OBLYTECH Logo
OBLYTECH Logo

Zero Copy ServiceNow: How Zero Copy Connectors Read External Data

Zero Copy Connectors lets the ServiceNow platform read data held in external systems without copying it onto the instance. A connection admin creates a zero copy connection to a source system. A data steward maps source tables into data fabric tables, which appear in lists and forms. External records are held in memory for as long as the list or form stays open.

Reading external data without copying it onto the instance

A zero copy connection reaches data that stays where it already lives. The platform queries the source system itself. Each time a data fabric table is opened, a new query goes to the source, and the rows are purged from memory once the list or form closes. Nothing is stored on the instance to go stale. For the broader design choices behind this kind of read, see integration patterns.

The trade-off is speed. A list’s responsiveness depends on how fast the source answers, so that should be checked before a table goes in front of many users. If you need the records held on the instance instead, see import sets.

A data fabric table is a virtual representation of data held elsewhere. Its definition, covering columns, labels, keys and references, lives on the platform, while the records stay at the source. The table belongs to the application scope the steward chose when creating it.

The table reads the rows each time it opens. A remote table is filled by a script, but a data fabric table uses a zero copy connection instead, so no populating script is needed.

Installing the hub and the Zero Copy Connectors application

Two plugins sit behind the feature. The Zero Copy Connector Hub (plugin sn_data_fabric) is the workspace for connections and tables. The Zero Copy Connectors application (sn_data_fabric_zcc) gives the full experience, and activating it installs the hub automatically. The hub was renamed from Workflow Data Fabric Hub in the Australia release, so older screens and records may use that name.

To install the hub on its own, an admin goes to All, System Applications, All Available Applications, then All, filters for the plugin by name or ID, and selects Install. For the full application, the admin selects Request plugin from the same screen, which opens an Activate Plugin form on Now Support. The plugin name is Zero Copy Connectors (sn_data_fabric_zcc), and the admin chooses a maintenance window. The install then appears on the Installed tab of Application Manager.

Two conditions catch people out. The application is not supported on demo instances. And when domain separation and delegated admin are both enabled, the installing admin must sit in the global domain, or the install is blocked. Australia Patch 1 also added a package that installs primary connectors alone, sn_zcc_primary, next to the combined package.

Roles for connections and tables

Role What it lets a person do
df_connection_admin Create, test, update, deactivate, reactivate and delete connections, view connection logs, and grant steward access
df_data_steward Create and maintain data fabric tables on connections the steward can reach
Delegated developer role for a scope, plus a steward or connection admin role Create data fabric tables inside that application scope

Creating a table in the global scope needs admin rights. Users holding either delegated developer role are given read access to the table’s records automatically.

Steward access comes through custom roles. On the connection’s Access Control tab, the connection admin adds a custom role, and that role inherits df_data_steward. A user granted df_data_steward directly can see the hub but cannot open any established connection. One workable setup gives each application its own connection and custom role, so IT stewards and finance stewards each manage only their own application’s external data. For the wider access model these roles sit inside, see instance security and access control.

Primary and community connectors

Family Who develops and supports it Detail
Primary ServiceNow develops, makes available and supports it Tuned so the majority of queries can run at the data source
Community Open-source community, made available by ServiceNow Carries certification for essential functionality, but sits outside ServiceNow’s support scope

Primary connectors are the family to choose when a supported path matters. REST connectors for Oracle HCM (Discovery) and Acumatica, which in the Brazil release use filter, limit and groupBy pushdown and need network connectivity to the target. Databricks and Snowflake can authenticate with each user’s own credentials instead of a shared service account. MySQL moved to the primary list with a Preview label, meaning enhancements are still under way, and PostgreSQL moved there too. For the general REST and SOAP side of the platform, see REST and SOAP integrations.

Creating a connection and its data fabric tables

Connections come from the connector catalogue. In the Acumatica example, the connection admin opens Available connectors, goes to Primary connectors, selects Connect, and completes a form with a label, a description and a connection alias. The connection name is generated from the label and cannot be changed once established, so the label is worth getting right. Connect runs a test against the source. Acumatica also needs the REST Config Framework plugin and the Acumatica plugin installed first. For background on how connection and credential aliases are handled, see connection and credential aliases.

A steward then builds a table from the connection:

  1. Open the established connection and select the Data assets tab.
  2. Select the source table and choose Create data fabric table.
  3. Enter a label and select Continue.
  4. Select the source columns. Each keeps its name and data type.
  5. Optionally, set a primary key, and add references to other tables.
  6. Select Finish.

Consumers then read the table like any physical table. Before step one, select a source table on the Data assets tab and open its Data fabric tables sub-tab to check whether it already has a mapped table.

Source names are matched exactly. If a database holds MY_TABLE and my_table, the schema will not load. Later edits can add or remove columns and change labels, but the underlying column name stays as mapped.

