OBLYTECH Logo
OBLYTECH Logo

Branding Next Experience with Theme Builder Themes

Branding Next Experience comes down to one theme record. Theme Builder, included and available by default, sets the brand palette, logo, typography and shape, previews them, and publishes the result so users can select it. Unified Navigation styling and custom style records extend the same theme where standard controls fall short.

What Theme Builder covers and who can use it

Theme Builder is a core plugin that arrives with Next Experience. It is the workspace for creating and managing themes for web and mobile experiences, and it works without writing code. The Manager page lists your themes, and the Editor page is where visual details are set and previewed in real time.

Editing and publishing a theme require the ui_builder_admin role, which also covers Unified Navigation styling. Writing a custom style record in raw JSON asks for the admin role instead, so confirm your role before you plan the change.

Polaris and Coral, the two base themes, are fixed and cannot be copied or edited. Coral is enabled by default on customer instances, and upgrading customers keep the theme they already had. To brand the interface, copy a Theme Builder theme record and apply your changes to the copy. The base themes stay untouched, which gives you a fallback.

Building the brand palette in the Editor

Opening a theme in the Editor generates Global styles that apply across the whole theme: a brand palette for interface colors, a logo, a typography record for fonts, and a shape record for component corners. Work through the four generated global records (palette, logo, typography, shape) one at a time, previewing after each. Then upload the logo, which you can also do from the Overview page during theme application, set the default font, and adjust the corner shapes. Typography sets the fonts for headlines, titles, subtitles, body text and captions.

Component styles and image styles go further. Component styles adjust individual pieces such as buttons, form controls and navigation without changing the global settings. Image styles change the color scheme of illustrations or replace default illustrations with your own.

Layer What it changes Typical use
Global styles Palette, logo, typography, shape Whole theme, set first
Component styles Buttons, form controls, navigation One UI element at a time
Image styles Illustration colors and custom artwork Replacing default illustrations

Previewing a theme before it reaches users

The Experiences tab in the Global styles panel opens a chosen experience in a new tab with your selections applied. For a published theme, that preview runs on live data, so edits made there reach your instance. Make significant changes on an unpublished copy, check them in the preview, and publish once they are right. Use the Accessibility Inspector to confirm that text has enough contrast against its background, which matters when a brand color looks strong alone but reads poorly on a light card.

Managing themes, variants and alternate palettes

The Manager page separates published and unpublished themes, and each section can be viewed as a grid or a list. The More actions menu offers duplicate, delete, add alternate color palette, unpublish and mark as default. Unpublishing removes a theme from active use without deleting it, so it can be edited and published again later. Delete removes the theme permanently, so duplicate a theme before a risky change. An alternate color palette is a different scheme attached to the same base theme, and Edit group name renames the base theme together with its palettes.

Variants work at the style level. A core style is active by default. A variant is an alternate version that users can choose in their Theme preference, and it overrides the core style when chosen. The dark theme is the variant shipped with Next Experience, and Polaris and Coral both include it. Theme Builder does not generate dark variants automatically, so a dark look is built as a dark alternate color palette, which offers limited customization.

Styling the Unified Navigation header and menus

Open the theme in the Editor, select the Component styles tab, switch to Editing, and filter for the Unified Navigation under the Navigation category. Double-click the component or choose Style subcomponents, then select the Header or Menu tile. The header takes background colors, while a menu takes background, text and icon colors. Each subcomponent has interactions, such as the default and hover states of the menu trigger, and each one is styled separately. For a menu, use Component config and the Type drop-down to choose the specific menu.

After you save a color, a Remove override symbol appears, and selecting it returns the color to its auto-generated value. In the Theme Builder 5.0 release, editing is limited to the header and menus, so judge the finished result in the preview.

Publishing, ordering and choosing the default

Publish from the Manager page by using More actions on an unpublished theme, or by dragging it into the Published section in list view, then confirming. Users still have to select the theme from their Theme preference, so refresh your browser and check the list.

Several themes can be published to a web instance, but a mobile instance carries one published theme at a time. For a mobile application that needs its own look, Mobile App Builder can publish a theme to that application.

A single published web theme becomes the default automatically. With several, choose Mark as default. The default appears first in the Theme preference and is the view users see until they choose otherwise. Publishing also adds each theme to the UX Parent App Theme table, which stores the audience, order and application scope for it. An empty audience applies the theme to all users, and the lowest order in that table is treated as the default. Themes made in the mobile legacy UI or the Core UI cannot be edited in Theme Builder, so recreate them there.

Writing custom style records when standard controls fall short

For finer control, a Next Experience style is a record of overrides on top of the default Polaris or Coral style. In its Style field, which is raw JSON, the base block holds the main colors as RGB values, and the properties block holds color variations, shape overrides and typefaces. Save between steps, because invalid JSON stops a theme record from saving.

Order and applicability decide which style wins. A higher order overrides a lower one, and the base system styles sit at order 0, so a custom style needs an order above the standard Polaris or Coral style. Empty applicability applies a style to all users, while an audience such as managers sees the overrides and everyone else sees the base. A custom theme record needs at least one Core style, and copying a theme record means copying its styles under UX Theme Styles as well. Set glide.ui.polaris.experience to true in sys_properties before you begin, and set glide.ui.polaris.dark_themes_enabled to true if you want to reuse the Next Experience dark variant.

Fonts and images are added through the UX Theme Assets list with the Manage Attachments icon. A font can come in separate files for bold or italic, so upload each one. Images should be in SVG format.

The older override route uses the glide.ui.polaris.theme.custom system property. Before the Xanadu release it was the main way to apply a custom look globally. From Xanadu onward, you can publish several themes and let users choose, and the property is used when the UX Parent App Themes table is empty. Keep it for enforcing one theme across an instance, by pasting the theme’s sys_id as a string value. The Suffix field is required when the override applies to a specific application scope.

Keeping branding through a clone

Create a data preserver under System Clone, then Clone Definition, then Preserve Data. Mark it as theme-related, point it at sys_properties, and set the condition to glide.ui.polaris.theme.custom. Then add clone profile records with empty conditions for the theme tables: sys_ux_theme, sys_ux_style, m2m_theme_style, m2m_style_asset, sys_ux_theme_asset, sys_ux_theme_m2m_asset, sys_ux_theme_customization and m2m_app_theme. Add records for the logo override property, for the theme and variant user preferences, and for sys_attachment when you use a custom logo. If the theme is not published before the clone, publish it afterwards so that it applies on the target instance.

Limits to check before a branding rollout

Theming applies to individual experiences, so configure each one you rely on. In the classic environment, theming reaches Lists, Forms and Dashboards, while custom components do not reflect theming. Check the dark theme on configurable workspaces, lists, forms, dashboards and reports. For the classic portal itself, see how to customize the Service Portal.

Frequently asked questions

Do I need to write code to brand the interface?

No. Theme Builder works without code. Custom style records use raw JSON and are optional, for cases the standard controls cannot express.

Why does my published theme not show for users?

Users must select it from their Theme preference. Refresh the browser after publishing, then check which theme is marked as default and how the others are ordered. For other publishing problems, see the troubleshooting guide for UI Builder and workspaces.

Can I edit the Polaris or Coral theme?

No. Both are fixed base themes. Copy a Theme Builder theme record and make your changes to the copy.

What is the difference between a core style and a variant?

A core style is the active look by default. A variant is an alternate version that users can choose, commonly for accessibility, and it overrides the core style when chosen.

Will my branding survive a clone?

It can, if a data preserver covers the theme tables before the clone. If the theme was not published before the clone, publish it afterwards so it applies on the target.