OBLYTECH Logo
OBLYTECH Logo

Operational Sustainability Management Setup Guide

Setting up Operational Sustainability Management comes down to three decisions: which dependencies and roles the install adds, how entities and entity classes describe your organization, and which domain each record is created in. Items several domains share, such as goals and topics, belong at the global level, because a record stays in the domain of its creator.

Confirm dependencies and entitlements first

The install requires the sys_admin role. It also brings in the ServiceNow Store applications and plugins the application relies on, so review the dependency list before you select Install. Five store applications must be present:

Store application What it contributes
GRC: Profiles Shared architecture, issue management and indicators across the GRC suite
GRC: Common Workspace Elements The base workspace container for workspace parts shared by GRC applications
Goal Framework Goals that track progress toward the material topics you choose
GRC: Metrics Metric definitions used to assess, compare, track and report performance
Microsoft 365 for ServiceNow Reporting Disclosure reporting in Microsoft Word, built from list reports, charts and pivot data

The application is not fully usable until you complete the entitlements. In the ServiceNow Store, open the product, select View Details and then View Products, and choose Operational Sustainability Management. Select Opt-in to entitle all instances, accept the terms and conditions, and use Manage Entitlements if just some instances should be affected.

Demo data is a set of sample records for common use cases. Demo data suits a first install on a development or test instance, so select the Load demo data box only in that case.

Know which roles, properties and jobs arrive with the install

These five roles come up repeatedly during setup:

Role What it covers during setup
sn_esg.admin Manages the items in the application and configures ESG integrations
sn_esg.program_manager Creates material topics, goals, targets, emission activities and factors, and manages entities
sn_esg.metrics_manager Defines metric definitions and metrics, and can delete the ones it created
sn_esg.data_owner Supplies input to the metric data tasks assigned to them
sn_esg.reporting_disclosure_manager Creates and updates disclosures, and can delete the ones it created

Material Topic (sn_esg_material_topic), Emission Activity (sn_esg_emission_activity), Emission Factor (sn_esg_emission_factor) and Emission Factor Location are the tables you touch early. Association tables such as Metric to Goal and Metric to Target link the records together.

Two system properties need a decision:

  • sn_esg.metric_approval. Simple places an Approval section on the metric definition form and on each metric, so you name approvers directly. Advanced moves approval into the GRC: Approver Configurator application, which supports several approval levels. It requires the sn_grc_appr plugin to be active, and it must be set during configuration.
  • sn_esg_scope3.historical_years_selector. It controls how many historical years appear on the Scope 3 dashboard.

The goals summary and the disclosure summary both rebuild daily at 12 AM, the license count runs daily at 11 PM, and the goal activity summary rebuilds every 12 hours. A change made during the day therefore shows in those summaries after the next run.

Model entities, entity classes and entity types before data entry

An entity is what a goal is measured against. It can be a person, a process, a department or an application. If your goal is to cut carbon from your data centers, the data centers are the entities. A parent company and its subsidiaries are entities too. A parent entity that has child entities is said to have downstream entities, and a child with a parent is said to have upstream entities. The parent typically handles reporting and measurement for its children.

After you create a goal, associate the entities it tracks with it. Defining an entity also identifies its owners.

An entity class adds conceptual meaning to an entity. Three office branches in three cities are entities, and their class is the location of the office. Typical classes are Department, Business Unit and Business Service. When you create a class, you enter its name, a parent class such as Company or Department, whether it is a root (True or False), and its tier, such as Application or Business.

An entity type groups entities that share the same attributes through filter conditions. An Employee type might hold employee number, name, department and designation, while a Product type holds product ID, name, cost and currency. One entity can sit under more than one type, such as a Person type and an Organization type.

To create an entity, go to All > Operational Sustainability Management > Operational Sustainability Workspace > Scoping > All entities, and select New. The form asks for Name, Owned by, Active, Class, Location (address, city, state and country), Description, and the Table and Applies to record fields that link the entity to existing records.

Plan domain placement before you create records

Domain separation is supported for this application at a Basic support level. It separates data from the user interface, cache keys, reporting, rollups and aggregations, so business areas can keep their own goals, targets and material topics. Users can expand or collapse their domain scope, and they keep access to domains explicitly granted to them through domain visibility. The instance owner has to configure the application to run across multiple tenants.

The separation has a limit. The application separates data but does not fully separate logic and process. Records generated automatically, including those created by Project Portfolio Management and GRC: Metrics integrations, take the domain of the user responsible for generating them, so check that user’s domain before the flow runs.

Take Global at the top, then TOP, then Domain A and Domain B as an example hierarchy.

Record Where to create it Reason
Goals, material topics and targets that users in Domain A and Domain B both assess Global domain A goal created in Domain B cannot be used from Domain A, because of how records are indexed
Risks or controls for a team The domain where the assigned users sit Users must not be assigned a risk or control that lives in a higher domain than their own

Some settings stay global. The “Remember me” option on the login page, for example, cannot be set per domain. If you need complete separation of system properties and no global reporting, separate instances are the better fit.

