ServiceNow Health and Safety Incident Management supports safety incident investigations by recording events, assigning responsibility, tracking investigation work, and following actions through resolution. A sound investigation connects the initial account, injury details, contributing causes, and corrective work so that closing the incident reflects completed activities and a defensible explanation of what happened.
Start a safety incident investigation in ServiceNow
Begin with a clear account of the event and a named investigator. Health and Safety Incident Management supports incident and observation reporting, investigation, injury logging, root cause analyses, and actions. Reporting can start through mobile or Employee Center, while the Anonymous Report Center supports anonymous safety concerns. These entry routes feed a process that needs deliberate ownership.
For reporting on behalf of an employee, the required role is sn_ohs_im.operations_manager, sn_ohs_im.manager, or sn_ohs_im.agent. Navigate to All > Health and Safety > Health and Safety Workspace, select the incident management icon, and open the Lists tab. Choose Safety Incidents > All and select New.
Complete the Enter incident summary activity within Report an incident. Images can be added through Attachments when needed. Select Save to create the record in the New state. For an observation, use Safety Observations > All and complete the Details tab instead. Treat the distinction as an intake decision, with enough context for the receiving team to understand the concern.
The steps here reflect Brazil behavior; check labels and available features on your instance and release. For the broader application context, see ServiceNow Health and Safety Management.
Build an account that an investigator can test
A report becomes easier to investigate when it separates observed facts from explanations. Write down what the reporter saw, what remains uncertain, and which questions require follow-up. A statement that equipment moved unexpectedly is evidence to explore; a conclusion about why it moved needs supporting observations.
The incident form gives that account a consistent frame. Number identifies the record. Short description summarizes the event, Category classifies it, and Severity captures its impact or seriousness. Service associates the incident with a service. Avoid using the summary as a substitute for a fuller account of the sequence.
Check the time fields before comparing accounts from different locations. Occurred on displays the incident time in the viewer’s local time zone. Occurred on (local) displays it in the reporting user’s time zone. A reviewer looking at a different clock reading may be seeing the same event, so establish a shared timeline before treating the difference as conflicting evidence.
Use the following review questions to organize follow-up rather than adding unsupported conclusions to the record:
- What happened immediately before, during, and after the event?
- Which details came from direct observation, and which were reported by someone else?
- What injury or exposure information still needs clarification?
- Which conditions could still affect people while the investigation continues?
Assign responsibility before investigation work spreads
Assignment requires sn_ohs_im.manager or sn_ohs_im.agent. In Health and Safety Workspace, select the incident management icon and open Lists. Choose Safety Incidents > Unassigned, then open the record. Within Report an incident, use the Enter incident summary playbook activity to reach the assignment fields.
Set Assignment group to the safety group responsible for managing the incident. Set Assigned to to yourself or another safety agent, then select Save. For an observation, reach the corresponding fields through Details. These fields answer different questions: the group identifies the responsible team, while the assignee identifies the individual handling the case.
Agree who will collect accounts, review injury information, examine contributing conditions, and verify corrective work. Cross-departmental collaboration needs a lead who can reconcile those contributions. An assignee should know which requests remain outstanding and which evidence supports the current explanation.
At each handoff, ask the receiving investigator to identify the next unresolved question and the information needed to answer it. This review can expose a gap that a populated assignment field does not reveal. For a case involving several teams, agree how conflicting accounts will be assessed before treating one team’s conclusion as the explanation for the whole event.
Avoid confusing notification with responsibility. Watch list identifies users who receive updates; Assignment group and Assigned to identify the responsible group and user. Adding a stakeholder to the Watch list should therefore be a communication decision, supported by an understanding of why that person needs updates.
Connect causes to actions and evidence of completion
The application supports root cause analyses and actions to help mitigate incidents. The quality of that work depends on how the team connects the event to its explanation. Test potential causes against the timeline and available evidence, and record uncertainty when competing explanations remain plausible.
