Workplace Calendar Synchronization keeps workplace reservations in step with employee calendars. It connects Workplace Reservation Management to Microsoft Exchange Online, Google Calendar or Microsoft Exchange On-Premises, and syncs reservations in both directions. The setup path depends on which calendar service you run, so each one is covered separately below.
What the synchronization does day to day
A booking made in the reservation portal is written to the calendar and blocks the date and time. A meeting created on the room’s calendar comes back as a reservation, with its details tracked in Workplace Reservation Management. For the booking workflows around this, see ServiceNow workplace service delivery workflows.
Each reservation action creates an event. A create event is raised when a booking is made, an update event when a reservation changes or is checked out, and a delete event when it is canceled or recorded as a no-show. Events start in a New state and move to Processing, Processed or Error. The payload shows the booking in portal format, the provider payload shows it in the calendar’s format, and the response records the provider’s answer. The No request mechanism builds event payloads without calling the calendar provider, which lets you check their JSON first.
Choosing the setup path for your calendar service
| Calendar service | How changes reach ServiceNow | What the setup needs |
|---|---|---|
| Microsoft Exchange Online | Subscriptions created for each active room, with callbacks when a room changes | The Exchange Online spoke, connection and credential aliases, and OAuth for the chosen mode |
| Google Calendar | Delta synchronization run by the WSDRS Sync Calendar items job | The Google Calendar spoke, OAuth with Google, and a connection and credential record |
| Microsoft Exchange On-Premises | Delta synchronization through a MID server on the same local network as Exchange | The Microsoft Exchange Server spoke, a MID server connection, and an on-premises provider |
A multi-provider setup for Exchange Online uses several connections and credentials. It is a different arrangement from an Exchange hybrid configuration. For the wider workplace context, see ServiceNow workplace service delivery.
Exchange Online: spoke, integration modes and provider records
Install the Microsoft Exchange Online spoke from the ServiceNow Store first. From version 2.0.1 of the application, Exchange Online changes reach ServiceNow through webhooks only.
After installation, open the Exchange Online Calendar data source and confirm its Data Stream action field is not empty. If it is empty, repair the Microsoft Exchange Online Spoke plugin from All > System Definition > Plugins, provided the site has no internal dependency on the Data Stream action plugin. Three integration modes are set in the Exchange Online Sync Integration Mode property under All > Workplace Calendar Synchronization > Properties. Normal mode manages all reservations in Outlook with admin client credentials. Strict mode uses a dedicated strict mode user connected through an authorization code. Personal mode gives each user a personal token for their own bookings.
In strict mode, events are not created in the employee’s own calendar. They go to a general mailbox, the requester is treated as an invitee, and employees make changes through Workplace Reservation Management. Add calendar providers under All > Workplace Calendar Synchronization > Configuration > Calendar Providers. The delegated user email must be the address of the delegated service account, and it stays empty in Normal mode. Calendars synchronize successfully when the email address matches the provider, so check the match before you save.
Subscriptions, aliases and the instance scan
Activating a reservable sync configuration creates a subscription for that room automatically. Subscriptions exist for active configurations, and a webhook registry stores the callback details they use. If a renewal fails, users with the rsvsync_admin role receive a notification, and a daily job checks for failed subscriptions.
When a connection fails, check the alias first. The application uses the override alias on the provider record when one is mapped, and otherwise the default alias for the processor. The alias needs a connection, a credential, an OAuth entity profile, scopes and an application registry, all active. A missing component on the alias, such as the OAuth entity profile or the application registry, causes token and API call failures.
Check the grant type on the credential too, because a mismatched grant type is a common cause of authentication failures. For authorization code credentials, select Get OAuth Token and sign in as a user with read or write access to the room calendars. In personal mode, leave the personal credential alone, because each user’s token is generated when that user first interacts with the feature.
To verify the setup, run the Instance Scan suite named Workplace Calendar Synchronization Configurations from All > Instance Scan > Suites. It runs four checks covering reservable sync configurations, active providers, the webhook registry and provider configuration. Fix each finding, then select Rescan. The role needed is sn_wsd_rsvsync.admin.
Google Calendar: Google setup and OAuth
A Google Admin creates a project in the Google Cloud console, enables the Google Calendar API, and completes the OAuth consent screen. Add two scopes, one for calendar access and one for calendar events. Create a web application OAuth client with your ServiceNow instance as the authorized redirect URI, then save the client ID and secret.
