Operational sustainability management integrations connect the Operational Sustainability Management application to outside systems that already hold the data a sustainability program needs. Five are covered here: Workday for HR metrics, Urjanet for utility bills, Watershed for emissions spreadsheets, SAP Concur for business travel and Socialsuite for materiality assessments. Each one brings records in as metrics, entities or material topics.
Where the integrations fit in the application
Operational Sustainability Management was previously called ESG Management, and its component names still reflect that. Before installing, an admin completes the entitlements for the application in the ServiceNow Store, then accepts the terms.
Each integration installs an application with its own plugins, roles, tables and scheduled jobs. The data arrives as metrics generated from metric definitions, as entities that represent a place or account, or as material topics. Metrics roll up through a formula set on the metric definition, so those definitions deserve close attention.
| Integration | What it brings in | Role named in setup | Main setup object |
|---|---|---|---|
| Workday | Monthly and yearly HR metrics | sn_esg.admin | Metric definitions and Workday reports |
| Urjanet | Utility consumption and waste | sn_esg.admin | Entities, metric definitions and a webhook |
| Watershed | Carbon emissions and energy data | sn_esg.program_manager | Spreadsheet import set and transform map |
| SAP Concur | Business travel distance for Scope 3 | admin | Connection, webhook registry and jobs |
| Socialsuite | Material topics and materiality scores | sn_esg.program_manager | Material topic selection property and sync |
Workday: HR metrics for disclosure reporting
The Workday integration imports HR data needed for sustainability reporting. An ESG administrator can pull monthly and yearly metric data across categories such as benefits, demographics and compensation. The integration makes the HR-to-sustainability data transfer automatic and secure, and saves time for the HR, sustainability and IT teams.
The application ships with 150 metric definitions in an inactive state and 15 matching reports. Activated definitions are the ones that pull data, so a team should settle which disclosures it needs before switching anything on.
Two report types exist. A point-in-time report returns data available up to a given date, shaped by the metric frequency. A cumulative report returns data across a period, such as one quarter.
To activate a report, open the Workday Reports list under the Workday integration, select the report, choose Active, set the frequency and update the record. Each default metric definition needs its matching report switched on. The install itself requires the admin role and an active IntegrationHub Enterprise Pack Installer plugin.
Urjanet: utility bills as metrics
Urjanet extracts utility bills from the source and delivers them to the systems that rely on them. Water and electricity consumption, along with waste generated, can arrive in the application as metrics.
The setup has three layers. First, each place or account that generates a bill becomes an entity. An electricity supply for one office is one entity, and that building’s water supply is another. Existing entities can be mapped instead of recreated. The entity class and entity owner fields must be completed by the people running the integration.
Second, metric definitions decide what is stored, and only active definitions load data. The default definitions need their unit, frequency and enterprise owner filled in manually. A team can create its own definitions when the defaults do not fit its reporting.
Third, the connection carries the data. It needs valid Urjanet credentials, and one active connection is supported per domain. Real-time updates arrive through a webhook URL, which Urjanet calls when a statement is generated or modified. Meter details come in through a scheduled job, and historical loading starts from the date set when the connection is configured.
Watershed: emissions data from spreadsheets
Watershed measures carbon emissions and renewable energy, and it supports calculating Scope 1, 2 and 3 emissions. The scopes are worth keeping straight when building metric definitions.
| Scope | Source type | Examples named in the integration |
|---|---|---|
| Scope 1 | Direct emissions | Fuel combustion, company vehicles, chemical production in owned or controlled process equipment, fugitive emissions |
| Scope 2 | Indirect, from purchased energy | Purchased electricity, heat and steam |
| Scope 3 | Indirect, across the value chain | Purchased goods and services, business travel, employee commuting, waste disposal, use of sold products, investments |
Watershed keeps its data in spreadsheets, which the program manager imports into source tables that the metric definitions reference. Out of the box, the integration covers carbon emissions, renewable energy and non-renewable energy. Other data, such as water usage, can be brought in through a metric integration.
Several prerequisites apply. The import_admin role must be added to the sn_grc_metric.admin role. Only automated metric definitions with the External source method accept imports, so a manual definition must first be changed to an automated type with that method. Definitions can be created before importing, or the system can create placeholders to complete later.
Loading runs from the Load Data page. Select an existing table, pick the Watershed Data import set, choose the file, confirm the sheet number and header row, and submit. The spreadsheet lands in a staging table with its columns created automatically. By default, three columns are supported, and other columns need a data mapping. Record identifiers entered as text let the import match rows to existing entities. A transform map then connects staging columns to the target table so the rows become metric data.
SAP Concur: business travel emissions
The SAP Concur integration calculates emissions from employee travel by car, airplane and train, feeding Scope 3 figures from trip records.
Three metric definitions cover total distance travelled by car, by train and by airplane. All three start inactive, so the team activates the modes it wants to track.
Setup runs in stages: install the application, activate the metric definitions, create the connection and credentials for the SAP Concur event subscription service, create a webhook registry that reports trips created or modified, then run the entity onboarding job.
Two scheduled jobs then move the data. The trip data import pulls distance and trip start and end dates, runs automatically and can also be run by hand. The data import job runs monthly, groups trip records in the staging table by trip end date, and writes the totals as metric data for each definition.
