OBLYTECH Logo
OBLYTECH Logo

Password manager feature for storing and reusing credentials

ServiceNow handles user passwords through the Password Reset application. It lets end users reset or change a password, with or without a service desk agent. It connects to a credential store holding user names and passwords, checks identity through verification methods, and pairs with a Password Change flow for people who know their password.

How a reset process is put together

A Password Reset process has four parts: a connection to the credential store that holds user names and passwords, the user groups allowed to use it, an identification type (usually a user name or an email address), and one or more verifications that confirm the person asking is the account holder.

Settle these four before opening any form, because each one constrains the others. Strong verifications do not make up for a store that cannot enforce the password rules you expect.

Where credentials are held: the credential store

A credential store is where user names and passwords live. Each store is built on a store type, a template that supplies a fixed set of capabilities. The Local ServiceNow Instance sample is the starting point for credentials held on the instance. Active Directory is another supported option with its own rules. The Hostname field holds the URL or IP address of the store server.

A credential alias can carry several child connections, so one process can reach more than one directory server. The User account lookup field names a script include that maps the ServiceNow user to the account ID in the store. The default script, PwdDefaultUserAccountLookup, returns the ServiceNow user name.

Setting up the store connection step by step

A store connection can be created by a user with the password_reset_admin or password_reset_credential_manager role. Go to All > Password Reset > Credential Stores, select the Local ServiceNow Instance sample, enter a unique name and description, complete the Password Reset Credential Store form, and submit it.

If you select Enforce history policy on a local instance store, the Auto-generate password value must comply with the password policy, so enable password policies on the instance. Then run the connection test.

The history check box is offered for Active Directory and local instance store types, and ticking it sets no limit by itself. Add a password_history_limit parameter in the Password Reset Credential Store Parameters list. Its maximum is 10, and the default of 0 lets a user reuse any earlier password. The Password rule hint tells users the requirements, and the Password rule script enforces them.

Configuring the reset process itself

Create the process at All > Password Reset > Processes. Choose the credential store, then tick the Password reset check box, the Password change check box, or both.

Public access sets the audience. Selected, it creates a self-service process with its own URL. Cleared, it creates a service desk-assisted process in which agents reset passwords at a user’s request.

Setting What it controls
Display CAPTCHA Shows a challenge on the identification page. Google reCAPTCHA is the default. On-premises instances that cannot reach it set a system property to false.
Identification type Overrides the default identification for a public process. The base system includes Email and Username types.
Minimum verifications How many verifications a user must pass. Mandatory verifications must be completed regardless of this number.
Allow user to choose from optional verifications Lets the user pick which optional verifications to complete, up to the minimum.
Email/SMS Password Reset URL Sends a reset link by email, the secured method, and also by SMS to mobile devices. Turning it on removes the auto-generate option.
Redirect URL Where the user goes after a successful reset.

Apply to all users applies the process to everyone. When it is cleared, the Groups related list defines who may use it. The Active check box appears after the first save, and that is what switches the process on.

The Process Strength Configuration section shows a security score from 0 to 100, shown red from 0 to 40, orange from 40 to 75, and green from 76 to 100. A weekly job can email the score and recommendations to the process owners, if the security score notification option is selected on the process.

The verification methods users pass through

The base system includes these verification methods.

Method How it works
Question and answer The user picks questions at enrollment and answers the set posed at reset time.
Email code A six-digit code that expires after 10 minutes. A new code can be requested after two minutes, up to 10 per user per day.
SMS code A six-digit code that expires after five minutes. A new code can be requested after two minutes, up to 10 per device per day.
Authenticator app A code from Google Authenticator, Microsoft Authenticator or Cisco Duo on a paired device. The enrollment page also lists Okta Verify.
Soft PIN A six-digit number the user chooses. By default, repetition and sequence thresholds are two, and the previous five PINs cannot be reused. The administrator’s configuration can change these rules.
Personal data Questions generated from the user record. No enrollment is needed.

The choice is a trade-off. A question-and-answer check needs no phone or inbox, which helps someone who has lost a device. Code-based checks typically resist guessing well but fail once the user loses that channel. Offering two types covers a user who loses one. A process cannot rely on question and answer alone, and it cannot use only personal data and question and answer together. Add another verification, or switch on the reset link option.

Enrolling users before a reset

Users enroll at All > Password Reset > Enroll, where each verification has its own tab and no role is needed. Email enrollment adds an address, verifies it with a code, and authorizes it for resets. SMS enrollment adds a device, verifies it, and ticks Authorized for each device used for resets. Authenticator enrollment scans a QR code, enters the generated code and selects Pair Device.

Enrollment can be automatic. Each base-system verification type offers automatic enrollment. External users (the snc_external role) cannot enroll manually, so they rely on personal data, email or SMS verification with automatic enrollment, provided their email address or phone number is on their user record.

Changing a password a user already knows

The Password Change application covers users who know their current password. The user opens All > Password Reset > Change Password, or follows the link on their user profile. The user selects the Password Reset process tied to the store, enters the old password and then the new one. The password rule script checks the new password when the user submits it. Where Enable Password Strength is selected, which is the default for local ServiceNow stores, a strength bar under the New password field rates it. After the user retypes it in the Retype password field, the workflows validate the old password before the new one takes effect.

Service desk assisted resets and blocked users

In a service desk-assisted process, agents holding the password_reset_service_desk role reset passwords. Agents go to All > Password Reset > Service Desk, select the user and process, choose Verify Identity, and enter the answers the user gives. The Reset Password form then offers a Reset password button, and for a locked account an option to clear the lockout.

A user can be blocked after a manual ban, after exceeding the failed-attempt limit, after requesting a reset before the wait time has passed, or after giving incorrect verification details. Blocked users are listed at Password Reset > Blocked Users. A self-service reset clears the block automatically. A service desk reset does not, so an administrator sets Blocked from true to false by hand.

Resetting a password from the Windows login screen

The Password Reset Windows Application helps a user who forgets a Windows password or is locked out of the computer. An administrator installs it with an EXE or MSI file, which places a Forgot Password link on the login screen. On Windows 8.1, 10 and 11, the link opens a pop-up.

The user identifies themselves, completes one configured verification, and then sets a new password. The application does not support custom verifications, uses the base-system CAPTCHA even where the web form uses Google reCAPTCHA, and shows no password strength indicator. Changing an Active Directory password from this route needs the Password Reset Windows App plugin and the Microsoft AD for Password Reset store app.

Extending the application

When no built-in type fits, Password Reset scripts can extend the application. A user with the password_reset_credential_manager role can create a credential store type under All > Password Reset > Extensions > Credential Store Types. The type carries subflows for password change, clearing a lockout, reading the lock state, testing the connection and resetting the password. Workflows are deprecated, so keep the Use Flow check box selected.

Frequently asked questions

Does ServiceNow have a password manager feature?

Stored user passwords are handled by the Password Reset application. It keeps user names and passwords in a credential store and lets people reset or change them, self-service or with a service desk agent.

Who needs a role to set up Password Reset?

Creating a process requires the password_reset_admin role. Store connections can be created by password_reset_admin or password_reset_credential_manager. Agents who run service desk-assisted resets need password_reset_service_desk. Users enrolling need no role.

Can a user reset a password without a phone or an email address?

Question and answer verification needs neither, but a process cannot rest on it alone. Pair it with another method, or switch on the reset link option.

Why does a user stay blocked after a service desk reset?

A service desk reset does not clear the block. An administrator sets Blocked from true to false in the Blocked Users list.