OBLYTECH Logo
OBLYTECH Logo

Password Policy Configuration

A password policy in ServiceNow defines which passwords users can choose when changing or resetting a platform password. Configure its length, character requirements, and sequence restrictions, then verify the policy associated with the credential store. Login compliance is a separate setting that can require users with noncompliant passwords to change them.

Establish which accounts and password paths need control

Start with the accounts whose passwords are managed within the platform. Identify how those users sign in and how they replace a password. A policy record, an enabled validation property, and the policy selected for the credential store are separate parts of the configuration. Review them together before treating the work as complete.

The Password Policy plugin, com.glide.password_policy, is enabled by default. Its password checks take effect when a user changes or resets a password. That timing matters: creating stronger criteria does not, by itself, mean existing users must immediately replace their passwords. Decide separately whether to check their current passwords at the next login.

For identifier-first login, a password authentication policy routes matching users to credentials managed within the platform. Creating that routing policy requires user_authn_admin. In All > Authentication Console, use the Policies tab, select Use Password under Authentication Method, and define the matching Conditions. Active policies are evaluated in numeric Policy order, with lower values first. Under Conditions, choose a Field and Operator and enter the matching value. Combine conditions with and or or, or use Add condition set for another set. Select Active and enter Policy order before selecting Create Policy. Review this routing before choosing the local accounts for testing.

Keep the account inventory alongside the recovery design. The related password reset credential stores and enrollment guidance helps connect the selected store with the recovery route users actually follow.

Configure the ServiceNow password policy criteria

Creating a password policy through All > Password Policy > Password Policies requires password_policy_admin. Select New and enter a Name that distinguishes the intended rules. In Password Policy Criteria, choose the Password Strength Preset, then inspect the resulting values rather than approving the preset name alone.

Default Strong is the default preset. Its populated requirements include one uppercase character, one lowercase character, one numeric character, and one special character. Its minimum length is eight characters and maximum length is 100. Both sequence and repetition thresholds are initially four characters. Treat these as starting values to review against your approved requirements.

The presets differ in ways that their names do not fully explain. Default requires no special character, while Medium populates a minimum length of 12 and a maximum of 40. High populates two lowercase characters and three special characters, alongside one uppercase and one numeric character. High uses length boundaries of eight and 100, as does Default. Medium also requires one character from each of the uppercase, lowercase, numeric, and special categories. Compare the actual fields before deciding which preset fits the intended rule.

  1. Set Minimum Password Length and Maximum Password Length to the approved boundaries. These fields appear for presets other than Advanced.
  2. Review Minimum Uppercase Character(s), Minimum Lowercase Character(s), Minimum Numeric Character(s), and Minimum Special Character(s). Each count supports values from zero through 10.
  3. Decide whether Included Special Characters should restrict the allowed special-character set. Enter the characters without delimiters.
  4. Review Excluded Special Characters if that option is available, and decide whether Disallow User Data should reject authentication-related user data.
  5. Record the completed field values so testing can compare behavior with an explicit rule.

Included Special Characters narrows the special characters a password may contain; it does not set how many are required. The minimum special-character count controls that separate requirement. Excluded Special Characters instead rejects the characters entered in that field. When testing restrictions, use an otherwise acceptable password and vary the special character so the result tests the allowed set rather than a missing character category.

Custom also exposes Password Policy Script. Advanced exposes Password Rule Script and Password Strength Script. Choose a scripted approach when the requirement calls for it, and review that logic separately. Selecting Advanced changes the configuration surface; a checklist built around the standard length fields is insufficient for that preset.

Test sequences, repetitions, and boundary values

Sequence Length Threshold and Repetition Length Threshold address predictable patterns within a password. They are separate from minimum length and character counts. A candidate can satisfy the length requirement and include several character types while still containing a sequential or repeated pattern that the policy rejects.

Both thresholds support a maximum of eight characters. Choose them deliberately and test them independently. For example, prepare a candidate that meets the character counts but contains a predictable sequence, then another with a repeated character run. Use invented test strings rather than a person’s current password, and avoid saving real credentials in change records.

In the Test Your Password section, enter a candidate and select Test Your Password. Test before selecting Submit. Build a small acceptance set with passwords immediately below the minimum length, at the minimum, and above the maximum. Add separate failures for missing character categories and restricted characters so one failing rule does not conceal another.

After saving, repeat representative checks through the intended user workflow. The form test shows how the candidate compares with the configured criteria; workflow testing checks whether that configuration is being used where users change credentials. Record both the rejected candidate category and the accepted control case, without retaining sensitive password values.

Connect the policy to reset and administrative paths

To change the policy associated with a credential store, navigate to All > Password Reset > Credentials Stores, select the relevant credentials, and change Password policy to the intended policy. Compare that selection with the record you tested. A correct policy sitting beside the wrong store selection can leave a misleading configuration review.

Check glide.enable.password_policy in System Properties [sys_properties]. Its default value is true, and it enables password validation for user-interface password changes. If the property is missing, add the record as required for the configuration. Treat a change carefully: the password reset policy check setting is identified as a safe harbor property whose changed value cannot be reverted.

This property does not apply when an administrator changes a password or adds a user through script. Separately, glide.validate.sys_user.password.field enables policy validation when an administrator edits the user password through the sys_user form or list view. Review the actual administrative route rather than assuming the user change form covers it.

For the surrounding user-facing credential work, see ServiceNow Password Manager. A successful self-service reset should not stand in for an untested administrative operation.

Include the support handoff in the review. Write down which team owns the policy record, who can maintain credential store selections, and how a failed acceptance check is escalated.

Plan login enforcement before enabling it

The property glide.apply.password_policy.on_login controls whether existing passwords are checked against current requirements at login. Its default and fallback values are false. Setting it to true requires users whose existing passwords fail the current policy to change them during their next login. This can affect a substantial group at once.

Choose the final criteria before enabling that transition. Test a compliant local account and a noncompliant local account, and verify that the latter can complete the required password change. Make sure the support team can distinguish an expected compliance prompt from a failed reset or an incorrectly selected authentication route.

Earlier Security Center advice favored leaving composition checks off at login. That advice was revised in Security Center 1.5 and removed in Security Center 2.0. The current recommended value for glide.apply.password_policy.on_login is true. The false default does not represent that recommendation: it leaves login compliance enforcement off. Plan the transition and recovery checks described above before enabling it.

Schedule the change with recovery support available and capture the test outcomes. For help planning this work, see ServiceNow implementation. For controls governing the surrounding access flow, review Zero Trust access and session activation.

Questions about policy administration and diagnosis

Can an administrator start from Admin Center?

Yes. This route requires admin. Navigate to All > Service Operations Workspace > Overview. In Admin Center, open the Service Desk Assisted Password Reset card through Overview or Configurations. On the Password policies card, select Configure, then New. Complete the fields and select Submit.

How are specifically prohibited passwords handled?

The glide.enable.blacklist_password property enables rejection of specific passwords held in the Excluded Password table. Its default value is true. Consider that control alongside the composition criteria when investigating why a candidate that meets the visible length and character requirements is still rejected.

Which property helps investigate validation behavior?

glide.password_policy.debug enables password policy debug logging. Use a controlled diagnostic window and synthetic test credentials when investigating a discrepancy. Record which workflow produced the result so the investigation stays tied to the path under review.

Why might the special-character option need closer inspection?

For Excluded Special Characters to appear, glide.password_policy.use_excluded_special_char must be enabled. A similarly named property, glide.password_policy.user_excluded_special_char, also concerns access to this option. Inspect the property records and visible form together before changing either name; test the exclusion behavior rather than treating the names as interchangeable.