In ServiceNow, open All > System OAuth > Application Registry and connect to a third-party OAuth provider. Enter the client ID and secret, set the default grant type to authorization mode, and enter Google’s authorization and token endpoints. Add two OAuth entity scopes, named calendar and calendar.events, and attach both to the default profile.
Then create the connection and credential record in Flow Designer and add the Google calendar provider. Google Calendar does not support strict mode, and the Exchange Online sync mode property does not apply to it. To sync past bookings, turn on Synchronize past reservations and select Sync Location on each reservable sync configuration.
Exchange On-Premises: MID server and delta sync
On-premises Exchange is not reachable online, so a MID server on the same local network carries the traffic. Connect the MID server to ServiceNow, create a connection and credential alias, install and set up the Microsoft Exchange Server spoke, then configure the provider using the Microsoft EWS calendar processor.
On the provider form, page size sets how many changes each page of results returns. The form also sets the sync batch size to 500 items and the batch interval to 60 seconds automatically. If several delegated users manage different rooms, create one provider record for each user, each with its own token and alias.
Changes travel by delta synchronization. For each reservable sync record, the application keeps a synchronization token in the Sync Deltas module. The token marks the point up to which changes have been read, and it is created when the record is activated. Each run of the WSDRS Sync Calendar items job asks for changes after that point, stores them as events, creates the reservations and moves the token forward. The job is switched off by default, so enable it before anything syncs.
Past bookings need the Synchronize past reservations option, a start and end date, an active provider and an active reservable sync configuration. The past sync window must stay within 1,825 days, and keep reservations in any one sync to no more than 1,000 per room or resource. For a larger history, adjust the sn_wsd_rsvsync.ewsPastSyncPeriodInMonths system property so each sync covers fewer months.
Scheduled jobs and declined events
| Scheduled job | Default state | Repeats | Purpose |
|---|---|---|---|
| Clean-up Awaiting/Rejected Reservations | Active | 5 hours | Clears reservations stuck awaiting confirmation after a rejection |
| Create and Update Reservations from Events | Active | 1 minute | Inserts or updates reservations from Exchange Online events |
| Export reservations to calendar | Inactive | 15 minutes | Creates events for existing reservations not yet on the calendar |
When Outlook rejects an event, its reservation can stay in an awaiting state for more than five hours. The Clean-up Awaiting/Rejected Reservations job clears reservations stuck that way and repeats every five hours by default, so check whether that interval suits your booking volume.
Outlook add-in and room visibility
The Workplace Reservations for Microsoft Outlook Add-in lets employees reserve a space from inside Outlook. From Workplace Reservation Management version 3.0.2, employees no longer need a separate Outlook plugin, because the advanced search widget handles add-in reservations. Workplace Calendar Synchronization must still be installed and configured. For the Microsoft 365 side of that boundary, see Microsoft 365 integration boundaries. Employees can select multi-building spaces, browse near a person, and edit existing bookings.
Limits apply. The add-in does not support Microsoft Exchange On-Premises. Outlook on the web does not support it in Apple Safari, so use Mozilla Firefox or Google Chrome. Locations appear when they exist in both Exchange Online and Workplace Reservation Management, and spaces must be defined as rooms in the Rooms table.
Frequently asked questions
Which calendar services does the integration support?
Microsoft Exchange Online, Google Calendar and Microsoft Exchange On-Premises, each with its own setup path.
Can an employee edit a reservation that was created in their calendar?
No. Reservations created through a calendar provider cannot be edited in Workplace Reservation Management, so changes to those bookings need a clear owner before go-live.
What does Exchange Online need before the sync works?
Install the Microsoft Exchange Online spoke from the ServiceNow Store, then confirm the Data Stream action field on the Exchange Online Calendar data source is not empty.
How often does on-premises calendar sync run?
The WSDRS Sync Calendar items job runs on a repeating schedule that you can change. It is switched off by default, so enable it before synchronization starts, and you can run it manually at any time.
What happens when Outlook rejects a calendar event?
The reservation can stay in an awaiting state after Outlook rejects the event, until the Clean-up Awaiting/Rejected Reservations job clears it.
Does the Outlook add-in work with on-premises Exchange?
No. The add-in does not support Exchange On-Premises calendars.