OBLYTECH Logo
OBLYTECH Logo

Review the life cycle of a problem task

To review the life cycle of a problem task, follow its movement from creation through assessment, work, and closure. A problem task represents a small, assigned piece of the work needed to resolve a problem. Check the state, the next available action, and the closure outcome together to understand progress.

Review the life cycle of a problem task by its decisions

A problem coordinator can divide an investigation into tasks and assign those tasks to groups or individual users. This lets specialists contribute to a shared problem without treating each investigation activity as a separate problem. For the wider process, see the plain-language guide to Problem Management.

The standard sequence uses New, Assess, Work in Progress, and Closed. It includes decisions as well as forward movement: work can return for assessment, and a task can close because it was completed or canceled. A review that looks at Closed without checking the Close code loses that distinction.

The state-based approach has an instance qualification: It is available for new instances starting with Madrid through the Problem Management Best Practice — Madrid — State Model plugin. Existing users cannot activate that plugin directly. They move to the base problem life cycle with the Problem Management Migration Utility, which verifies records before migrating them. The steps below use Brazil behavior; check your instance and release, including any configured Problem Management models, before applying the sequence.

Create a task with an assessable scope

In the platform interface, creating a problem task requires one of these roles: itil, sn_problem_write, admin, problem_admin, problem_coordinator, problem_manager, or problem_task_analyst. Navigate to All > Problem > Open, open the relevant problem, select Problem Tasks in its related list, and select New.

Choose Root Cause Analysis when the assignment concerns investigating the cause and a proposed fix. Choose General for other work. Complete the form and select Submit. The resulting task enters New, or moves directly to Assess when the mandatory information for that transition has already been supplied.

For example, a coordinator investigating recurring application failures might ask a database specialist to examine a suspected connection issue. As a working practice, make that assignment specific enough to produce a finding: which symptom to investigate, what evidence to examine, and what question the specialist should answer.

A task arriving in Assess immediately is therefore not necessarily skipping a review step incorrectly. Inspect its information before treating that state as a defect. If the task is too broad to judge, clarify its boundaries before starting work. The guide to problem root cause analysis covers the investigation that these assignments support.

Use assessment to decide whether work should start

Assessment requires problem_admin, problem_coordinator, problem_manager, problem_task_analyst, or admin. Select Assess to place the task in Assess. Examine whether the assignment contains enough information to proceed and whether doing the work still makes sense.

A review can use three questions: is the activity understandable, is the necessary evidence available, and would its result help the parent problem? The three questions below are a working practice, not system fields. They help separate a task that is ready for execution from one that needs clarification or has become unnecessary.

When the assignment is ready, select Start Work. The state changes to Work in Progress. If work reveals that the assignment needs another assessment, select Re-asses to return it from Work in Progress to Assess. Preserve that on-screen spelling when identifying the action for this transition.

The assessment step also decides whether the task should exist at all. The Assess procedure asks you to confirm that there is enough information to work on the task, or to cancel it when it is a duplicate or no longer needed. Start Work moves the task to Work in Progress. Re-asses returns it from Work in Progress to Assess. Cancel prompts for a Canceled reason and then closes the record with the Close code set to Canceled. Once the work is finished, the task is completed as resolved, so the decision recorded at assessment shapes how the closure reads later.

Distinguish completion from cancellation

Completing a task requires admin, problem_admin, problem_coordinator, problem_manager, or problem_task_analyst. Select Complete to move the task to Closed with Close code set to Complete. Before doing so, a sensible review practice is to compare the result with the question originally assigned.

A finding that rules out a suspected cause still completes the assigned investigation, provided the conclusion is recorded. Judge whether the assigned investigation was performed and its conclusion recorded, rather than assuming that completion means the entire problem has been fixed.

Cancellation is a different assessment outcome. For a duplicate or unnecessary task, select Cancel. The action asks for Canceled reason and closes the record with Close code set to Canceled. The assessment roles are problem_admin, problem_coordinator, problem_manager, problem_task_analyst, or admin.

Write the cancellation explanation so the coordinator can understand why that work no longer needs to proceed. A note identifying the overlap with another assignment is more helpful than a vague statement that the task was unwanted.

After all problem tasks are completed or canceled, the problem coordinator receives a notification. That notification concerns the tasks; do not interpret it as proof that the parent problem has been resolved. A review of broader outcomes belongs alongside Problem Management metrics.

Check reassessment and custom transition rules

Two Problem properties control this under Problem > Administration > Problem Properties. Can Re-Assess a Problem Task on a Closed Problem (problem_task.closed.can_reassess_on_closed_problem) defaults to false on new instances. Who can Re-assess a Completed or Canceled Problem Task (problem_task.closed.role.reaassess_from_closed) defaults to problem_coordinator. Check both before expecting Re-assess on a closed task. Where that behavior is configured, selecting Re-assess moves a Closed task to Assess. Confirm the setting before expecting this route to be available. In the classic interface, the Work in Progress action is labeled Re-asses on screen, so match that spelling there. Service Operations Workspace uses Re-assess for both Work in Progress and Closed tasks, so match the label to the interface you are using.

The Problem properties screen, reached through Problem > Administration > Problem Properties, holds the other switches that shape task work. Two are worth checking alongside the reassessment settings. The property problem.closed.can_create_tasks controls whether a Problem Task can be created on a closed problem, and it defaults to false. The property problem.closed.cancel_open_tasks controls whether open Problem Tasks are canceled when a problem closes, and it defaults to true. The reassessment property also differs by instance history: it is true on upgraded instances and false on new instances. A task that behaves differently from the process you expect may depend on one of these settings rather than on the task itself.

Custom Problem Management models can define a different process. Creating a problem task model requires admin. Open Problem Task Models through All > Problem > Administration > Problem Task Models, or use prb_task_model.list in the navigation filter. A model contains its selected states and the transitions between them.

When reviewing a model, inspect Initial state and the From and To values for each transition. The first state added has Initial state selected automatically. Review Automatic transition and any transition conditions as well: automatic transitions move the record when their conditions are met and prevent manual selection of State.

This changes how a reviewer should diagnose an unexpected state. First establish which model applies, then compare the observed movement with that model’s transitions. Repeatedly trying a manual state change will not explain a transition configured to run automatically. For help planning this work, see ServiceNow implementation.

Keep workspace creation and form layout in view

Creating a task in Service Operations Workspace requires itil or problem_coordinator. Open the problem and select Create problem task, or select New from the Problem Tasks tab. In the dialog, choose Root cause analysis or General, select Create, fill in the task form, and select Save.

Form configuration has separate permissions: admin or personalize_form. Use Configure and then Form Builder from the form context menu, choose Problem Task, and select the relevant view. Service Operations Workspace controls existing task forms; Service Operations Workspace New Record controls new task forms. If necessary, select Edit in original scope before editing.

When information appears during creation but seems absent later, compare those two views before changing the process. A layout issue and a transition issue need different checks. Include both creation and subsequent review in your Problem Management acceptance checks.

For acceptance testing, follow one task from the creation view into its saved form. Check that the information needed for the next decision remains visible. Record the starting state, selected action, and resulting state so a failed check identifies a specific transition rather than a general complaint.