OBLYTECH Logo
OBLYTECH Logo

ServiceNow Sidebar Record Discussions in Teams and Slack

Sidebar is ServiceNow’s discussion panel for working a case with colleagues, around a record or as a standalone conversation. With the Microsoft Teams or Slack integration on, people who use only those apps join the same thread, and messages appear on both sides.

Where a Sidebar discussion sits

A case rarely gets solved by one person. The agent needs a network engineer, a manager signs off, and the answer has to end up against the ticket. Sidebar keeps that exchange on the same screen as the record, so the reasoning does not drift into an email thread nobody can find later.

Sidebar works in six workspaces: the Customer Service Management configurable workspace, the CSM Manager Workspace, the HR Agent Workspace, the ITSM Manager Workspace, the Security Incident Response Workspace and the Vendor Management Workspace. Other workspaces, such as the Service Operation Workspace, can get the Discuss button through a separate procedure. For the case-handling side of those workspaces, see the Customer Service Management guide.

Discussion type Attached to a record Who can join Visibility
Record discussion Yes, and one record can hold several Participants with access to the record Listed under the record’s discussions
Private record discussion Yes The agent and invited participants Hidden from search for non-participants; cannot be made non-private
Standalone discussion No, until linked Users and groups the starter adds Always private

Linking a standalone discussion to a record has a side effect: participants who lack access to that record are removed automatically.

Starting and running a discussion

Open the record from a Next Experience page or a Core UI record page, select the Sidebar discussion icon, then New discussion. The subject fills in from the record’s short description and can be edited. A number in parentheses at the start of the subject marks the sequence: “(2) Email issue” is the second discussion on that record, which keeps a busy case readable.

Participants pre-fill from the assignment group when the record has one. You can add individual users or groups, but only people with access to the record can be added. Sidebar is meant for records that carry a record number, which avoids incompatibilities with newer features. Standalone conversations need no record and no particular role.

The panel’s tabs narrow the list to All, Unread, This record, Mentions and Favorites. Starred discussions move into Favorites. Dismiss closes the dialog while you stay in the conversation, and Leave exits it. Several discussions can stay open as docked windows; minimized ones collapse into an overflow menu holding up to 25 by default, a limit an admin can change.

Threaded replies keep a side conversation attached to the message it answers. Deleting a message that has replies warns you, because those replies go too. Editing and deleting are limited to your own messages, one edit at a time. A message containing a web address can be deleted but not edited. Deletion is final, and a mention inside a deleted message goes with it.

Typing @ and a name notifies that person and places the message on their Mentions tab. Reminders also run by email: if a user leaves messages unread for 24 hours, Sidebar sends a prompt to resume, and a reminder goes out when a requester is added to a discussion that already exists. For the wider email side, see the notifications and email handling guide.

How Teams and Slack users join

Sidebar connects to one outside messaging system at a time, either Microsoft Teams or Slack, not both at once. Teams setup is covered in the ServiceNow and Microsoft Teams integration guide, and the Slack side in the ServiceNow and Slack integration guide. This section covers what happens inside a discussion once the link is live.

External colleagues carry a platform icon wherever they appear, a Teams logo or a Slack logo, in discussion windows and search results. The icon does not show in the activity stream. Each external person needs an account on their own platform. A Teams user must already have a Teams account, and if they are signed out they are prompted to sign in. Slack works the same way with a private channel chat. A person with Teams or Slack access but no ServiceNow login appears with the platform logo on their avatar.

People can also be pulled in from the other side. Adding someone to the Teams or Slack group chat adds them to the Sidebar discussion automatically. A Teams group chat holds up to 250 users, and so does a Slack private channel. For Slack, a background job runs every 30 minutes and maps each Slack user to the Sidebar user with the same email address.

Content Microsoft Teams Slack
Plain text, emojis, web addresses, attachments Yes Yes
Images Not listed Yes
Links to ServiceNow records Not listed Yes

Actions mirror across the boundary, and Slack replies appear against the message they answer. Test how Teams replies display in your own instance before briefing agents on them. Messages arriving from Slack are checked against Slack’s signing secret.

