OBLYTECH Logo
OBLYTECH Logo

Unified routing of email interactions via CCaaS

A customer replies to an email that an agent has already put on hold. Whether that reply reaches an available person depends on how CCaaS routing and ServiceNow share the agent’s capacity. This section explains how to test that path. In ServiceNow, holding an email interaction informs CCaaS that agent capacity can be reused. A returning customer reply resumes work, with optional rerouting when the assigned agent is unavailable.

Routing and handling are separate acceptance criteria for email

The routing decision and the customer response need separate acceptance criteria. Routing determines who receives the interaction. Handling determines whether that person understands the conversation and sends an appropriate reply. Bringing channels into one engine helps coordinate assignments, but your rollout should test both responsibilities.

The stated benefits of this model are a single routing engine for email and voice, and less manual work, because interaction assignment is automated and the setup load is lower. Those benefits are the reason to run the tests in this section, and they do not show that any one scenario works.

Start with a small set of email scenarios that reflect how your team works: a new inquiry, a conversation waiting for the customer, and a reply arriving after the original agent becomes unavailable. For each scenario, record the expected interaction state, assignment, and capacity outcome before running the test. This gives administrators and supervisors a shared basis for reviewing results.

Use Brazil behavior as the baseline described here and check it against your instance and release. Avoid treating a working voice route as proof that the email lifecycle is correct. Voice and email can share routing logic while still needing separate tests for waiting periods and returning replies. Teams coordinating synchronous channels can connect this review with their ServiceNow live chat workflow.

Test the hold and customer reply lifecycle

An agent can place an email interaction on hold while waiting for a response. The hold sends a status notification to CCaaS so the engine can use the agent’s capacity for other work. The operational check is therefore broader than seeing a different state on the record: observe whether the routing side receives the change.

  1. Begin with an email interaction assigned to an agent and record the current assignment.
  2. Have the agent place the interaction on hold while awaiting customer input.
  3. Check the resulting status, then confirm with the person who administers CCaaS routing that the hold notification was received.
  4. Send a customer response through your agreed test process.
  5. Verify that the interaction changes from On Hold to Work in progress.
  6. Compare the assignment outcome with the rerouting setting and the original agent’s availability.

Keep the observations together as one test record. A successful hold followed by a failed resume is an incomplete lifecycle, even if the initial notification reached the routing engine. Conversely, a resumed interaction does not establish that capacity was released correctly while it waited.

Timing settings belong in the same test record. The property sn_eaai_csm.period_of_customer_inactivity_to_close_interaction sets the number of days after which an interaction closes when no customer email arrives, and its default is 5. The property period_for_reminders_to_customers_interaction controls when an automatic reminder goes to the customer, and reminders apply only to interactions that are on hold. Its default is 2 days, and a zero or negative value also falls back to 2. If a held test runs past either window, the state change you see may come from the timer rather than from routing, so record the values in use before you read the result.

Agree what evidence the supervisor needs before accepting the result. Record the interaction identifier, agent, before-and-after values, and observed routing outcome. These are recommended test notes, rather than additional ServiceNow configuration fields. They help distinguish a capacity issue from a conversation-handling issue without relying on recollection.

Decide whether unavailable agents should keep returning emails

The system property sn_eaai_csm.email.reroute.enabled controls optional rerouting of returning held email interactions when the assigned agent is unavailable. Its default value is false. Setting it to true enables that behavior. In the enabled rerouting path, ServiceNow clears Assigned to and triggers an event in CCaaS so the engine can send the interaction to an available agent.

This is an ownership decision as well as a technical setting. Keeping continuity with the original agent may suit conversations that depend on prior investigation. Allowing a different available agent to continue can suit a queue where responding to new customer information takes priority. Decide the intended outcome with the service supervisor before changing the property.

Ask the administrator responsible for system properties to manage the change through your normal process. The property sits under All > System Properties > All Properties, and you can also reach the list by entering sys_properties.list in the filter navigator. Then test an unavailable original agent with the property enabled and disabled. Capture the actual value used for each test; otherwise, two apparently inconsistent outcomes may simply reflect different configurations.

For the enabled case, inspect assignment clearing and the subsequent CCaaS routing outcome separately. An empty Assigned to value is an intermediate observation, not sufficient evidence that a second agent received the interaction. Verify that someone can continue the conversation before accepting the test.

With sn_eaai_csm.email.reroute.enabled set to false, a customer reply still moves the interaction to Work in progress, but nothing is rerouted and the interaction stays with the original agent. Run this disabled case first so you have a baseline. The enabled test then shows whether any difference comes from the property rather than from another change in the environment.

For help planning this work, see ServiceNow implementation.

Separate CCaaS routing from manual assignment checks

ServiceNow also supports email interaction assignment through Advanced Work Assignment. When an agent accepts an email interaction routed by AWA, the state changes from New to Work in progress and the interaction is assigned to that agent. Record which routing mechanism your test uses so an AWA acceptance result does not become the evidence for a CCaaS rerouting test.

Manual assignment has its own prerequisites. The required role is sn_customerservice_agent, sn_customerservice_manager, or sn_customerservice.consumer_agent. The Assign to me button appears when the interaction is in New and Assigned to is empty.

  1. Navigate to All > CSM/FSM Configurable Workspace.
  2. Select the List icon, then My Interactions under Interactions.
  3. Open the interaction and inspect its state and assignment.
  4. To take it yourself, select Assign to me.
  5. To assign another agent, select that agent in Assigned to and select Save.

If Assign to me is absent, inspect the two visibility conditions before treating the issue as a routing failure. A conversation that already has an owner is a different test condition from an unassigned New interaction. Keep manual corrections in the test notes, because a supervisor’s intervention can conceal the outcome you intended to measure.

Include that distinction in your review of common CSM mistakes so teams know which observations demonstrate routing behavior.

Check the conversation after reassignment

A receiving agent needs to understand the email before continuing it. Case email preview requires sn_customerservice_agent. In CRM Workspace, open a case, select Emails, and choose a message from the list. The message opens in a sub tab with its details. The agent can select Reply, Reply All, or Forward.

Use this review during handoff testing. Ask the receiving agent to identify what the customer supplied and what response is needed next. This checks the human continuation of the conversation after the routing test has established ownership. Keep the review focused on the actual message rather than assuming the new assignee already knows its history.

Review response templates in a separate step. Composing from a template requires sn_customerservice_agent. Open a case in CRM Workspace, select the Email tab in the Compose panel, then select the Email Templates tab in the contextual side panel. Choose a template, inspect its expanded details, and select Apply Template.

A template can supply recipients, sender, subject, and message body values. Applying it overwrites existing values in the configured fields. Have the agent inspect those fields before selecting Save as draft or Send Email. Drafts are stored in Draft Emails on the case record. Assignment accuracy and response accuracy deserve separate checks.

Make the rollout decision from observable outcomes

Use a short acceptance checklist covering initial routing, hold notification, returning replies, unavailable agents, and conversation continuation. Name the person who reviews each result and retain the configuration value with the test evidence. A test should explain both who received the work and why that outcome matched the agreed policy.

Investigate failures at the point where expectations and observations first diverge. If the interaction resumes but remains unassigned, review the rerouting event and downstream routing outcome. If assignment is correct but the response is wrong, review message handling and template use. This sequence keeps separate problems from being grouped under a vague email-routing complaint.

Once the pilot has passed, add the accepted checks to your CSM operating practices.