ServiceNow Software Asset Management setup connects software installation records, normalized discovery models, entitlements, reconciliation, and review results. Begin with one publisher and confirm each record relationship before assessing compliance. Check which dashboard and reconciliation interface your release exposes, then note run scope and results. This sequence makes missing inventory, incomplete model data, and license findings easier to distinguish.
Choose the dashboard and confirm its availability
The Software Asset Management dashboard presents true-up costs, optimization results, and compliance trends. Its availability depends on the instance’s upgrade and activation history. In Brazil, the dashboard is no longer available to new users who activated Software Asset Management Professional or upgraded to Brazil without activating that plugin before the upgrade. An instance that activated Software Asset Management Professional before Brazil but did not activate the Workspace plugin retains access. If the Software Asset Workspace application was activated after an upgrade to Zurich, the dashboard may be reached through Dashboards rather than the Software Asset navigation menu.
For the dashboard route, open Software Asset > Overview and select Software Asset Management from the dashboard list. The dashboard includes Overview, Optimization, and Compliance Analysis information. On the Overview tab, Publishers out of Compliance counts publishers with at least one software model out of compliance; Products out of Compliance counts products meeting the same condition. Selecting either report opens its filtered records. Other overview measures include Total True-up Cost, Potential Savings, Top 10 Products by True-up Cost, and Top 10 Products by Potential Savings.
The dashboard’s overview data comes from Product Result [samp_product_result]. The Optimization tab uses Reclamation Candidate [samp_sw_reclamation_candidate]. Compliance Analysis presents time-series trends based on Product Result data. A dashboard chart can be refreshed individually; results update daily or when a new reconciliation result becomes available. Charts can also be saved as PNG or JPG files. When a chart is shared outside the workspace, retain its date and review scope so that a later reader can tell what run and filter it represents.
Do not treat a missing dashboard menu item as proof that reconciliation is unavailable. First check activation history, upgrade path, and the interface route. If the dashboard is not available to the instance, review the reconciliation results in the workspace or classic interface instead. Keep physical asset configuration separate from software license analysis; the hardware asset management setup guide covers a different record and process area.
Build an inventory path and check migration history
Software discovery supplies installation records for normalization and reconciliation. ServiceNow Discovery can populate Software Installations [cmdb_sam_sw_install]. Microsoft SCCM and other integrated discovery sources can also provide software installation data. Using ServiceNow Discovery requires activation of the Discovery plugin. Discovery patterns identify supported applications and devices; organizations can use the included patterns or customize patterns for additional software. A source decision should name the tool, the environment it covers, and the records the team expects to see.
When an installation record is written, ServiceNow checks the combination of discovered publisher, product, and version against Discovery Model records. If that combination already exists, the installation receives a reference to the matching model. If it does not exist, a discovery model is created and linked to the installation. That relationship is a useful diagnostic checkpoint: an installation with an unexpected or missing model reference calls for a different investigation than an installation that was never collected.
For an environment using Discovery that has not used a previous version of Software Asset Management, the Migrate Software Installs script copies previously discovered records from [cmdb_software_instance] into [cmdb_sam_sw_install]. The script is available at All > Software Asset > Administration > Migrate Software Installs and requires the sam_admin role. It is not needed when a previous Software Asset Management version was used, or after the initial migration; Discovery writes new records directly to the destination table after that migration. Allow the process time to complete, and check the Software Installations list for the migrated records.
Record the migration decision before interpreting an inventory gap. A missing older installation may reflect a migration that has not occurred, a discovery source that did not collect it, or a mismatch in the discovered publisher, product, or version. Keep those possibilities separate in the review rather than changing license quantities to compensate for uncertain inventory. The hardware asset management and CMDB comparison can help frame related ownership discussions, while this review remains focused on software installations and their model references.
Review model normalization before running reconciliation
Normalization determines how a discovery model’s publisher, product, and version fields are represented for later reconciliation. A discovery model can have six normalization statuses: Normalized, Partially Normalized, Publisher Normalized, Match Not Found, Manually Normalized, and New. New means normalization has not yet run for the model. Normalized indicates a full match based on publisher, product, and version, subject to specific exceptions described by the model’s editable fields.
