OBLYTECH Logo
OBLYTECH Logo

ServiceNow Workflow Data Fabric Hub: Tables and Connections

A data fabric table in Workflow Data Fabric Hub is a table definition that reads records from an external source or local table in place. The definition lives on your instance, and records are fetched when a list or form opens. Creating one needs admin, or a data steward or connection admin role with delegated developer, plus an established connection.

How a data fabric table reads external records

A data fabric table holds the column layout, labels, an optional primary key and a link to a source. The records stay where they are. When a user opens the table, the platform queries the source through a zero copy connection and holds the returned rows in memory while that list or form is on screen. Closing the view purges them, so the next open sends a new request.

The design shapes the setup decisions that follow. Nothing is copied, so the table reflects the source at the moment of viewing and the instance carries no import schedule. The trade-off is that the source answers each open request, so a slow connection shows up on the user’s screen.

The closest comparison is a remote table. Both expose outside data, but they differ in ways that matter when choosing between them.

Aspect Remote table Data fabric table
How records arrive A script populates the table A zero copy connection queries the source directly
Writing back to the source Possible on the remote table Viewing is supported; inserts, updates and deletes are not

The Hub also sits beside Integration Hub. Use the Hub to read live external data without storing it on the instance. Use Integration Hub when the job needs to import or stream data, or to build a custom integration. It needs a separate subscription.

Roles that control who builds tables and connections

The connection admin role, named df_connection_admin, creates and manages connections in the Hub, and it can also manage data fabric tables. The data steward role, named df_data_steward, is the role for creating and managing data fabric tables. Creating and managing connections is the connection admin role’s job.

Role inheritance changes what a user can do. A user who holds a role that contains df_data_steward counts as a data steward and can build tables. A user who has df_data_steward granted directly can open the Hub but cannot create or manage tables. Check the role path before assuming a steward can work.

Activating the Hub plugin, identified as sn_data_fabric, requires the admin role. When domain separation and delegated administration are enabled, the administrator performing the installation must sit in the global domain, or the install stops with a message about another plugin operation.

Building a table inside an application scope needs the delegated_developer role with the application scope’s sn_dd_<application_scope_name>_tablesforms or sn_dd_<application_scope_name>_delegatedadmin role, plus a role that contains df_data_steward or df_connection_admin. Creating a table in the global scope requires the admin role.

Reading connection status before you build a table

Each established connection shows a status on the Established connections tab, and the status tells a steward whether a table can be built on it yet.

Status What it means Typical next step
Connected The connection was tested and is working Map data to a table
Needs mapping The connection works, but no data is mapped to a table Create a data fabric table
Needs configuration Attributes or authentication details are missing Complete the connection details
Not connected Details exist, but the source does not respond Review the details with the source administrator
Deactivated The connection admin has switched it off Reactivate the connection

Access is granted at the connection level before any table exists. The connection admin opens the Access Controls tab of an established connection and grants the df_data_steward role to one or more roles.

Creating a data fabric table from an established connection

Start from the established connection, opened from All > Zero Copy Connector Hub > Established connections or from Admin > Zero Copy Connector Hub > Established connections.

  1. Open the Data assets tab and select the source table you want to read.
  2. Select Create data fabric table, enter a label, and continue.
  3. Map one or more source columns. Each selected column is created in the new table with the same name and data type as its source.
  4. Optionally define a primary key, using the Primary Key toggle.
  5. Optionally add references to other tables.
  6. Select Finish. Data consumers can then read the table like any physical table.

Step 4 needs the closest attention, because a primary key cannot be removed once it is defined.

Choosing a primary key

A primary key identifies records and lets other tables reference the column. When the source already has a primary key, the platform copies it into the new table. When the source has none, pick a column with unique values and mark it as the key.

Three details matter. A primary key does not enforce uniqueness on either side, so the team has to verify that the values really are unique. Once defined, a primary key cannot be removed; changing it means deleting the table and creating it again. And a table without a primary key cannot be referenced, and its searches do not work until a key exists.

Adding references to other tables

References create relationships between tables. A data fabric table can reference another data fabric table or a local table, and a local table can reference a data fabric table. A reference column cannot be a primary key.

Referencing a local table, such as the user table named sys_user, requires an instance administrator to create a record ACL rule with the data_fabric operation on that table. A reference column displays values when the referenced column has its Display attribute set to true. The referenced table needs a primary key column with unique values whose data type matches the source column.

