A ServiceNow stockroom pick task organizes the retrieval of an asset for fulfillment. Enable Warehouse tasks required on the stockroom, open its pick task list, then work the assigned task in Mobile Agent. Check the asset and pick location, collect the hardware, provide its asset tag, and close the task when picking is complete.
Choose the workspace and stockroom before changing settings
Start with the stockroom that will supply the equipment. Enterprise Asset Workspace supports enabling the Asset pick task for Standard Enterprise Asset requests, Enterprise Asset Refresh requests, and the Sourcing workflow. Hardware Asset Workspace provides the corresponding setting for Standard Hardware Asset requests, Hardware Asset Refresh requests, and the Sourcing workflow.
As a suggested acceptance check, test enterprise and hardware fulfillment separately. Each route connects its own request workflows to picking work. An enterprise test alone does not demonstrate the hardware route. Choose equipment and a stockroom that reflect the team’s actual fulfillment work, then follow the matching workspace procedure. Keep the request type with the test observations so that a reviewer can distinguish the two routes.
For enabling the setting and viewing open tasks in either workspace, the required role is inventory_user. The hardware mobile start-work and locate-and-pick actions described below also require inventory_user. Check access for the person performing each action before asking them to carry out the test.
If the broader operating process still needs definition, use hardware stockroom operations to frame the receiving, storage, and fulfillment responsibilities around this picking procedure.
Enable the ServiceNow stockroom pick task
For the enterprise asset route, go to Workspaces > Enterprise Asset Workspace > Inventory. Select All stockrooms, then open the stockroom that should use warehouse tasks. On Stockroom Details, select Warehouse tasks required and select Save.
For hardware fulfillment, use the same stockroom-level sequence through Workspaces > Hardware Asset Workspace > Inventory:
- Select the All stockrooms tab.
- Open the stockroom that will supply the hardware.
- On Stockroom Details, select Warehouse tasks required.
- Select Save.
This setting adds the Asset pick task automatically to the applicable request and sourcing workflows. On the enterprise route, the stockroom setting enables both Asset pick and Asset put away tasks. The hardware enablement procedure covers the Asset pick task. As an operating check, treat the selected stockroom as part of your test evidence: record its name alongside the request you use. That gives the person reviewing the result a concrete starting point if the expected task is missing.
Before extending the change to additional stockrooms, consider walking through one representative fulfillment with the people who will pick the hardware. Decide who checks the task, who handles exceptions, and where collected equipment should wait. For help planning this work, see ServiceNow implementation.
Open the stockroom queue and identify work that needs action
To view enterprise asset work, return to Workspaces > Enterprise Asset Workspace > Inventory, choose All stockrooms, and select the stockroom. Under Open stockroom tasks, the Open pick tasks card shows the number of open pick tasks. Select that card to display the stockroom’s open asset pick task list.
For hardware work, follow Workspaces > Hardware Asset Workspace > Inventory, select All stockrooms, and open the stockroom. Select its Open pick tasks card in Open stockroom tasks. This opens the list of open hardware asset pick tasks for that stockroom.
As a suggested operating check, use this view before sending a picker to the shelves. Compare the stockroom under review with the fulfillment you are testing. If the expected work is absent, collect the request reference, stockroom name, and current configuration for investigation. Avoid changing several settings at once, because that makes the cause harder to isolate.
Receiving questions belong earlier in the physical process. If equipment has not reached its intended storage position, resolve that handoff with the team responsible for hardware receiving and stockroom management before treating the issue as a picking problem.
Start the assigned hardware task in Mobile Agent
Launch Mobile Agent on the mobile device and tap My Tasks on the bottom navigation bar. The initial screen displays the first few assigned tasks. If the required task is not displayed, tap See all before concluding that it is missing.
Open the relevant Asset pick task. On its Details tab, review these three fields together:
- Asset identifies the item to collect.
- Stockroom identifies the stockroom supplying it.
- Pick location identifies its aisle and space.
As an operating practice, use those details to prepare the physical trip. For example, if the task names equipment in a different stockroom from the one you expected, pause and reconcile the request with the stockroom team. Do not substitute a nearby item simply because it appears suitable; first establish which asset the fulfillment should use.
When ready to begin, tap Start work on Details. The link changes to Start timer, Locate, and Scan asset. That visible change provides a checkpoint that you have started the selected task before moving on to navigation or scanning.
Locate the asset, scan it, and complete the pick
For map-based hardware picking, explicitly install Indoor Mapping for Assets (com.sn_ima) from the ServiceNow Store before beginning. Installing it also installs Indoor Mapping (sn_map_core) and Indoor Mapping component (sn_map_component). Include this dependency in the readiness check for a team planning to use indoor directions.
Open the task you have started and tap Locate on Details. The map displays the hardware asset’s location and offers Get directions. Tap that option, choose the starting location on the map, and tap Save. The map then shows the path and approximate travel time. Use View steps if you want to inspect the route.
After reaching the location and collecting the hardware, complete the identification and drop-off steps:
- Tap Scan asset.
- Scan the asset tag, or manually enter its value in Asset tag.
- If appropriate, select a space within the stockroom in Drop off location.
- Select Close complete.
The Asset pick task changes to Closed complete. The asset’s Location field is updated with the drop-off location if you specified one. The Hardware Asset request flow and Hardware Refresh request flow proceed to their next stage.
As a handoff practice, agree on the drop-off space before testing with physical equipment. A picker should know where the collected asset belongs and who receives it next. Record any mismatch between the planned handoff and what happened so that the team can correct its working instructions.
Verify the handoff with a small fulfillment check
For an acceptance walkthrough, follow one asset from its assigned task to the agreed collection space. Check the selected stockroom, the asset identity, the pick location, and the task result. If a drop-off location was supplied, check the resulting asset Location as well. Keep the request reference with these observations so that reviewers can trace the same example.
Distinguish a configuration question from a physical stock discrepancy when recording exceptions. A missing expected task calls for reviewing the request and stockroom setup. An item absent from its stated shelf calls for checking the physical inventory and location information. Use the Hardware Asset Management troubleshooting guide to organize that wider investigation.
As an exception-handling practice, name a reviewer before the first live pick and tell pickers how to reach that person through the team’s existing channel. Keep the handoff specific: describe the asset or location expected, the discrepancy the picker found, and the decision needed to continue. This gives the reviewer a defined question to resolve.
Questions about picking exceptions and task visibility
Can I narrow the mobile task list by due date?
Yes. Tap the Filter icon and enter the relevant Due Date value. The filtering fields also include Asset, Location, and Priority. Choose criteria that help identify the assigned work you intend to handle.
Can I change the order of assigned tasks?
Yes. In the mobile task view, tap the Filter icon, tap Sort by, and select the fields to use for sorting. As an operating choice, agree with the stockroom lead how that order should support the day’s fulfillment priorities.
What should we record when the physical asset tag is unreadable?
As an operating practice, record the task reference and the identification problem, then ask the stockroom owner to resolve it. Avoid guessing a tag value from similar equipment. Establish the item’s identity before completing the fulfillment handoff.
What should a pilot review include besides the screen result?
Include the picker’s observations about shelf identification, route clarity, and the receiving person’s understanding of the drop-off space. These are suggested operating checks. They help reveal whether the team can repeat the handoff without relying on unwritten instructions.