The ServiceNow Vault console is the dashboard where administrators check how well sensitive data is protected on an instance. It gathers metrics from each Vault tool, offers guided setup for applications and lists default policies that can be switched on. The console shows protection status and metrics, and it also starts setup from the same page: guided setup for an application and Activate on a tool card apply protections. Detailed settings stay on each tool’s own page. For the wider concept of a data policy, see the data policy explainer.
What the console shows on its home page
The top of the home page carries an Insights section. It is an AI-generated summary of discovery, classification and protection metrics, and it suggests one next step for each area. Insights needs the ServiceNow Otto for Vault application, and the section stays hidden while that application is inactive. It arrived with the Brazil release as an early availability feature.
Below it sit an overview block with a short video, a resources area and an FAQ area, an assistant panel, and guided setup cards, one per application. In the Brazil release the assistant panel is called Ask Now Assist. It can schedule a data discovery job when asked, once the relevant skills are enabled in the AI Admin Hub console. Selecting Get Started on a card starts guided setup for that application.
The tools section covers seven tools: Data Discovery, Data Classification, Data anonymization, Cloud Encryption with Key Management, Field Encryption, Log Export Service (LES) and Zero Trust Access (ZTA). Each has a short description, licensing information, a Go to button and a metrics dropdown with charts. The dashboard leaves metric definitions to each tool’s home page, which the Go to button opens.
Opening the console and who can use it
Open the console from All > Vault > Vault Console. Without elevation to sn_vault_console.vault_console_admin, the dashboard is read-only. For broader setup guidance, see instance security and access control best practices.
| Role | What it allows |
|---|---|
| sn_vault_console.vault_console_admin | Dashboard access, guided setup, and read-only views of all tool charts and protection configurations. It combines the Data Classification admin, Data Privacy admin and CA admin roles. |
| sn_vault_console.vault_console_auditor | Read-only review of classification and protection policies, without changes. |
| security_admin | High-security settings, the access control list, and field encryption configurations on the Protect existing data screen. |
| ca_admin | Continuous Authentication policies, CA properties and CA dashboards. |
| data_privacy_processor | Creating, reading, updating and deleting user-based jobs. |
Version 2.2.9 of the console app (August 2026) removed security_admin from the roles needed to elevate to and administer the console, and moved viewing tool metrics across the dashboard to the admin role. The aim was least privilege, so administrators elevate to the roles they need and no more.
Security admin sits outside the admin role. An administrator grants it through standard user administration, because it is absent from the elevate list. In the Brazil release, the Access Observer and Field Encryption agentic workflows need it. Grant it to a console admin, who then elevates to it before running those workflows. In the same release, both the admin and auditor roles include access_analyzer_ai_user, which AI agents need to call the Access Analyzer API. Field Encryption roles such as sn_kmf.admin are assigned separately. For the wider concept, see access control lists.
Installing the console and Vault Suite
A new instance opens the console in preview-only mode. Installing the Vault console application from the ServiceNow Store or from Application Manager turns on full functionality, and the install needs the admin role. Data Discovery is then available by default, and other tools need their own setup. To grant access, open the user record under All > User Administration > Users, edit the Roles related list, add sn_vault_console.vault_console_admin and save.
Vault Suite installs ServiceNow Vault and its premium plugins in one step, from All > Application Manager > Vault Suite. It needs a ServiceNow Vault entitlement. Without one, the plugins stay inactive and the tool cards show as inactive. If Vault is already installed, Vault Suite adds the remaining plugins and leaves the existing configuration in place. For the wider concept of credentials, see connection and credential aliases.
| Plugin | Vault Suite, Australia | Vault Suite, Brazil |
|---|---|---|
| Vault Console | Included | Included |
| Data Privacy | Included | Included |
| Log Export Service | Included | Included |
| Zero Trust Access | Included | Included |
| Field Encryption | Included | Included |
| Code Signing | Included | Not included |
In the Brazil release, an entitled instance also shows a ServiceNow Vault tile on Admin Home. Selecting Start new setup opens the product hub page, where Install starts Vault Suite. Configure then opens the Configuration Console, which offers an Open Vault Console action. Users with the admin role receive a welcome email after the entitlement is applied.
