OBLYTECH Logo
OBLYTECH Logo

Agent Chat Configuration

Agent Chat configuration in ServiceNow brings together the conversation entry point, requester messages, live agent controls, and rules for closing idle chats. Start with the portal or workspace your support team uses, configure the settings that apply there, then test the requester and agent experience together before opening the channel more widely.

Define the support experience before changing settings

The chat icon is the first thing a requester uses. Decide where people will open it, whether they will start with Virtual Agent, and what they should experience when a person takes over. Record those decisions before editing shared messages or timeout values. Otherwise, one team’s change can alter a conversation elsewhere.

Build a short acceptance checklist around a real support request: start a conversation, provide the required context, request human help, exchange messages, and end the conversation. Include an abandoned session as a separate test. A conversation that ends deliberately and one left idle exercise different behavior.

The settings below reflect Brazil behavior; check the labels and available features on your instance and release. Keep the scope of each setting in view: Source-to-Pay Workspace controls, Business Organization Support Portal activation, and shared conversation properties serve different parts of the experience.

If your main concern is how requests reach support staff, use the companion guidance on live agent handoff, chat queues, and surveys when defining that acceptance checklist.

Configure Agent Chat controls for Source-to-Pay Workspace

For Source-to-Pay Workspace, the required role for this configuration is admin. Use the Agent Chat settings to configure agent identity display and quick action shortcuts. Keep this change focused on the workspace being tested rather than treating it as a substitute for a complete end-to-end test of the chat.

  1. Navigate to All > Conversational Interfaces > Settings > Agent Chat.
  2. Under User Experience, move Agent names and avatars to the right to enable it.
  3. Under Configurable Toolbar Controls, select View All.
  4. In Quick Action Toolbar Controls, add or update the quick action shortcuts for live agents.
  5. Select Save.

As a review step, ask the support team to identify the shortcuts they need during a conversation before changing the toolbar. Then have an agent walk through a representative request with the saved configuration. Record whether the selected shortcuts support that task and whether the displayed identity matches the team’s intended presentation.

Change system messages without missing the channel difference

The required role for changing Virtual Agent and Agent Chat system messages is virtual_agent_admin or admin. These messages shape what requesters understand while a conversation is progressing. Review their wording with the people who handle escalations so that a message does not promise an outcome the test has not demonstrated.

  1. Navigate to All > Conversational Interfaces > Settings.
  2. Under System messages, select View All.
  3. Open the property record for the message being changed.
  4. Enter the replacement text in Value and select Save.

Saved changes apply immediately to the system messages displayed in the instance. When Virtual Agent and Agent Chat are both in use, the list includes properties for both. With Agent Chat alone, the list contains the properties relevant to Agent Chat.

Greeting and closing text need extra attention. The chat widget uses Messages [sys_ui_message] for those messages, while third-party conversational integrations use system messages. For a greeting that calls vaSystem.getTopicSelectionMessage(), the relevant system message is com.glide.cs.topic_picker_msg. For a closing that calls vaSystem.endConversation(), it is com.glide.cs.conversation_ended_msg.

Test the text through the channel where people will actually see it. Changing a system message and checking a widget greeting can lead to a misleading result because they use different message records. For the surrounding portal experience, see chat widget embedding and greeting setup.

Set idle conversation rules and test the scheduled cleanup

Abandoned Virtual Agent and live agent conversations have a default timeout of two hours, or 7200 seconds. The scheduled job Time Out Abandoned VA Conversations runs hourly to identify and close conversations that have exceeded the applicable timeout. Treat the timeout threshold and the cleanup schedule as separate parts of the test.

Administrators can add com.glide.cs.conversation_idle_timeout in System Property [sys_properties]. Enter sys_properties.list in the navigation filter, select New, and use that property name. Set Type to integer, enter the timeout in seconds in Value, and select Submit. The configured value must be less than 7200 seconds. Use Description to explain that this property sets the idle period, in seconds, for conversations across the supported channels.