Socialsuite: material topics from a materiality assessment
Socialsuite is a platform for running materiality assessments. The integration imports the resulting material topics so they can be managed in the application and linked to goals and targets. It supports double materiality, which assesses impact and financial materiality together, and single materiality, which assesses one of the two.
Imported data covers each topic and its impact and financial materiality scores, which run from 0 to 100, along with the assessment methodology, reporting period and a materiality decision.
Activate the Socialsuite plugin as an admin, then set the Material topic selection system property to Socialsuite. The Sync Topics button appears on the list view only after that. Create a Socialsuite connection, then sync. In the Operational Sustainability Workspace, a program manager opens the material topics list under Program setup, selects Sync Topics, chooses a reporting period and imports. Imported topics show Socialsuite in the material topic source column and move through workflow states that follow their status in Socialsuite. The import log, a read-only table maintained by the system, records assessment name, topic name, reporting period ID, sync status, a reference to the created topic and comments.
Setup sequence common to the integrations
Each integration has its own details, but the work follows a similar order.
- Complete the entitlements for the application and its ServiceNow Store dependencies.
- Install the integration application with the role it requires (admin for Workday and SAP Concur, sn_esg.admin for Urjanet), loading demo data on a development or test instance.
- Activate the metric definitions or material topic selection the team needs.
- Create the connection, credentials, webhook or import set that carries the data in.
- Map entities and metric definitions so incoming rows have a destination.
- Run the scheduled job or manual load, then check the import log or import set.
Roles named across the integrations
| Task | Role |
|---|---|
| Installing the Workday or SAP Concur application | admin |
| Installing the Urjanet application | sn_esg.admin |
| Activating Workday reports | sn_esg.admin |
| Creating the Urjanet connection | admin or connection_admin |
| Urjanet entity mapping | sn_esg.admin |
| Loading Watershed spreadsheets and syncing Socialsuite topics | sn_esg.program_manager |
| Importing Watershed data through metric definitions | import_admin added to sn_grc_metric.admin |
Which parts of a climate reporting process should stay in ServiceNow, and which should connect to a specialist emissions engine?
Keep the work that runs on people and approvals in ServiceNow: data owners, collection requests, evidence, review and corrective actions. Send the emissions calculation itself to a validated engine, native or specialist, when the methodology, factors and Scope 3 coverage must be proven. Connect the two so that every reported number traces back to its inputs.
Keep in ServiceNow: ownership, requests and evidence
The platform suits recurring owners, reminders and approvals, so keep these in ServiceNow:
- Owner assignment for each entity, site and data source
- Completeness checks that flag missing months before any calculation runs
- Evidence attached to each metric value
- Approvals for methodology choices, boundary decisions, exclusions and estimates
- Corrective-action tasks raised when a figure moves outside an agreed tolerance
Send to a specialist engine: calculation and factor control
The calculation layer is where a dedicated carbon accounting engine usually earns its place, because it keeps factors by vintage, applies global warming potential values and reruns totals under a different method. As of November 2026, ServiceNow documents configurable GHG methodologies, so the real question is whether your factor coverage and Scope 3 methods hold up on your data.
The handoff: what crosses the boundary and what comes back
As of November 2026, ServiceNow documents an integration with Watershed. Confirm which fields that connector passes. Write the handoff as a field list. Outbound: the activity amount, unit, period, entity and source record identifier. Inbound: the calculated quantity, factor version, method identifier and timestamp. Store the factor version and method identifier beside each result so a rerun can be compared with the reported figure.
A test to run before committing to a design
Pick one published total and test it.
- Choose one emissions total from the last closed reporting period.
- Trace it back to its source records and the factor version it used.
- Rebuild the figure from signed-off inputs and a method with a version number.
- Show who approved the total, and when.
- Correct one source record and confirm that every disclosure using that total updates.
How the regulatory timeline moves the boundary
As of November 2026, CARB has confirmed November 10, 2026 as the first-year SB 253 Scope 1–2 reporting deadline. On November 9, 2026, the Ninth Circuit enjoined SB 261 and SB 253 Scope 3 reporting while litigation continues, and left SB 253 Scope 1–2 reporting in place. A paused Scope 3 duty can still matter for internal targets, so an engine choice should not rest on a deadline that may move.
Signs the work belongs on one side or the other
- Lean toward ServiceNow when it already runs the enterprise and many owners need recurring reminders and approvals.
- Lean toward a specialist engine first when deep calculation is the urgent gap, Scope 3 categories dominate the inventory, or finance already runs a controlled reporting platform.
Frequently asked questions
Are the Workday and SAP Concur metrics active after installation?
No. Their default metric definitions start inactive, and an administrator activates the ones the team needs.
Why might a Watershed import fail?
Two setup points are required for an import to work: the metric definition must be automated with the External source method, and the import_admin role must be added to sn_grc_metric.admin.
Can one Urjanet connection serve several groups?
One active connection is supported per domain. Domains keep imported data apart and restrict access between them, so groups that need separate records can sit in separate domains.
What does the Socialsuite import log show?
It shows each assessment and topic, the reporting period, the sync status and the material topic record the import created. Comments carry error messages, and the table itself is read-only.