ServiceNow gathers sustainability data through metrics and metric data tasks in Operational Sustainability Management. Define what each measurement means. Assign data owners. Record values with supporting evidence, and review submissions before you use them for targets or disclosures. Consistent units, reporting periods, and ownership make the collected figures comparable.
Plan sustainability data collection in ServiceNow
Start with the question the data must answer. An electricity reading for a building, a workforce response, and an emissions estimate need different collection instructions. Write down the reporting entity, period, measurement boundary, expected unit, source record, and person responsible before asking contributors to enter values. Treat this as a collection specification your team agrees to use.
Operational Sustainability Management, once called ESG Management, links material topics, goals, targets, metrics, and disclosures. A material topic names an area of impact. A goal establishes an objective, while a target provides a way to measure achievement. Keep those relationships visible so contributors understand why a requested figure matters.
Use one measurement definition consistently across participating entities where the underlying measurement is comparable. Avoid combining building consumption with a company total in the same collection exercise without an explicit aggregation rule. For application foundations and entity planning, see Operational Sustainability Management setup and entities.
The controls below follow Brazil behavior. Check them against your instance, application version, and enabled plugins before rollout. Test one full reporting period with a small group of contributors before you add more.
Connect collected metrics to measurable targets
A user with sn_esg.program_manager creates goals through All > Operational Sustainability Management > Operational Sustainability Workspace > Lists > Program Setup > Goals. Select New, fill in the goal details, and select Save. Establish an Owner and dates that reflect responsibility for the objective rather than responsibility for entering a single value.
The same role creates targets through Lists > Program Setup > Targets in the workspace. Select New and link the target to its Goal. Pick the Type with care. Maximize needs a Base value below the Target value. Minimize needs the Target value below the Base value. Milestone uses progress to show that a fixed milestone is met.
For Maximize and Minimize targets, Source for target names a metric or metric definition that feeds the target. After you save, open the Metric Definition related list and select Add. Choose the definitions, then select Add again. Check each definition against the scope of the target before you gather data.
Check in frequency offers Daily, Weekly, Fortnightly, Monthly, and Quarterly. Pick a rhythm the owner can keep. As a design check, match that rhythm to the source records you have. A monthly invoice cannot back up daily actual readings without another source. Decide how reporting periods line up before the first entry.
Give contributors the access their actions require
Manual data entry needs the sn_esg.data_owner role. This role can read metric information and can read and update metric data tasks. Give the task to someone who can obtain the underlying evidence, distinguish an actual reading from an estimate, and answer questions about the measurement boundary.
Metric administration and contribution are separate responsibilities. The sn_esg.metrics_manager role can read, write, and update metrics and metric definitions. It can delete only records that the user created. Do not grant broad administrative access simply to resolve a contributor’s difficulty opening an assigned task. Check the assignment and visibility first.
In a domain-separated setup, records take the domain of the user who creates or generates them. Operational Sustainability Management supports data separation. Logic and process separation are not fully supported. Test contributor access in the right domain before you send requests. A valid role does not fix a record in the wrong domain.
Record values and evidence in metric data tasks
The sn_esg.data_owner user opens All > Operational Sustainability Management > Operational Sustainability Workspace > Metrics > My metric data tasks. Open the task and select Move to In Progress. Confirm that the task matches the right reporting entity and period before you enter the response.
- In Metric input, enter Metric data for a Quantitative metric or Response for a Qualitative metric. Use the boundary that was requested, not a handy total from another source.
- For numerical data, choose the Unit that fits the figure you entered. Check the supporting record before you change the unit.
- Review Variance (%) against the last period. Look into a large shift before you assume that performance changed.
- Complete the accuracy certification after you check the response. Add context in Additional comments (Customer visible), then select Save.
- In the Related documents related list, select New. Enter a Name and the supporting Url on the Related Document form, then select Submit. The Metric data task field fills in on its own.
Use evidence names that let a reviewer identify the reporting period and source without opening several unrelated records. Confirm that the intended reviewer can access the supporting material. If they cannot open the reference, the number is hard to back up, even when the value is right.
When estimation is on through sn_esg.metric_estimation, Type of Data and the estimation fields let you tell estimates from actuals. Estimation method offers Manual, Average, and Same period as last year. Choose an approach that fits the available evidence, and explain the assumption instead of presenting an estimated figure as a measured result.
Validate units, exceptions, and approval
A metric definition sets the reporting unit. Contributors can enter another unit from the same unit family. Conversion applies where the conversion factor of the family is Direct. Review the conversion configuration before comparing readings from different locations. Two numbers that match do not prove that two records describe the same quantity.
To set up a conversion, sn_esg.program_manager opens All > Operational Sustainability Management > Administration > Unit Conversions and selects New. Fill in Name, From unit, To unit, Unit family, and Value, then select Submit. Test a known input and the output you expect before you rely on the result in a target.