The value measures idle time after the requester’s last response. For example, 1800 seconds represents a thirty-minute threshold; closure occurs when the scheduled job processes a conversation that has exceeded it. Do not judge the configuration by expecting the conversation to close at the exact instant the threshold passes.

A channel can override the shared timeout. Enter sys_cs_channel.list, locate the channel in Messaging Channels, double-click Conversation Idle Timeout, enter the value in seconds, and save it. Check for this override before investigating why two channels close conversations differently.

To adjust the job schedule, navigate to All > System Definition > Scheduled Jobs and open Time Out Abandoned VA Conversations. The form includes Time; selecting Periodically in Run also exposes scheduling choices such as Repeat Interval and Starting. Select Update after making a planned change.

For help planning these configuration changes, see ServiceNow implementation.

Validate portal access and the requester path

In the Business Organization Support Portal, agent chat configuration [sp_agent_chat_config] must be active for that portal. The requester roles for this portal conversation are Service Organization Contributor (sn_customerservice.service_organization_contributor) or Location Manager (sn_customerservice.svc_location_manager_core). These are access requirements for using the portal conversation, rather than the role requirement for changing system messages.

Test with a representative requester account. Select the Chat icon, choose the business organization directly associated with that requester from the pre-chat survey, and select Submit. A virtual agent or customer service agent responds. Finish the test with End Conversation. Confirm the selected organization and case context make sense to the support team receiving the request.

For the legacy NLU Virtual Agent widget, also verify the transition to a person. The chat header changes to show that the requester is interacting with a live agent, and attachment and send icons become available. Include this visual transition in acceptance testing so a requester can tell who is responding.

In the legacy NLU widget, check notifications separately from the handoff display. Incoming bot and live agent messages trigger audio and visual alerts. The number beside the Service Portal chat icon counts received messages and disappears when the requester opens the chat. Authenticated requesters can use the Contact Support menu to switch audible alerts or notification delivery on or off. For an instance-level audio setting, sysparm_disable_audio_notifications=true turns off audio notifications. Distinguish that setting from a requester’s menu choice when testing sound: use a signed-in account, check its selected options, and test an incoming message while the chat is closed.

Log each scenario with its entry point, requester role, expected result, observed result and the configuration record changed, and keep requester and agent observations separate. A visible greeting can pass while the receiving agent still lacks the context needed to continue the conversation.

Before approving the rollout, ask a second tester to repeat the requester path without the administrator guiding them. Have that tester explain what they believe will happen after requesting human help and after ending the chat. If their interpretation differs from the intended support process, revise the message wording or user guidance and repeat the affected scenario. This checks whether the configured experience communicates the process clearly.

Close the review by checking a successful conversation, an idle conversation, and the message wording on the intended channel. Keep failures separate: missing portal access, unexpected text, and delayed cleanup point to different settings. Broader customer support scenarios are covered in ServiceNow live chat.

Questions about Agent Chat rollout edge cases

Why can an attachment fail during a legacy widget live chat?

Uploaded files undergo a virus scan. A failed scan produces a message so the requester can correct and upload the file again. An upload or scan timeout also produces a message asking the requester to try again. Include both outcomes in your support troubleshooting notes.

Can mobile requesters upload files to a live agent?

The mobile chat client supports attachment uploads in bot conversations, but does not support uploads during live agent chat. Check the requester’s client before treating a missing upload option as a toolbar configuration problem.

Where can an organization requester find a case after chatting?

If the conversation creates a case or is linked to an existing case, the requester can select Cases in the Business Organization Support Portal. Include this follow-up in user guidance so people know where to continue after the conversation closes.

What should be checked if an NLU conversation ignores an exit phrase?

For NLU or keyword conversations, phrases such as Bye or Exit can initiate the Closing Conversation topic. If that does not happen, check whether the NLU model for the setup topics has been published and assigned. This is a different investigation from the idle cleanup schedule.