Partially Normalized means the publisher and product match, while the version remains editable. Publisher Normalized means the publisher field matched but product and version still need attention. With Match Not Found, the normalization process could not match any of the three key fields to a Software Library rule; the key fields can be edited, for example when an organization uses custom software. Manually Normalized means key fields were filled in by hand from an eligible prior state such as New, Match Not Found, Partially Normalized, or Publisher Normalized.
These statuses are not interchangeable completion labels. A partially normalized model can still lack version information, and a publisher-only match leaves product and version unresolved. A model with no match may require additional identification before a compliance result can be interpreted. Review the actual fields alongside the status, then identify who will resolve the remaining data. If the model is manually normalized, record which values were entered and what record or evidence supports the identification.
Normalization behavior also depends on which fields matched. A fully normalized model is based on publisher, product, and version. A partially normalized or publisher-normalized model is not necessarily updated to full version. When a model is manually normalized, the user can decide whether to normalize it to version and full version. Keep an unresolved version distinct from a confirmed version; otherwise a later comparison may appear more precise than the input supports.
Run a scoped reconciliation and examine its results
Reconciliation runs on a schedule that defaults to weekly, and it can also be started on demand for one or all publishers. It compares software installations and entitlements to calculate compliance results. In Software Asset Workspace, users with sam_user or sam_admin can run reconciliation. The task can be opened through Software Asset Workspace > Software asset overview > Run Reconciliation or Software Asset Workspace > License usage > Run Reconciliation. The classic procedure requires sam_admin and the legacy SAM module.
For a first run, select the publisher already used to validate installation and model data. You can choose all publishers, but a specific publisher narrows the run and can make results easier to investigate. Group and subgroup choices include None, Country, Department, Company, Region, and Cost Center. If domain separation is enabled, a Domain filter appears in the workspace dialog. Record the selected publisher, group, subgroup, and domain where applicable so that another reviewer can understand what the result includes.
In Workspace, select Run Reconciliation and monitor the Reconciliation tab. The result list includes a unique number, last reconciled date, status, run scope, group, subgroup, progress, and updated date. Status can be Completed, In Progress, or Failed. Progress summary describes the current process step but is not displayed as a list column by default; it can be added through list personalization. A run that is still in progress should not be compared as if it were a completed result.
Product Results summarize models and installations for a software product and publisher. They determine the product’s license compliance status and include details such as true-up cost, over-licensed amount, and potential savings. Software Model Results provide detail for each model associated with the product. License Metric Results show rights owned, rights used, and allocation breakdowns for each license metric; a model can have multiple metric results when multiple licenses were purchased. Follow the related lists from product to model to metric rather than treating the product-level status as the whole explanation.
Available remediation options depend on the product and model results. They can include Licensed Installs, Unlicensed Installs, Unlicensed Subscriptions, Unlicensed Consumptions for consumption-based models, Unlicensed Options for Oracle only, Removal Candidates, and Purchase Orders when the Procurement plugin is active. Not every option applies to every record. Assign work using the label shown on the result, the affected publisher and product, the evidence to review, and a responsible owner. For a separate purchasing workflow, use the ServiceNow purchase order guide.
For planning help, see ServiceNow implementation.
Questions about setup and review
Which role can run reconciliation in Workspace?
The workspace procedure lists sam_user or sam_admin. The classic procedure requires sam_admin. Confirm the selected interface and assigned role before scheduling the first run.
When should the migration script be run?
Run Migrate Software Installs after installing the Software Asset Management application when Discovery is in use and the environment has not used a previous Software Asset Management version. It copies records from [cmdb_software_instance] to [cmdb_sam_sw_install]. It is not required after the initial migration.
What should be checked when a model is not fully normalized?
Review its normalization status and the publisher, product, and version fields. Partially Normalized and Publisher Normalized indicate different matching levels; Match Not Found means no key field matched a Software Library rule.
Why might the Software Asset Management dashboard be missing?
Dashboard availability depends on plugin activation and upgrade history. For some Brazil instances it is no longer available to new users who activated Software Asset Management Professional or upgraded without activating it beforehand. An instance upgraded to Zurich after activating Software Asset Workspace may need to open it from Dashboards.
What does Potential Savings represent?
It is the cost saved if removal candidates are reclaimed. Review the candidate records and their state before treating the measure as actual savings.