Sometimes a message cannot reach the other side. Sidebar then shows “Not delivered in Teams”, “Not deleted in Teams” or “Not updated in Teams”. Whether that notice reaches only the sender or all Sidebar users in the discussion depends on error notification settings, so check that setting before go-live.

Removing an external participant changes what they can do, not what they have seen. All participants see a notice, and the removed person can still open the group chat and read earlier messages, but cannot post. Earlier Sidebar messages are also not loaded into a group chat for a user the admin newly enables; that person receives only what is sent afterwards.

Costs, limits and decisions to make first

Microsoft applies its own charge to Teams API use. The rate charge applies each time the API is called, for messages going from ServiceNow to Teams and back. Searching for users, adding them to a group chat, presence and reactions are not charged. Microsoft bills the customer directly through their Azure account. The base integration therefore asks for at least one external-only participant, meaning someone with no matching ServiceNow user record, to keep API calls down. An admin can change that through Teams permissions by adding an internal user or group, which makes it a cost decision as well as an access one.

An admin can switch the Teams integration off without deleting it. Existing discussions then go inactive on the Teams side, and Teams users keep read access to older group chat messages but their new messages stop reaching Sidebar. Switching back on restores access for previously included users and adds newly included ones. Participant lists do not reconcile across repeated toggles, so membership stays as it was when the link last changed. Check the list after any toggle.

Domain separation is supported for Sidebar at the Standard support level, and it needs a parent-child domain hierarchy. Discussions are separated by their base task or interaction record, so a user sees a discussion only if they can see that record. Sidebar can be turned on or off per domain. The external integrations are the exception: domain separation is not supported on the Teams or Slack instance. The Teams Set up button is disabled, and one Teams instance cannot point part to one domain and part to another. The Slack Set up button is inactive for the same reason. Full domain behaviour also needs the Vancouver and August versions of the Sidebar store app, and a team that first used Sidebar in Vancouver and wants domain separation finds Sidebar inactive by default and has to switch it on for each domain. For the wider concept, see the domain separation explainer.

Setup choices that change what agents see

The discussion subject mapping decides which field fills a new discussion’s subject. The default is the short description. You can define several mappings per table, and the system runs them in descending order of their order value. The requester mapping names the main contact for a record, the person who receives the email reminders about unread messages from the previous 24 hours.

The Sidebar member query pre-fills the participants list. Its type is Pre-fill, which adds all members of the assignment group, or Search, which adds only members of the assignment group. Conditions use the simple condition builder or JavaScript. Participant suggestions are separate: they propose knowledgeable users and groups, and the admin decides who counts as knowledgeable. Permissions are set per group, not per individual user, so anyone who should see suggestions must belong to an allowed group. For the grouping logic behind assignment, see the assignment group explainer.

Admins configure Sidebar under Conversational Interfaces, and it belongs to the Omni-Experience Standard Feature Set.

Frequently asked questions

Can Sidebar connect to Teams and Slack together?

No. Sidebar integrates with Microsoft Teams or with Slack, and the two cannot run at the same time.

Does a Teams user need a ServiceNow login to join?

No. They need a Teams account and are added through the Teams group chat.

Who can read a private discussion?

Only the agent who started it and the participants in it. Participants can invite others who have access to the record, and private discussions stay out of search results for everyone else.

What happens to a removed Teams user’s messages?

They can still open the Teams group chat and read earlier messages, but they can no longer post in the discussion. Removal limits future participation, not history.

Will someone get an email about messages they missed?

Yes, if messages stay unread for 24 hours, Sidebar sends a reminder to resume. A reminder also goes out when a requester is added to an existing discussion.

Does Microsoft charge per message?

Microsoft applies a rate charge to each Teams API call, and messages in both directions count. Lookups, presence and reactions do not. The charge goes to the customer through their Azure account.