To set a reference, change the column type to Reference, choose Set reference, enter the table name and select the reference key. The list shows tables with a single primary key, and a composite key cannot serve as the reference key.

Changing mappings, connections and the table lifecycle

A steward revisits a mapping when the external schema changes, when a column name confuses users, or when a new relationship is needed. Open the table from the Data fabric tables tab and select Edit. You can add source columns, which are created with matching names and types, or clear the check box for columns to remove. A column’s label can be renamed, but its underlying column name stays the same. If another table will reference the current one, a primary key must be in place first.

The Change connection action points a table at a different source. The steward needs a role that contains the df_data_steward role on both the existing connection and the new one. Two situations block the change. A table with multiple primary keys must keep its current connection, so moving it means deleting and rebuilding the table. A table whose connection still needs configuration, or is deactivated, cannot switch until that connection is configured or activated.

Deleting a table removes it from the instance, and its data is no longer available there. Moving a table configuration to another instance works through an update set that carries the identification and column mapping. The connection admin must then re-establish the connection on the target instance.

Viewing records and the query lifecycle

Viewing records needs read access to the table and no special role. Open the Data fabric tables tab, use the More Actions icon on the table, and select Open list. The platform queries the source and opens the table in list view.

Retrieved data has a short life. A new query goes to the source each time the table is viewed, the data stays in memory while the list or form is open, and it is purged once the view closes. Each view is a new request to the source, so a table that people open often adds that load, and the source team should know which tables carry it.

Some limits are easy to miss. Source table names must not differ by letter case alone, because a schema holding both a name and its uppercase twin will not load.

How Workflow Data Fabric differs from Integration Hub

Workflow Data Fabric reads external data in place through zero copy connections, so records stay at the source until someone opens a list. Integration Hub moves data, handling imports, transformations and custom integrations. Many designs use both: the fabric answers live reads, while Integration Hub handles imports and custom integrations.

Reading in place versus moving data into the instance

The deciding question is whether the instance needs its own copy of the records. Integration Hub is the choice when the instance must store, reshape or import data. A data fabric table is the read side of the split: its definition sits on the instance, but the rows do not.

A three-question test for each source

  1. Does the process need the records on the instance? If reporting or history depends on a stored copy, the answer is Integration Hub.
  2. Does anything write back to the source? Check each connector’s read and write behavior before you assume a data fabric table can insert, update or delete.
  3. How fresh must the data be at the point of use? Every open queries the source again, so the cost of freshness lands on the source system. A scheduled integration reflects the most recent run, which is often the better trade when a source is costly to query on every view.

How the two sit side by side in one design

One arrangement that fits this split is a service desk that shows live order status from an external ERP through a data fabric table, while an Integration Hub action creates the order when a requester submits it. The read stays in place and the write goes through a built integration. Teams that expect the fabric table to handle the write can find the gap late, because the table is read only by design, so settle the split in the design review rather than after go-live.

Entitlements and connectivity to check first

As of November 2026, Integration Hub needs a separate subscription. Connector and data-consumption entitlements vary, so check what your subscription covers before you design around a connector. On connectivity, the Brazil release, generally available since 5 November 2026, lists a private reverse-tunnel relay that extends Zero Copy access to on-premises sources without inbound firewall openings, VPNs or public endpoints as a Foundation capability. Confirm your source’s network path is covered before you promise a live read.

What to ask for before you sign off a design

  • A row for each source stating whether it is read only, read and write, or import only.
  • The freshness the business needs, set beside the freshness the schedule delivers.
  • The entitlement each connector requires, checked on your instance rather than assumed from the product name.
  • A named owner who accepts the query load each fabric table places on the source system.

Frequently asked questions

Does a data fabric table store a copy of the external data? No. The definition is kept on the instance, and records are retrieved from the source each time the table is viewed. Retrieved records stay in memory while the list or form is open.

Who can change the connection behind a table? A user with a role that contains the df_data_steward role, on both the current and the new established connection, can change it. The change is blocked when the table has multiple primary keys, or when the table’s current connection needs configuration or is deactivated.

Can I edit data in an external source through a data fabric table? No. A data fabric table lets users view external records, and inserts, updates and deletes are not possible through it. That is one of the main differences from a remote table.

Can I change a primary key after the table is created? Not once it has been defined. The table has to be deleted and recreated to use a different key, so verify uniqueness before the table is built.

What should happen when the source changes its schema? Column changes are handled through the update mapping action, where columns can be added, removed or relabeled. Before a connection is updated, the connection admin should check the source details with the source administrator.