ServiceNow checks submitted data against active thresholds. Their Valid from and Valid until dates must cover the interval date of the task. A breach asks for a reason when breach monitoring is on. If no threshold covers that interval, no threshold rating is set. Run this date check when a rating is missing and you do not know why.
To review a task, you need sn_esg.data_owner, sn_esg.program_manager, or sn_esg.metric_manager. Assigned approvers see their approval task in the approvals tab of a metric data task. In the workspace, select the Metric data table icon, review the cell, and select Approve or Reject. A rejection needs a reason.
The approval setting sn_esg.metric_approval is available when sn_grc_appr is active. Simple shows an Approval section on manual metric definitions and metrics. Advanced uses approval conditions, tables, and approvers in GRC: Approver Configurator. Set this during application configuration, and test the route with a typical entry.
For help with this work, see ServiceNow implementation.
Prepare collected data for reporting
Before you use figures in disclosures, reconcile the source population, reporting period, unit, and estimate treatment. Compare the selected metrics with the reporting requirement rather than assuming that a similarly named measure answers it. Resolve duplicates and inconsistent entity references through a defined correction process. data cleanup and reconciliation covers that related work.
The sn_esg.reporting_disclosure_manager role manages disclosure reports. Authority documents describe reporting frameworks or standards, and citations name single reporting requirements. For the next reporting stage, see ESG disclosures and reporting frameworks.
Before you close the cycle, have the data owner and reviewer agree which entries still need fixes or more proof. Keep open values visible in the team record. Then a count of finished tasks is not mistaken for a complete dataset that you can defend.
Questions about collection exceptions
What should a team do when a source invoice is late?
Agree whether the period stays open or uses an estimate. Record the decision and name who will reconcile the estimate when the actual evidence arrives. Do not enter zero just to make the data look complete.
How should a shared building’s consumption be divided?
Agree on a split method before contributors submit their shares. Keep the original building total and the basis for the split so reviewers can match the pieces. Revisit the method when occupancy or the reporting boundary changes.
Should corrected historical values replace the team’s working total immediately?
Review how the fix affects comparisons and reporting work that is already under way. Decide who accepts the fix and who must refresh the figures that depend on it. Keep a clear note on why the source value changed.
How can a reporting manager narrow a long citation list?
With sn_esg.reporting_disclosure_manager, open Lists > Disclosure requirements > Citations in the workspace. Select the filter icon and Advanced view. Set Functional domain, contains, Operational Sustainability Management, then select Update. A citation you expect may have a different functional domain.
How does a buyer check that each sustainability input and emissions total can be traced to approved evidence before it is published?
Pick one published total and walk it backward: the disclosure line, the calculation, the factor version, each metric data task, the approval recorded on that task, and the evidence it cites. The total passes only when every link resolves to an approved record that a reviewer can open without asking the team.
Choose the figure before you look at the system
Let the buyer pick the figure. Choose a company-level total that carries weight in the disclosure and draws on several inputs, since one meter reading tests very little. Record its reporting entity, period, boundary, and signer. If any of those is missing, stop there.
Walk the chain one link at a time
- Disclosure line. Match the published number to the approved total in the same unit and rounding. Note any conversion in the publishing tool.
- Calculation. Ask for the inputs and the method, then reproduce the total yourself. A total that cannot be rebuilt from its stated inputs is not traceable.
- Factor version. Each emissions factor should show its source, its vintage, and the version in force for the period. A factor changed mid-year needs a written rule for which values it affects.
- Metric data task. For each input, check the reporting entity, period, unit, and whether the value is an actual or an estimate.
- Approval. The approval should name the approver, the date, and the value approved.
- Evidence. Open the document named in the related documents list. It should be the invoice, meter export, or register line, covering the same period and boundary. A file name alone proves nothing.
Judge the gaps, not only the pass
A clean trace has no break. A break labeled as an estimate, with its method and approver on record, is a disclosed assumption rather than a hidden gap. What fails is a break that the record hides, or a value with no evidence reference.
Test one correction
Reject one input in a closed test period and watch what moves. Every total that depends on it should change, and the published figure should trace to the value in force when it was reported. A published report still showing the old figure with no note means the publishing step is not controlled.
Ask for these before you rely on the trace
- The reporting boundary and the list of entities it covers.
- The factor library, with source and version fields, exported for one period.
- Metric definitions with their owners and the role that approves each one.
- An evidence list that shows who can open each cited file, with your reviewer on it.
What the check does not prove
The control model here is a recommendation. It describes good practice for tracing a number and does not say what any statute requires. The trace shows whether the record supports the number, not whether the method is right or the disclosure meets a standard. Those judgments belong to the accountable finance or risk owner and, where required, an independent assurance provider.