OBLYTECH Logo
OBLYTECH Logo

Create a Work scheduler card using the Next Experience UI Builder

On a release before Brazil, create a Work scheduler card using the Next Experience UI Builder by opening Manager Workspace, locating the Work scheduler sidebar, and adding a card under Viewport1. Configure its data and components, then select the card in the work configuration’s UX app route field so it appears in the sidebar.

Check the deployment and define the card’s purpose

Work scheduler was deprecated from the Brazil release onward, and from that release it is no longer deployed, enhanced, or supported. The steps below cover the Customer Service Management procedure for releases before Brazil. Use them only on an instance running a release earlier than Brazil, and confirm your release before you start.

In Customer Service Management, creating a card requires admin, workspace_admin, or ui_builder_admin. In IT Service Management the role list is narrower: workspace_admin or ui_builder_admin. For Customer Service Management, these same role alternatives apply to the card customization, workItem property definition, container configuration, heading configuration, and work configuration association described below. Check the account performing those actions before opening the editor.

Decide what the manager needs to recognize without opening the work item. Write down the intended heading, identifying fields, and assignee information. Treat this as a short acceptance checklist: the card should make the record recognizable and expose the information needed for the scheduling decision.

Keep broader experience decisions separate from the card’s content requirements. If you also need to review the workspace context, use the guide to UI Builder portal and workspace experience settings. Resolve which experience you are editing before configuring its sidebar.

Create a Work scheduler card in UI Builder

  1. Open All > Now Experience Framework > UI Builder.
  2. Under My experiences, choose Manager Workspace, then select the Pages icon.
  3. Choose Work scheduler from the Page menu.
  4. In Content on the left, expand Body (Flex) > Work queue (Flex) > Sidebar.
  5. In the right pane, use the icon within the Work item cards default sub-page to open its configuration.
  6. Select Body (Flex) > Viewport1 in the left pane.
  7. Select +Add in the right pane and give the card a name. The Path field fills automatically.
  8. Select Create, then Done.

Choose a name that you can recognize when selecting the route later. Record the name alongside the work configuration that will use it. This small handoff detail matters because creating the card and connecting it to the queue are separate actions.

At this point, you have created the card, but its components and data still need attention. The card is finished only when the intended work configuration shows it with real record information. A new name in the editor shows that the card exists, nothing more.

Build the data flow before arranging components

Work queue data reaches the card through the workItem object. The setup sequence includes client state parameters, page scripts, the workItem page property, and event mappings before container and display component configuration. Follow that sequence so the visual components have data and interaction behavior to use.

Client state parameters hold values needed by the card components. Page scripts support updating client state through events and transforming the workItem object into component properties. Event mappings connect card interactions and property transformation to the page configuration. Plan these together rather than treating an empty label as a styling problem.

To define the page input, go to Page configuration and select Config. In Properties, choose Edit. In Edit properties, select +Add, enter workItem in Property name, and choose JSON from Type. Select Add and Save. Then use the Dynamic data binding icon on workItem to connect it to the corresponding workItem client state value and save.

Keep the incoming object separate in your thinking from the display values derived from it. For a proposed extra field, identify the source value and the component that should show it. That gives you a concrete trace to inspect if the value is missing when the card renders.

Before moving on, review three dependencies: the page can receive workItem, the scripts produce the required component properties, and the event mappings support the planned interactions. Before you move on, confirm three things: the page receives workItem, the page scripts produce the card properties, and the event mappings are in place. A card that renders does not prove the data flow works, so check the record values as well.

Add the container, heading, and supporting information

Use +Add component in Content and select Card Base Container. In Config, set Interaction to Click. Configure the accessibility binding through the Dynamic data binding icon in Accessibility, selecting the aria value from the cardProps client state object.

Next, open Events. Under Card clicked, select +Add a new event handler. In the Event handler preview, select Handle card clicked from Scripts, then select Add and Save. Check that the selected handler matches the click interaction you intend to test.

Add Card Base Header through +Add component. In Config, use Dynamic data binding for Dropdowns, Heading, and Tagline, connecting each to its corresponding cardProps value. Under Events, add Handle card action clicked to Card header action clicked, then select Add and Save.

Continue with the display information the manager needs. The setup includes Label value stacked for work item fields and a Container-based avatar arrangement for the assignee’s avatar and name. Establish the field requirements first so an extra component has a clear purpose.

Review the heading and identifying values together. A manager should be able to distinguish two similar records without relying on decoration. For broader appearance work, keep Next Experience themes and branding as a separate consideration from the bindings that supply record values.

Connect the card to the work configuration

Open All > Work Scheduler > Work configuration. Select the configuration intended to use your card. In UX app route, select the card name and choose Update. This association makes the configuration’s card display in Work scheduler in manager workspace.

Check the actual configuration record before changing the layout again if the new card is absent. Compare its UX app route selection with the name recorded during creation. A correctly assembled card still needs the association that places it in the sidebar.

Keep a short configuration record for the handoff: card name, intended work configuration, displayed fields, and the interactions you checked. Include a record example for each expected value. This is a recommended review aid, especially when one administrator prepares the page and another checks the manager’s workflow. If you want help planning a build like this before you touch the configuration, the ServiceNow implementation page is the place to start.

Validate the result and isolate failures

Use representative work items when reviewing the result. Choose records with different headings, field values, and assignment information so the check tests data changes rather than a single attractive example. Compare what appears with the acceptance checklist you prepared before configuration.

  • If the card is missing, inspect the selected UX app route on the intended work configuration.
  • If a visible card lacks information, trace the incoming workItem through client state and transformation to the affected component.
  • If the heading or tagline is wrong, inspect that header property’s binding before changing its placement.
  • If a click fails to produce the intended interaction, review the component event and its selected script handler.
  • If the content is hard to scan, reconsider which fields deserve space before adjusting presentation.

Separate a missing value from an unwanted value. An empty field calls for a data-flow check; a correctly populated field that managers do not need calls for a content decision. Keeping those diagnoses distinct makes the next edit easier to justify.

For access planning around related experience work, see UI Builder experience roles. Keep the role requirements for this specific card procedure attached to the actions above when handing the configuration to another administrator.

When reviewing a change, alter one dependency at a time and repeat the affected check. For example, after correcting a heading binding, compare the heading across two work items before changing the container. After correcting an event handler, test the corresponding interaction before adding another field. Record the observed result beside the expected result so the next administrator can distinguish a completed check from an assumption.

Ask the manager reviewing the card to identify the record, explain the displayed fields, and try the intended interaction. Capture any mismatch as a specific requirement, such as a missing identifying value, so the next revision addresses a scheduling need rather than a general request to improve the appearance.

Duplicate an existing variant to change a card

Can I start from an existing work item variant?

Yes. The customization workflow supports duplicating an existing variant, including examples such as Incident, Problem, or Change Request. Choose that approach when the existing card provides the starting structure you want to retain.

Where do I duplicate the selected variant?

Select Body (Flex) > Viewport1, then in the right pane select the icon next to the card you want to change, such as Incident default. In the left pane, find the Variants section. Hover over the variant, open its icon menu, and select Duplicate. Work on the duplicated variant for the planned customization.

How do I make the duplicated variant take precedence?

Open the duplicated variant’s menu and choose Edit conditions. Set Order to the lowest value so that variant displays in manager workspace, then select Save. Work scheduler displays one variant for a work item type.

Which configuration task should I inspect when adding a field?

Review the Create the Transform workItem to cardProps page script steps as part of the page-script work. Adding a field involves the transformation that prepares component properties, as well as deciding where the resulting value belongs on the card.