For example, if a worker reports a slip near a machine, consider the surface condition, the work taking place, and the sequence of movement. Do not turn an initial assumption into a final cause simply because it fits the first account. Ask what evidence would support or weaken that explanation, then pursue the missing information.
When planning corrective work, make the relationship explicit: identify the condition the action addresses, the person responsible for carrying it out, and the evidence needed to judge completion. Treat these checks as working practice rather than product requirements. A statement such as “review the area” leaves the outcome uncertain; a defined inspection followed by a recorded decision gives the investigator something to assess.
Keep immediate protective work distinct from longer-term prevention in the investigation narrative. Removing an immediate hazard can reduce exposure while an underlying cause remains unresolved. Before accepting an action as complete, check whether the work occurred and whether its result addresses the condition identified during the investigation.
For help planning this work, see ServiceNow implementation.
Where the process extends into wider environmental, health, and safety coordination, ServiceNow EHS provides the neighboring context. Keep the incident investigation focused on the event, its causes, and the resulting work.
Close the incident when the investigation work is complete
Closing an assigned incident or observation requires sn_ohs_im.manager or sn_ohs_im.agent. Complete the related activities before closing. In Health and Safety Workspace, open Lists and choose Safety Incidents > Assigned to me, or Safety Observations > Assigned to me, then open the relevant record.
For a safety incident, select Close incident and then Resolve. For an observation, select Close observation and then Confirm. The resulting state is Closed Complete. Preserve the distinction between these controls when preparing team instructions, because the confirmation sequence differs between the two record types.
Before taking that step, review the account, investigation findings, and action outcomes together. A colleague should be able to understand the sequence of events, the basis for the explanation, and how the related work was completed. An unanswered request or an unverified action deserves a decision before closure.
Further investigation can require reopening a closed or canceled record. This action requires sn_ohs_im.manager. Open the incident or observation through its All list in Health and Safety Workspace, then change State to Work in Progress. Explain the new evidence or unresolved question in the investigation narrative so that resumed work has a clear purpose.
Questions about investigation boundaries and reporting
What happens when a report contains sensitive information?
The Sensitive content option restricts viewing to a user with the Sensitive content user role. A person creating a record who selects this option without that role cannot view the saved record afterward. Consider the intended investigator’s access before saving sensitive material, particularly when arranging a handoff between teams.
Can an employee submit a report without connectivity?
Now Mobile supports offline incident and observation reporting with no role required for submission. Offline behavior and Health and Safety offline mobile must be configured, and device offline mode must be enabled. Scheduled offline caching uses glide.sg.offline.scheduled_download.enabled; if it is not set, update the cache through Settings > Update Cache before disconnecting. Reports synchronize automatically when connectivity returns.
Does completing an investigation produce OSHA forms?
Investigation completion is not the form-generation step: OSHA 301 generation starts from a recordable injury and illness report. The Health and Safety Incident Management OSHA Content Pack must be installed, the report’s Recordable option must be selected, and the user needs sn_ohs_im.compliance_manager.
In Health and Safety Workspace, open Lists through the incident management icon. From Safety Incidents > All, open the incident, then Report an incident. Use Add injury and illness to select the injury and illness report. Alternatively, under Injury / illnesses, use Recordable or All to locate and open the report directly.
After reviewing the report and selecting Recordable, choose Generate OSHA 301 form. In the dialog, choose an output format, such as CSV or PDF, then select Generate. The saved OSHA 301 template supplies the form layout, and the report supplies its information; the generated file appears in the incident’s Attachments section. These are the 301 steps, rather than a shared prerequisite list for annual forms. For the separate reporting workflow, see OSHA 300, 300A, and 301 injury and illness reporting.
What does Closed in the field mean?
Closed in the field indicates that the incident was resolved on-site. Keep that fact separate from the investigation’s explanation of contributing conditions. An on-site resolution should still leave enough information for another investigator to understand the event and assess any remaining questions about prevention.