OBLYTECH Logo
OBLYTECH Logo

Global Search in configurable workspaces

Global Search in configurable workspaces lets CSM agents search defined sources from Unified Navigation. In CRM Workspace, agents can switch between global results and workspace application results. When moving from CSM Agent Workspace, check the workspace’s UX page property, its search application configuration, and the sources available to agents.

How Global Search in configurable workspaces fits together

The search field is the entry point, but the search application configuration determines the engine and settings behind the experience. CRM Workspace includes the configuration named [CSM AIS] Configurable Workspace Search Config. Find it through AI Search > Search Experience > Search Applications.

Keep three configuration layers separate during investigation: the workspace reference to a configuration, the configuration’s search sources, and the indexed content those sources expose. A visible search field does not establish that the intended sources are connected. Likewise, finding a configuration record does not establish that the workspace points to it.

The legacy global search configuration table is sys_aw_global_search_config. Its UI Builder counterpart is sys_ux_page_property. Treat that mapping as the starting point for tracing the workspace configuration, rather than assuming the legacy table remains the place to make changes.

Terminology and setup details differ across releases: Brazil uses CRM Workspace, while the Australia procedure here uses CSM/FSM Configurable Workspace. Check names and behavior against your instance and release before applying changes. AI Search replaced Zing for this workspace experience starting with Utah.

Verify the workspace reference after migration

The migration verification action for CSM Configurable Workspace requires the admin role. Migration keeps the source lists as they were. What moves is the pointer. The workspace now reads its search configuration from a UX page property rather than from the legacy table, so that pointer needs checking as its own step. A source that is missing or mapped to the wrong guidance input shows agents a thinner result list, and sometimes an empty one, so the mapping deserves a check before anyone edits query wording.

Start in All > Now Experience Framework > Experiences and open CSM/FSM Configurable Workspace. Read the pointer first, because every later check depends on it.

In the UX Page Properties related list, open globalSearchDataConfigId. Its value is the sys_id of the search application configuration the workspace uses.

Next, compare the mapped sources with the ones CSM Agent Workspace relies on, and add or adjust sources where the mapping has gaps. Finish by confirming that the mapped sources reach the guidance inputs, since that is the point where an agent actually sees a result.

Record the property value and configuration name before changing anything. This gives the person investigating a missing result a concrete reference to follow. A sensible review sequence is workspace reference first, source mapping second, and an agent search last. Changing several layers together makes it harder to determine which correction affected the result.

For example, choose a known case and a known account for an acceptance check. Search for each after the mapping review and record the selected result scope. These are suggested test records, not additional configuration requirements. Their purpose is to connect the configuration review to an observable agent outcome.

Check source coverage before tuning search terms

CRM Workspace adds indexed sources for Account [customer_account], Case [sn_customerservice_case], Consumer [csm_consumer], Contact [customer_contact], Order Line Item [csm_order_line_item], Order [csm_order], and Catalog item [sc_cat_item]. Use those table names when documenting which content the workspace is expected to search.

Start with the type of record an agent cannot find. A missing contact and a missing order line item point to different source coverage checks. Avoid treating an empty result as evidence that the user chose a poor phrase before reviewing the source behind that record type.

A suggested test set should include distinct business records rather than several variations of one case. Try an account, its contact, a case, and an order where those sources are relevant. Write down the expected record, the query entered, and the actual result. That small record of expectations helps separate a source omission from a query matching problem.

After source coverage is understood, use the ServiceNow search operators guide for a separate review of query formulation. Keep workspace source configuration and search wording as separate investigation steps so a change to one does not hide a problem in the other.

Use result scope, navigation tabs, and facets deliberately

The Unified Navigation search field supports switching between global search results and CRM Workspace application results. The configurations behind those scopes are based on different tables. During testing, note which scope is selected before comparing outcomes. Two searches with the same words can otherwise be an unclear comparison.

