physical handover.
In Asset departure, complete Vendor order ID and Pickup contact name. Select the assets being handed over and choose Depart through Actions on selected rows. Departure moves the asset state to in transit with the pending disposal substate. Close the task when departure work is complete.
Vendor confirmation and disposal documentation still follow departure. The Dispose action in the documentation task changes selected assets to Retired/Disposed.
Closing Asset departure advances the order to Confirmation and creates Vendor confirmation. Complete that task before proceeding to Documentation. As an operational check, reconcile the pickup evidence and any exceptions against the intended asset list before accepting the vendor’s confirmation.
If a task will not progress, investigate the task that is currently open and the assets associated with it. For broader diagnostic work, see troubleshooting hardware asset management.
Attach evidence and complete the asset records
The Disposal Documentation task records the final evidence and disposition. Use the Attach File icon to attach the disposal documentation for the planned assets. As a closure check, compare the assets identified in that evidence with the records selected for Dispose. If an asset is missing from the evidence, resolve the discrepancy before selecting it for disposal. Keep a note of which assets require follow-up and who will obtain the missing information. This review is a process recommendation: attaching a file and checking its contents are separate pieces of work. The final selection also needs to include any children being disposed of, as explained below.
Select the assets and choose Dispose. The asset state changes to retired and its substate to disposed. Set Certificate of disposal to Yes and close the task. When the disposal tasks are complete, the enterprise disposal order reaches Completed.
Multi-component assets and pallets need particular attention here. Earlier in the process, changes to a parent apply to its children. At Disposal Documentation, that automatic propagation no longer applies. Select each parent and child asset that needs disposal individually; selecting a parent is insufficient to carry its children through this final action.
For a closure review, compare three lists: the verified assets, the departed assets, and the assets covered by disposal evidence. Investigate differences instead of clearing remaining work merely to finish the order. Keep the vendor reference and documentation associated with the disposal process so that a later reviewer can trace the disposition.
Use mobile verification for the physical handover
Mobile verification and departure require sn_eam.enterprise_admin or sn_eam.enterprise_asset_manager and an existing enterprise disposal order. In Mobile Agent, open Enterprise Asset and then Asset disposal. The Verifications and Departures tabs expose the corresponding open tasks.
For verification, open the task, use Scan, and scan an asset tag or enter it in Asset Tag. Review the collected items in Review before choosing Submit. Expected, Verified, and Not verified then update. Choose Complete after checking the result.
Departure uses the same scan-and-review approach, with Expected, Departed, and Not departed showing progress. Record Pickup contact name before completing the departure task. Mobile completion covers these physical checks; the remaining disposal order tasks still need completion on the instance.
Questions about disposal exceptions and related records
Can an enterprise disposal order be canceled after vendor confirmation?
An order in Confirmation cannot be canceled. Address withdrawal decisions before the transit boundary. For tasks in draft, scheduling, or transit, the cancellation procedure uses Closed Incomplete in State followed by task closure; distinguish that task outcome from successfully finishing disposal.
Does marking consumables for disposal retire them?
No. With asset, itil, or itil_admin, use Mark for disposal on an eligible In stock consumable to prepare it for a hardware disposal order. Entering a partial quantity creates a separate consumable record with the pending disposal substate. Planning makes the quantity available for disposal; it does not complete disposal.
Why has Mark for disposal disappeared from a consumable?
The action appears for In stock consumables that have not been marked for disposal. It disappears after marking. Check Planned for disposal and whether the record is already associated with disposal work before treating the missing action as a permissions fault.
Can disposal closure replace a review of configuration records?
If your disposal process includes a configuration review, give that work an owner and agree what must be checked before it is signed off. Use the distinction between hardware asset management and the CMDB to frame that discussion. This is a process recommendation; assess the configuration work against its own completion criteria alongside the disposal checks.