To configure pre-chat after upgrading, activate the two predefined customer surveys, disable the legacy portal header chat option through csp.legacy_chat, and activate CSP Chat. An admin should complete these changes, then test logged-in and anonymous journeys to check that customers reach the intended survey and agents receive the conversation context.
Scope the upgrade checks before changing chat
Start with the Consumer Service Portal experience that customers actually use. Record the portal, the current chat entry point, and whether your test customer is signed in. These details let you compare the experience before and after configuration without confusing an authentication difference with a failed change.
The upgrade configuration procedure requires the admin role for survey activation, the legacy chat property change, and CSP Chat activation. Have that administrator perform the changes and retain the resulting record values for review. Do not treat the appearance of a chat icon as sufficient evidence that both customer journeys work.
Test the sequence on a non-production instance running the same release before changing production. Separate configuration verification from decisions about new survey questions or routing changes so that failures remain easier to isolate.
The wider ServiceNow live chat journey includes what happens after the customer starts a conversation. For this upgrade task, define completion around the entry point, survey selection, collected information, and the agent’s ability to review that information.
Configure pre-chat after upgrading by activating both surveys
The predefined surveys serve different audiences. CSP Pre-Chat Survey collects initial information from customers who are logged in. CSP Anonymous Pre-Chat Survey collects it from people who are not logged in. Verify the two records separately, even when your initial test uses just one type of customer.
- As an admin, navigate to Conversational Interfaces > Pre-Chat Survey.
- Open CSP Pre-Chat Survey.
- Select Active on the form, then click Submit.
- Open CSP Anonymous Pre-Chat Survey and repeat the Active and Submit steps.
After saving, inspect both survey records again. Record which survey was activated and which audience it serves. This creates a clear baseline for testing: a signed-in session should exercise the authenticated journey, while a session without a login should exercise the anonymous journey.
Use a short, recognizable issue description when testing. For example, choose a description that the tester and agent can identify without using customer information. Later, compare what the customer entered with the context available to the assigned agent. This checks the information flow as well as the visible form.
If your organization has changed survey questions, note those differences before testing. Keep a record of the existing question set and the expected answers. An activation check becomes harder to interpret when survey design is being changed at the same time.
Remove the legacy header entry point with the property value
The legacy form-based widget has its own configuration step. The value required for this upgrade procedure is csp.legacy_chat set to true. Despite the property’s name, that value disables the Chat option in the portal header. Judge the change by the specified value and visible result.
- As an admin, open the System Properties list from the filter navigator (the sys_properties table), then search for csp.legacy_chat.
- Set its value to true.
- Click Update.
Inspect the portal header after the update and record whether the legacy Chat option has disappeared. Keep this observation distinct from the next check, which concerns the Open chat window icon. The two checks establish that the old entry point was disabled and the intended entry point was enabled.
If the header still shows the earlier experience, first compare the stored property value with the portal and session being tested. Capture what you see before making further changes. Avoid changing unrelated properties on the assumption that any setting containing the word chat belongs to this procedure.
For planning around configuration reversals, see ServiceNow rollback fix scripts. Retain the previous property value and survey activation states in your change record so a reviewer can understand the exact configuration delta.
Activate CSP Chat and verify the new launch experience
Once the survey records and legacy property are set, enable the chat widget for the Consumer Service Portal. This step supplies the portal header icon customers use to start the pre-chat survey and connect with an agent.
- As an admin, navigate to Service Portal > Agent Chat.
- Open CSP Chat.
- Select Active.
- Click Submit.
Check for the Open chat window icon in the portal header. Then use it from the customer session instead of relying on the administrator’s configuration screen. A saved Active value establishes the record state; the customer test establishes what that portal session presents.
Run one signed-in test and one anonymous test, using a different issue description for each, and check both against the pass criteria in the list below.
Review failures in sequence. If the intended icon is missing, inspect CSP Chat activation. If the survey journey differs between login states, inspect the corresponding survey record. If the older header option remains visible, inspect the legacy property. These are investigation starting points tied to the changed settings, rather than reasons to alter the entire chat configuration.
For help coordinating this work, see ServiceNow implementation.
Check that survey answers support the agent handoff
Pre-chat collects context before the agent begins the conversation. Advanced Work Assignment uses the survey answers to route each chat to the right queue. The assigned agent can review the issue context before entering the conversation. Test with an expected destination and a specific issue description so the result can be assessed.
Ask the receiving agent to identify the test description and describe whether it supplies enough context to begin the conversation. Record the actual queue or group alongside the expected one. A visible survey is one checkpoint; a usable handoff is another.
If the destination is unexpected, keep the collected answers and routing result together for investigation. Do not assume that reactivating a survey will resolve a queue configuration problem. Survey availability and the interpretation of its responses should be examined as separate observations.
The distinction matters when reviewing Customer Service Management automation opportunities: a routing decision depends on the information entering the process. First establish that the upgraded entry journey collects the intended context, then assess changes to downstream automation.
Use separate pass criteria for each test rather than a single result labeled chat works. A test can pass survey launch and still fail the handoff. That detail helps the next administrator reproduce the problem without repeating the entire change.
- For the signed-in customer, record the authenticated survey experience and the issue context received by the agent.
- For the anonymous customer, record the survey experience without a login and identify the corresponding conversation.
- For the header, record the absence of the legacy Chat option and the presence of the intended launch icon.
- For routing, record the expected and observed destinations using the same test issue description.
Close the change with a compact evidence record: the two survey activation states, csp.legacy_chat value, CSP Chat activation state, screenshots or notes for both customer journeys, and the agent handoff result. Assign any remaining issue to the setting or handoff stage where the test first diverged from its expected result.
Questions about survey choices and upgrade prerequisites
Why does an upgraded instance need manual survey activation?
The base system activates the predefined surveys by default. Upgraded instances require manual activation to avoid conflicts with previous configurations. Treat that distinction as a reason to inspect the existing setup before enabling the predefined records, particularly where earlier portal work changed the customer experience.
Which plugins are prerequisites for pre-chat surveys?
Pre-chat surveys require Consumer Service Portal (com.glide.service-portal.consumer-portal) and Glide Conversation Server (com.glide.cs). Include their activation status in readiness checks. If a prerequisite is absent, resolve that dependency through your instance’s plugin activation process before assessing the survey journey as an upgrade defect.
Can the predefined surveys be replaced with another survey?
You can define a different survey or modify the predefined surveys. Treat that as a deliberate design decision with its own review of questions and customer context. Record the intended survey choice so testers can distinguish an approved variation from an unexpected result.
Can a customer’s issue description influence Virtual Agent topics?
Natural Language Understanding can use a response to the standard issue-description question to identify an appropriate Virtual Agent conversation topic. Relevant topics can then be presented automatically to the requester. If your experience uses that behavior, include representative descriptions in testing and inspect whether the suggested topic fits the customer’s issue.