OBLYTECH Logo
OBLYTECH Logo

Policy Attestation and Acknowledgement

Policy attestation in ServiceNow ties a policy requirement to a response someone is accountable for. Use policy acknowledgment campaigns to ask staff to acknowledge a published policy. Use control attestations to assess whether related controls work as intended. Track the audience, deadlines, individual responses, and control results apart, so that “done” has a clear meaning.

Define what the policy attestation response must establish

Start with the statement the respondent must stand behind. An employee who acknowledges a policy and a control owner who answers an assessment provide different evidence. Acknowledgment records a response to the policy. A control assessment tests the linked control. Keep those aims apart when you decide who gets work and how to report the result.

For example, an access policy can require staff to understand their duties. A control assessment asks the owner about access reviews. Sending the policy to staff does not show that the review control passed. A finished control assessment likewise does not show that the staff audience acknowledged the policy.

Before setup, name the policy, the audience, the control owners, and the decision each response will support. Use the Policy and Compliance Management guide to place these records in the wider policy lifecycle. The steps below use Brazil behavior. Check the application version and configuration on your instance before applying them.

Assign a published policy to its acknowledgment audience

The campaign setup steps need the Compliance User role. Go to All > Policy and Compliance > Policies and Procedures > Policies, then open the policy in the Published state. In the Acknowledgement Setup related list, select the Audience. The Audience module defines who belongs to an audience.

Check the intended recipients before you save. As a planning check, compare the audience you chose with the departments or duties the policy covers. A response report can look complete while a relevant group sits outside its scope. Record why the audience is right, so a later reviewer can follow the choice.

  1. Decide whether to select Allow users to decline policy and Allow users to request exception. These choices set which response routes the audience can use.
  2. Save the setup, open the Acknowledgement Campaigns related list, and select New. Review the values filled in from the policy.
  3. Set Valid from/to and Number of days to respond. The start cannot come before today, and the campaign end cannot pass the Valid to date of the policy.
  4. Review Short description and the Acknowledgement Details tab, then select Submit to prepare the campaign.

Treat campaign validity and the response deadline as two checks. The policy must stay valid for the campaign period, and respondents need a set period to act. For more on campaigns, see policy acknowledgment campaigns and responses.

Send the request and verify the assigned records

To submit an acknowledgment request through Compliance Workspace, you need sn_compliance_ws.corporate_compliance_analyst. Open All > Policy and Compliance > Compliance Workspace, go to Policy acknowledgements > All campaigns, and open the right Policy Acknowledgement Campaign record. Check its setup and campaign details before you ask for responses.

Select Request Acknowledgement after you submit the campaign details. The campaign moves to Pending Acknowledgement, and individual Acknowledgement records appear for audience members. This is the time to inspect the new work. Do not assume that a saved campaign has already reached its audience.

Use the Acknowledgement Results tab to compare the total sent with the running counts and types of responses. The Activity tab records acknowledgment activity. Work notes can track changes, and Additional comments supports talking with the audience. Keep internal notes and messages to the audience in the right place.

As an operating check, inspect a few acknowledgment records and match the total sent to the intended audience. Look into any gaps before you chase people who have not responded. Otherwise, a problem with the audience can look like a problem with participation. Reminders may then reach people who should not have received the policy.

Connect policy requirements to control attestations

When the question is how a control works, inspect the control objective and its generated controls. With the GRC attestation template approach, generated controls inherit the Attestation method and Attestation values from their control objective. The Attestation field names the template. Review that choice before you launch an assessment.

This method needs Smart Assessment core, Smart assessment Migration tools, Smart Assessment Connected, and Smart Assessment Designer. Enable smart assessments on control must be true. Existing control objectives default to classic assessment. When you bring in the template approach, review their method. Do not expect the setting alone to convert existing work.

sn_compliance_ws.corporate_compliance_manager and sn_compliance_ws.it_compliance_manager can view and edit templates. Creating template categories and template migrations needs sn_compliance.attestation_creator. Signed-in respondents with sn_grc.business_user or sn_grc.business_user_lite can respond through My Attestations on the Task page of Compliance Workspace, Risk Portal, and Employee Center.

When a control enters Attest, assessments start. The control owner and attestation respondents get notices with the control reference and due date. Before that move, check that the questions fit the control, the respondents can answer them, and everyone knows the deadline. The control attestation design and review guide covers the nearby design work.

For help with this work, see ServiceNow implementation.

Combine similar assessments without losing their context

To combine control assessments in Compliance Workspace, you need sn_compliance_ws.corporate_compliance_analyst. Open Control attestations and select more than one assessment instance in My pending tasks. Combine becomes available. Select it, enter a group name, and select Proceed. If you give no name, the group defaults to GRC attestation.

The grouped work appears in Combined Assessments. Single assessments stay open through Control attestations. You can still answer an assessment on its own after grouping. Combined Assessments lists assessments that have not been taken. So check a changing pending list against the completion records.

Before you answer together, inspect Assessment reference and the Details pane. Control information includes the entity, control objective, owner, status, and other context. Similar questions can still concern different cases. Group responses when the same answer holds for all the selected controls. Use individual responses where the evidence differs.

After you answer, select the confirmation check box in Submit combined assessment and select Submit all. Refresh My pending tasks. Review finished assessments through the Controls related list of the control objective record. Check their states for the entities you care about.

Track overdue work and interpret the results

To follow up on acknowledgments, go to Policy and Compliance > Policy Acknowledgement > Pending Acknowledgements or Overdue Acknowledgements. The Policy Acknowledgement dashboard adds counts for accepted, declined, pending, past-due, exemption-requested, and exempted acknowledgments. To view its widgets, you need Compliance reader (sn_compliance.reader). To edit the dashboard, you need Compliance administrator (sn_compliance.admin).

Use those groups to pick the next step. An overdue response needs follow-up. A decline needs review. An exception request needs its own decision. If you treat them as one unfinished total, you hide why work remains. Compare dashboard totals with campaign results when you prepare a review summary. A sound review also names the policy and campaign measured, the audience included, the open decisions, and who must resolve each follow-up item.

To reassign overdue control attestations in GRC Mobile, you need GRC Compliance manager (sn_compliance.manager). On Policy and Compliance, open Team’s Overdue Work > Attestations. Swipe left on the record, select Reassign, then Assigned to. Choose a member of the assignment group, and save with the Send icon or Submit.

Control outcomes need their own reading. With the GRC attestation template method, a failed attestation makes the control non-compliant and creates an issue. If an issue exists, it updates Issue source. A passing attestation in Attest closes existing issues and makes the control compliant. Review the control result next to acknowledgment participation. Do not present either one as a stand-in for the other.

Questions about changes during an attestation cycle

What happens if the control returns to Draft?

Selecting Return to Draft cancels active assessments. Retirement also cancels linked assessments. Before you make either change, find the affected work. Then canceled assessments are not counted as finished responses in the cycle review.

How does a policy exception affect active assessments?

Marking a control Exempt because of a policy exception cancels its linked assessments. Clearing Exempt while the control stays in Attest triggers assessments again. Count that new work when you review what is still open.

Can a published policy restrict control objective changes?

When a policy is linked to the control objective and that policy is published, the fields on the control objective form become read-only. Include this link in change planning before you schedule edits to the assessment setup.

Where are completed classic attestations retained?

For a control made earlier with the classic method, the Classic attestation related list holds the details of finished attestations. Include that history when you review a control that has since moved to the template-based assessment method.