Primary keys and references

Source keys carry over automatically. If the source has none, the steward picks a column with unique values. Designating a key does not enforce uniqueness on either side, so the steward has to confirm it. Once set, a key cannot be removed, and changing it means deleting the table and building it again.

A table without a primary key cannot be referenced, and searches on it do not work until one is defined. Choosing the key at the start avoids that rework.

A reference links two tables. The reference key must be a single column, and the referenced table must have exactly one primary key. Key and source column must share a data type. To reference a local table, an instance administrator creates a record ACL rule with the data_fabric operation on it. To show referenced values rather than raw keys, the display attribute must be set on that column.

Managing connections and mappings after go-live

Each connection shows a status on the Established connections tab.

Status Meaning
Connected Tested and established
Needs mapping Working, but no data is mapped to a table yet
Needs configuration Attributes or authentication details are missing
Not connected Details entered, but the connection is not working
Deactivated Switched off by the connection admin

Test connection is the first check. On failure, the advice is to consult the database administrator about attributes and authentication. The connection log, opened from the more actions menu, shows the day’s entries from the Data Fabric Logs table and is where failures usually show up.

Changing the URL, service account, authentication method or private key can alter the mapping of each table built on the connection, so the data source administrator should be consulted first. Save and connect tests the change and saves it when the test succeeds. Deactivating a connection stops its queries, and tables on it show no external data until it is reactivated.

Stewards revisit mappings when the source schema changes, a field name is wrong, or a new relationship is needed. A table can move to another connection, but both connections need the steward role, and a table with more than one primary key stays on its current connection.

Limits to plan around

  • The application is not supported on demo instances.
  • Source names that differ in letter case alone stop the schema from loading.
  • Primary key constraints are not enforced, so uniqueness is the steward’s job.
  • A primary key cannot be removed once set.
  • Changes made at the source appear the next time a table is opened.
  • REST connectors need network connectivity to the target, which may take work with the network team.
  • Connectors with a Preview label, such as MySQL in the Brazil release, are still being enhanced.

Can Zero Copy reach on-premises data without opening inbound firewall ports, and how do we see what a change affects downstream?

Yes, in the Brazil release. Zero Copy can reach on-premises sources through a private reverse-tunnel relay, and the relay needs no inbound firewall openings, VPNs or public endpoints. Lineage and graph views then trace where a table’s data came from and which consumers a change could reach, though that view depends on Workflow Data Fabric capability and entitlement.

How the relay changes the network conversation

The name describes the direction of traffic. Because the relay needs no inbound openings, the design should not depend on an inbound rule. Confirm that with the people who own the perimeter. Ask the security team whether any outbound path needs approval, and raise it in the security review.

What to check before the design is approved

  1. Confirm the instance is on a release that includes the relay. As of November 2026, the feature is listed for Brazil, so an instance on an earlier release is outside what this section covers.
  2. Record each on-premises source with its host, port and database engine.
  3. Write down the outbound path the security team will approve, including any proxy or egress allowlist.
  4. Decide who owns the source credentials, how they rotate, and who is told when a rotation fails.

Seeing what a change affects downstream

Lineage answers the question that matters before a change: what reads this data, and what breaks if it moves.

  1. Start from the data fabric table that will change and trace it back to its source.
  2. List every consumer that reads the table, including reports, flows and other tables that reference it.
  3. Note which team owns each consumer before you plan the change.
  4. Where lineage is not available, build the same list by hand from each table’s references and each consumer’s definition. Treat the list as a snapshot and re-check it at each release.

Governed data products as a change boundary

Governed data products, introduced in the Brazil release, give a team a way to publish curated data under access controls and quality rules meant for people and AI alike. Publishing a product rather than a raw table gives the review one named boundary to inspect. The release guide does not say whether a source change is checked against those rules, so test one product first.

Questions to put to ServiceNow before you commit

  • Which release and patch level first include the relay, and which entitlement level it sits under?
  • Which lineage views are included in our Workflow Data Fabric entitlement, and do they cover the tables we plan to build?
  • Does the relay log outbound sessions, and where do those logs appear for the security team?
  • What happens to each table and its consumers when the relay goes down, and how is that alert raised?

Frequently asked questions

Does Zero Copy Connectors copy data into the instance?

No. The platform queries the source each time a data fabric table is opened. Rows are held in memory while the list or form is open and are purged once it closes.

Who can set up a connection?

A person with the df_connection_admin role can create, test, update, deactivate and delete connections. Steward access is granted separately, through custom roles on the connection’s Access Control tab.

Can a user change the source data through a data fabric table?

Make changes in the source system itself. The next time the table opens, it shows the updated values.

Why does a table need a primary key before other tables can reference it?

A reference needs a single key column, and the referenced table must have exactly one primary key. Without one, the table cannot be referenced and searches on it do not work. Designating a key does not enforce uniqueness, so the steward still has to confirm the values are unique.

More ServiceNow guides on this topic