Navigation tabs provide static filtering by indexed source. The supplied configuration includes All, Cases, Accounts, Contacts, Consumers, Orders, Order Line Items, and Locations. Use the relevant tab when checking a specific record type, and return to All when reviewing the broader result set.

Facets refine results using field values. The supplied facets include State, Priority, Assignment Group, Product, Account, Contact, Consumer, Needs Attention, Action Status, Channel, and Active Escalation. Tabs and facets therefore answer different questions: which source to examine, and which field values to retain within the result set.

For a reproducible test, record the scope, tab, and facet selections alongside the query. Begin with a broader result set, then add a field filter and compare the remaining records. This is an acceptance testing recommendation; it does not require changing the supplied configuration.

Keep a separate investigation for information surfaced in the context of an agent’s work. The contextual search configuration guide addresses that neighboring setup question without replacing the checks for Unified Navigation search.

Review customized Zing sources during the AI Search move

Custom changes deserve an explicit migration checklist. Sources added or modified in Agent Workspace Search Config need migration to AI Search. Sources deleted from Agent Workspace Search Config need manual deletion from [Migrated] Agent Workspace Search Config. A deletion in the earlier configuration is therefore a separate item to verify.

Guided setup is available through All > AI Search > AI Search for Next Experience > Guided Setup for Zing to AI Search Migration. Running the migration needs the AI Search for Next Experience application installed, the prerequisite Guided Setup tasks finished, and the ais_admin role. The task creates a new AI Search configuration and leaves the original Zing configuration in place, so compare both before removing anything. Use it to organize the applicable migration tasks. For a broader setup sequence, see AI Search setup and migration for Next Experience.

Build the migration review around added, modified, and deleted sources. For each item, record the intended destination or removal, then test a representative search.

Validate fuzzy matching with indexing checks

Fuzzy numeric search, in Brazil, matches an all-digit search term against the Number field of numbered records. It ignores the alphabetic prefix and leading zeroes, so 23583 can return KB00023583 and PRB00023583. A term that mixes letters and digits, such as KB52578, is not corrected to KB00052578. Exact matches receive priority while close matches can also appear. In Brazil, fuzzy numeric search is off by default. An administrator turns it on by setting the system property glide.ais.query.enable_fuzzy_number_match to true, which applies to all AI Search applications. A second route runs through activating Case Management Core (com.sn_customerservice), which runs a fuzzy-matching script for global search and the Recommended Actions component. Check which mechanism your instance uses before changing anything.

After enablement, the system administrator needs to re-index the tables used by AI Search. Check the fuzzy matching state with the background script gs.info(new sn_ais.AisUtil().isFuzzyNumberMatchEnabled()); and expect true. Also check that AI Search is enabled.

Re-indexing runs from All > AI Search > AI Search Index > Indexed Sources. Select the table you need, choose Index All Tables, and then return to the homepage. A global search against one of the re-indexed tables shows whether fuzzy results now appear.

For acceptance testing, search a full number such as 73492 and a shorter all-digit suffix such as 3492, then record which Number-field records appear and in what position. Test a version with a letter typed in as a separate case, expecting no fuzzy match. The result shows how matching behaves for that query. It does not show that every fragment will retrieve the same record. Keep the exact query and the table reviewed with any fuzzy report, since a report that a number search failed gives a reviewer nothing to reproduce.

Questions for workspace search handover

Does the supplied tab list exactly mirror the indexed source list?

The two supplied lists differ: Locations appears among the navigation tabs, while Catalog item appears among indexed sources. Review them separately when documenting coverage instead of deriving a complete source inventory from visible tab labels.

Did Utah zBoot instances need the same starting setup?

Utah zBoot instances used AI Search as the default for global search and the workspace application. Include the instance’s starting configuration in a migration handover rather than assuming all environments began with Zing.

What belongs in the final acceptance record?

A recommended handover records the workspace configuration reference, reviewed custom sources, representative queries, expected records, and observed results. Include unresolved gaps and a named follow-up owner so a successful sample search does not close unrelated issues.

For help planning or carrying out this work on your instance, see our ServiceNow implementation services.