OBLYTECH Logo
OBLYTECH Logo

Enable territory model

To enable territory model support in Field Service Management, activate the Field Service Territory Planning plugin, then open Field_Service_Territories under All > Territory Planning > Territory Model. With the sn_fsm_tp.territory_admin role, select Active and click Update. The Territory field then appears on the work order task form for territory-based assignment.

Prepare the territory activation change

The model holds the territories mapped to it. Activating that model connects territory selection on work order tasks with the agents or crews associated with the selected territory. Treat the change as an assignment configuration change: the visible field is the first result to check, but it is not the entire acceptance test.

Before making the change, confirm that the Field Service Territory Planning plugin, com.snc.fsm_territory_planning, is active. The role required for enabling the model is sn_fsm_tp.territory_admin. Arrange access for that specific action rather than assuming that access to a planning console includes permission to change the model.

Choose a representative territory, an associated agent or crew, and a work order task for validation. Record what dispatchers currently see for that example. This gives the reviewer something concrete to compare after activation, particularly when territory filtering affects which agent calendars or work order tasks are visible.

Agree who will approve the result before starting. A territory administrator can complete activation, while the operational review should involve someone who understands the intended coverage. The Field Service Management governance model helps place those decisions within the wider ownership structure. Check the configuration on your instance and release before applying the change beyond your validation environment.

Enable territory model activation on the correct record

  1. Navigate to All > Territory Planning > Territory Model.
  2. Open the model named Field_Service_Territories.
  3. Select the Active check box.
  4. Click Update to save the model.

Use the model name as a checkpoint before saving. Seeing a territory-related record does not establish that you have opened Field_Service_Territories. If the expected record or control is unavailable, pause and check the plugin prerequisite and the user’s role before changing other configuration.

After saving, inspect the work order task form for the Territory field. Select a territory appropriate to the validation task and assess assignment to an agent or crew associated with that territory. Keep the test small enough that the reviewer can explain why that territory and resource belong together.

Capture the model name, the saved Active value, the sample task, and the territory selected during verification. Those observations form a clearer change record than a screenshot of a check box alone. They also distinguish a successful save from a completed operational test when the change is handed to the dispatch team.

If the Territory field does not appear after saving, reload the work order task form and confirm that the model still shows Active before concluding that the save failed. Only then move on to the scheduling checks below, so a display problem is not mistaken for a scheduling result.

Check scheduling and visibility after activation

Activating the Field Service territory model changes the context used for scheduling. Agent calendars in Dispatcher Workspace are filtered by territories. Enabling the model also switches the schedule optimization qualifier type (sn_schedule_optim.schedule_optimization_qualifier_type) to Territory, so optimization runs against territories instead of assignment groups. Include both effects in the review so a newly visible task field does not conceal an unexpected scheduling outcome.

Start with the representative resource selected before activation. In Dispatcher Workspace, check whether the calendar view fits the expected territory context. Compare the actual result with the dispatcher’s intended coverage. If the result is surprising, record the resource and territory involved before making further configuration changes.

Next, inspect the Qualifier type for Schedule Optimization value and confirm that it reads Territory. A successful model update and an appropriate optimization context are related observations, but recording them separately makes the outcome easier to review. Do not assume that seeing the Territory field proves the scheduling checks have passed.

The qualifier type is found under All > Field Service > Schedule Optimization > Administration > Properties, and its default value is Assignment group. While the territory model is active, the value stays fixed at Territory. Schedule Optimization also has a separate intraday qualifier, sn_schedule_optim.intraday_qualifier_type, which also defaults to Assignment group, so check that value on its own rather than assuming it followed the batch setting.

Task visibility also needs a conditional check. When the sn_fsm.use_query_rules query rule is active, agents, dispatchers, and qualifiers can view work order tasks created within their territories. Include the state of that query rule in your test notes. Avoid treating a visibility result as a model activation failure before examining the territory context and the rule.

  • Confirm that the intended work order task form contains Territory.
  • Check the selected territory against the proposed agent or crew association.
  • Review the agent calendar in the relevant Dispatcher Workspace context.
  • Record the Schedule Optimization qualifier value and query-rule state.

Overlapping coverage needs its own check. The property sn_schedule_optim.consider_overlapping_territories_for_scheduling controls whether overlapping territories are considered when tasks are scheduled during optimization, and its default value is True. Record that value with the other qualifier observations, so an overlap in a test result can be traced to a known setting rather than to a guess.

Some optimization settings are restricted. The logging verbosity property, sn_schedule_optim.logging.verbosity, defaults to Error and accepts info, debug, warn and error. Editing it requires the maint role, which is exclusive to internal users, so arrange support involvement before the validation run if you need more detail in the optimization log. Setting the level to info or debug adds detail to each optimization log entry, which is useful when a validation run produces an unexpected schedule.

These checks connect the configuration to dispatch decisions. For a wider review of coverage and workload, use Field Service territory planning capacity. Keep that capacity assessment separate in the change record so the activation outcome remains easy to identify.

If the Territory field appears but the operational example fails, describe the failed observation before changing the model again. Was the resource missing from the calendar, was the task outside the expected territory, or was the assignment relationship unsuitable? Work through the recorded checks in that order. A field display problem, a filtering result, and an assignment problem need different evidence, even when they are reported during the same activation window.

Separate task-field activation from console field configuration

The Territory field on a work order task and the information shown in the Territory Planning console have different configuration paths. Model activation exposes the task field. Configuring contextual side panel fields controls which territory information planners see in the console. Choose the path that matches the missing information before altering settings.

For console field configuration, the required role is wm_admin. Navigate to All > app_cmn_field_set.list.do and select FSM Territory Form Fields for predefined fields. The available information includes parent assignment, territory, active, rank, color, and geography. Set Default show to true for a field you want displayed, and use Order values to arrange its position.

Calculated information is configured through FSM Territory Form Calculated Fields. This includes the number of children, qualification groups, dispatched groups, assignment groups, and KPI range. Set Default show to true for the calculated fields to display, then use Order to arrange them. Review the result while logged in as a territory planner.

Use this distinction during troubleshooting. A planner who cannot see geography in the contextual side panel has a different problem from a dispatcher whose work order task lacks Territory. Capture the affected screen and field name in the issue report. That detail directs investigation toward the relevant configuration instead of encouraging repeated model changes.

Keep territory matching and dispatcher scope in view

Once the model is active, a planner can assign a work order task to an agent or crew in a territory from the Territory field on the task form. The Territory Planning console shows each territory’s details in a contextual side panel, and the administrator chooses which fields appear there. These are related setup activities to assess when moving from activation to regular planning.

A sensible handover therefore includes the model state, the assignment example, and any matching or console configuration still awaiting review. Describe unfinished work explicitly. The Field Service Management best practices page provides a broader framework for coordinating the follow-through.

Dispatcher search scope deserves particular care. Dispatchers can add agents from assignment groups or territories they manage. An administrator can enable searching for agents outside that scope through Enable dispatcher to add agents outside of their assigned assignment groups / territories on Configure settings. Finding an agent does not grant permission to assign tasks to that agent; the dispatcher must manage the agent’s assignment group or territory.

For help planning this work, see ServiceNow implementation.