Default policies and configurations
Defaults need a ServiceNow Vault subscription on the instance. In the Australia release, Anonymization and Log Export Service support them. The Brazil release adds Zero Trust Access.
Anonymization
Default real-time protection policies are added when the Data Privacy plugin and the Vault Console store app are installed. They sit alongside any existing policies. Select Activate on the tool card to apply them.
Log Export Service
Defaults are created when the instance has no Log Export Service configurations. Activate needs Log Export Service 3.5.0 or later. On an earlier version, the card shows Go to Log Export Service instead.
Zero Trust Access
Default step-up policies are created when a Vault subscription is present, the console and the Zero Trust – Continuous Authentication plugin are both installed, and no Zero Trust Access policies exist yet. The defaults protect the Cryptographic Module, Encrypted Field Configuration and Module Access Policy tables. Local users must re-authenticate with multi-factor authentication to reach them, and SSO users are redirected to their identity provider. Maint users are excluded. A ca_admin user can deactivate or reactivate a default from All > Continuous Authentication > Policies.
Viewing the defaults
Select View default policies or View default configurations on the card. From version 3.0.0 of the console app (September 2026), defaults for field encryption, data privacy, Zero Trust Access and Log Export Service carry a “Vault by Default” prefix. That prefix separates the policies ServiceNow provisioned from the ones your organisation created.
Guided setup and AI-assisted classification
In the Zurich release, guided setup ran in five steps: select app data, preview data classification, review the classification summary, protect existing data, and protect real-time data. Afterward, the application’s metrics appear under Tools on the console. The Australia release extended guided setup to custom applications. Console app 2.1.0 (June 2026) later added automatic classification and protection of custom applications and tables.
The Brazil release adds an agentic classification workflow for ServiceNow assets. You select a category of assets in the Data Catalog, and the agent recommends a data class for each column in scope, with a reason for each. Recommendations draw on table and column names and existing classifications. You review them and confirm, and the classifications appear on the assets after the next metadata collector run.
Release changes that affect the console
| Release or version | Change |
|---|---|
| Console app 2.1.0, June 2026 | Automatic classification and protection of custom applications and tables, plus AI insights into sensitive data in unprotected channels. |
| Console app 2.2.9, August 2026 | security_admin removed from the elevate and administration roles; viewing tool metrics moved to the admin role. |
| Console app 3.0.0, September 2026 | Insights summary, code signing activity metrics, a Log Export Service monitoring widget, ServiceNow Vault in Admin Home, default Zero Trust Access policies, an onboarding completion email, and the “Vault by Default” naming. |
| Brazil release | Monthly coverage report email, agentic classification for ServiceNow assets, and the ServiceNow Otto platform renamed as the conversational AI platform in ServiceNow workflows. |
| November 2026 release (Brazil Patch 1) | Vault Suite version 1.1.1 no longer includes Code Signing. Installing Vault Suite does not install it, and on instances that already have it, Code Signing no longer appears in the console. |
Coverage report and onboarding email
Active administrators receive a Vault coverage report on the last Monday of each month. The email is sent when Vault finds sensitive columns on the instance. An onboarding email arrives when Vault onboarding completes, and it goes to users with the admin role. For the wider compliance context, see governance, risk and compliance.
Frequently asked questions
Who can open the Vault console?
Users with the sn_vault_console.vault_console_admin role get the full dashboard and guided setup. The auditor role gives read-only review. Without elevation to the admin role, the dashboard opens read-only.
Why is the Insights section missing from my home page?
Insights needs the ServiceNow Otto for Vault application. While that application is inactive, the section stays hidden. Activating it brings the summary to the top of the home page.
Why do my Vault tool cards show as inactive?
Vault Suite needs a ServiceNow Vault entitlement. Without one, the plugins remain inactive after installation and the cards show as inactive. Confirm the entitlement first, then check the cards once installation finishes.
Does installing Vault Suite install Code Signing?
Not in the November 2026 release. Vault Suite version 1.1.1 no longer includes Code Signing, and installing the suite does not install it.
Will the console change my existing policies?
Defaults are added under each tool’s own conditions. Log Export Service keeps existing configurations and creates no defaults in that case. Zero Trust Access creates no defaults if any of its policies already exist.