Sequence the setup after installation

The mandatory steps run in this order: material topics, goals and targets, entities and entity types, metric definitions, metrics, data for metrics, then disclosures. Integrations are optional. Following that order keeps each record’s parent in place before the next one needs it.

Material topics come first because later steps trace back to them. A topic starts in Draft, where you can edit its name, classification, importance to business success, importance to stakeholders, priority and approver. The program manager reviews it in the Approval state, then it moves to Monitor. Topics in Monitor are the ones shown in the materiality matrix on the Operational Sustainability Workspace home page. A monitored topic can return to Draft after a later materiality assessment, and doing so does not change the goals and targets that depend on it. A topic that is no longer tracked moves to Retired.

Topics imported from Socialsuite skip approval, their fields are read-only here, and they cannot return to Draft. Socialsuite’s Not started state maps to Draft, Open for input and Input closed map to Materiality Assessment, and Complete and Historical map to Monitor.

Goals link to material topics and can have subgoals. Targets measure a goal. For a goal of raising workforce diversity, a target might be to run a diversity program quarterly. Maximize and Minimize targets also name a source, the metric or metric definition that contributes to them, so plan target and metric setup together.

Metric definitions come in three types, manual, calculated and automated, and the checklist also includes composite metric definitions. Manual metrics receive data through metric data tasks. The data owner supplies that data, and an ESG administrator can override it, with a justification.

Disclosures come last. A disclosure is the report that presents the organization’s operational sustainability performance, and its disclosure summary gathers the citations, metrics and metric data attached to it.

Which product name, release and configuration should a buyer confirm before scoping a ServiceNow sustainability project?

Confirm the application as Operational Sustainability Management, the name in ServiceNow’s September 2026 documentation, formerly ESG Management. Record the instance release and installed application version in the scope document. Then confirm the legal entities and reporting periods, the emissions method and factor set, and which integrations will be live.

Confirm the product name before the scope is written

Older material may still say ESG Management, so put the documented name in the statement of work and the entitlement request. That way a sales sheet cannot be read as a different product.

Confirm the release and the installed version

The Australia release reached early availability on March 12, 2026 and general availability on May 5, 2026. Record both dates and do not treat early availability as general availability. Confirm which release the instance runs, which application version is installed, and whether the configuration being scoped has been tested on that version. A demonstration on another release proves less than a test on your own instance.

Confirm the configuration choices that change the scope

  • Entities and reporting periods. List each legal entity, its country and its reporting period. Formation, consolidation and exclusions decide which obligations attach to which entity.
  • Regime status. As of November 2026, California’s SB 253 Scope 1-2 reporting is in force with a first deadline of November 10, 2026, while SB 261 and SB 253’s Scope 3 requirement are enjoined during litigation. Canada’s CSDS 1-2 are voluntary unless a government or regulator mandates them.
  • Emissions method. Record the GHG methodology, the factor set and its version, and the Scope 3 categories in the inventory. Configurable methodologies and factors are a vendor claim, so whether they cover your categories is something to test.
  • Integrations. Name each connected system, such as Integrated Risk Management, Project Portfolio Management or a specialist carbon engine. Each integration still needs a tested data mapping.
  • Disclosure scope. Decide whether the deliverable is emissions data alone or also the climate-financial narrative. A carbon dashboard alone does not meet the climate-financial reporting that AASB S2 requires of in-scope Australian reporters.

Ask for proof before you approve the scope

Software configuration does not establish compliance, so the statement of work should not promise it. Before approving the scope, ask for these three items.

  1. One published emissions total, traced to its source records and factor version, with the calculation reproduced on your release.
  2. A list of each Scope 3 category with the method planned for it, and any category that depends on a specialist engine named as such.
  3. A demonstration on representative data showing how one corrected input updates every disclosure that uses it.

Vendor wording such as audit-ready is not an assurance opinion, so assurance scope and timing belong in the plan as their own deliverable.

Frequently asked questions

Who can install Operational Sustainability Management?

A user with the sys_admin role can install it.

Which role creates material topics and entities?

The sn_esg.program_manager role creates material topics, goals, targets, emission activities and factors, and it manages entities, entity types and entity classes.

Why might a goal not appear for users in another domain?

A goal created in one domain is indexed to that domain and cannot be used from another. Goals, material topics and targets that several domains share belong in the Global domain.

What does the metric approval setting change?

Simple puts an approval section on the metric definition form and each metric, where you name approvers directly. Advanced moves approval into the GRC: Approver Configurator application, which supports several levels.

Can a material topic change after it reaches Monitor?

Yes. It can return to Draft after a later materiality assessment without affecting the goals and targets linked to it. Topics imported from Socialsuite are the exception, because they cannot return to Draft.

Related reading on this site

For the general domain separation steps, see domain separation explained. For the licensing side of the install, see entitlement explained. The wider ESG and risk topics sit under governance, risk and compliance.